FAR Ltd · ASX:FAR
FAR — Credit Suisse 4th Annual Australian Energy Conference 2017
28 slides from FAR's conference presentation, Jun 15, 2017

Slide 1: Investor presentation
Investor presentation Credit Suisse: 4th Annual Australian Energy Conference 14/15 June 2017

Slide 2: Our Company
Our Company • Fifth largest E&P on the ASX: Market cap A$421M1 • Strategic focus Mauritania-Senegal-Guinea-Bissau (MSGB) Basin, NW Africa • 8 exploration permits in MSGB Basin • Basin opening discoveries in Senegal in 2014 • Progressing towards first oil from SNE Field 2021 • Strong balance sheet: c

Slide 3: FAR Shareholder summary
FAR Shareholder summary • Top 200 shareholders Top 200 shareholders by type own 70% of FAR Institutions 48% • FAR’s shareholders are predominantly Family Office 13% located in Australia Private 29% • 3 substantial shareholders: Other 10% – Meridian Asset Management Top 200 shareholders by location –

Slide 4: FAR in Senegal
FAR in Senegal • FAR in Senegal since 2006 FAR LICENCES OFFSHORE SENEGAL, • Basin opening FAN-1 and SNE-1 oil discoveries, 2014 THE GAMBIA & GUINEA-BISSAU • SNE ranked as worlds largest oil discovery in 2014 • JV invested ~ US$800M in three years • 9 deep water exploration/appraisal wells with a 100

Slide 5: FAN-1 and SNE-1 opened up Senegal
FAN-1 and SNE-1 opened up Senegal Industry hotspot - increased investment and activity • FAR discoveries 2014 • 7 successful SNE appraisal wells drilled over 2015/16/17 • 100% drilling success to date • Major gas discoveries made in 2015, 2016, 2017 • BP farm-in to Kosmos acreage introduces a large

Slide 6: SNE Field geological setting and discovery well
SNE Field geological setting and discovery well SNE-1 oil discovery (Nov 2014) • Oil gravity 32 degrees API • Gross oil column 96m • FAR gross contingent resource* P90 (1C): 348 mmbbls, P50 (2C): 641 mmbbls, P10 (3C): 1,128 mmbbls • Excellent reservoir rocks in 2 main families: lower and upper reser

Slide 7: SNE Field evaluation program
SNE Field evaluation program • Commenced appraisal drilling in Nov 2015 • Seven successful appraisal wells now drilled • Pre-development appraisal completed • Objectives of the appraisal program: – Size of oil pool – 641mmbbls 2C recoverable oil*. Exceeded minimum economic field size (MEFS) of 200mm

Slide 8: Size of the SNE oil field
Size of the SNE oil field Pre-Drill Post discovery RISC audited Latest RISC audited (Oct 2014) (Nov 2014) (April 2016) (August 2016) P90 : 50mmbbls 1C: 150 mmbbls 1C: 277 mmbbls 1C: 348 mmbbls P50 : 154 mmbbls 2C: 330 mmbbls 2C: 561 mmbbls 2C: 641 mmbbls P10 : 350 mmbbls 3C: 670 mmbbls 3C: 1071 mmbb

Slide 9: Deliverability and connectivity of reservoirs
Deliverability and connectivity of reservoirs • DST’s conducted on SNE-2, SNE-3, SNE-5, SNE-6 • Pressure gauges installed in SNE-3 and SNE-5 • Lower reservoirs flowed at world class rates (SNE-2) • Deliverability and connectivity testing of upper reservoirs completed in May 2017 SNE-5 SNE-4 SNE-6 SN

Slide 10: SNE Appraisal results and impact on exploration
SNE Appraisal results and impact on exploration • All appraisal wells proved 97m gross oil column • MEFS passed: 2C resource 641 mmbbls • Size, deliverability and connectivity now understood and pre- SNE Field at S460 reservoir level development appraisal drilling completed showing Sirius and Spica

Slide 11: Efficient drilling, lower costs
Efficient drilling, lower costs • Currently using the Stena DrillMAX – a 6th generation, dual mast, dual BOP drill ship • 2017 drilling program significantly ahead of planned AFE • Drilling completed successfully and safely • Daily rig rates reduced by 70% since first drilling campaign in 2014 • Gre

Slide 12: Looking forward to development of SNE
Looking forward to development of SNE • SNE is expected to be a staged development using a standalone FPSO, with expansion capability for satellite tie-backs • Development based on 70-80 development wells, with 20-25 wells required in Phase 1 • First oil anticipated in 2021, with plateau gross produ

Slide 13: First pure exploration well planned since 2014
First pure exploration well planned since 2014 • 500m of oil intersected in FAN-1 well – Prolific oil source rock – No OWC encountered – Seismic amplitudes suggest better quality reservoir to SW • New 2015 3D seismic shot along shelf edge trend from SNE • Extensive portfolio of exploration prospects

Slide 14: The Gambia licence acquisitions
The Gambia licence acquisitions • In line with FAR’s strategy to focus on NW THE GAMBIA African shelf following Senegal success Farm-in to 80% interest with operator rights Erin Energy 20% partner • FAR payment of US$5.18M to Erin, due on Government approval • Well at end 2018 • Large equity positio

Slide 15: Blocks A2 and A5 prospectivity
Blocks A2 and A5 prospectivity • Sama prospect defined on 3D seismic approximately 500mmbbls recoverable* • 1,504km2 3D seismic data acquired in 2015 • Seismic reprocessing planned before drilling in 2018 *Gross, unrisked, recoverable, best estimate of prospective resources, oil only 15

Slide 16: Extension of the SNE shelf edge trend
Extension of the SNE shelf edge trend • On trend and adjacent to SNE field – same play type • 1,504km2 3D seismic data acquired in 2015 • Sama prospect defined on 3D seismic: – Access to same, prolific source kitchen as SNE – Same upper/400 series reservoirs as SNE – Thickening of 400 series sands t

Slide 17: AMI with CNOOC
AMI with CNOOC • Area of Mutual interest agreement with CNOOC • Covering the designated area offshore Senegal and The Gambia • CNOOC one of the largest independent oil and gas producers in the world • Complementary skills enhance FAR and CNOOC ability to secure additional acreage 17

Slide 18: FAR's milestones in the Senegal project
FAR’s milestones in the Senegal project MAR 2013 JUL 2013 APR 2014 OCT 2014 OCT 2014 NOV 2014 Farm down to Farm down to Spud FAN-1 Discovery Spud SNE-1 Discovery Cairn Energy COP at FAN-1 at SNE-1 announced announced DEC 2014 JUL 2015 NOV 2015 JAN 2016 JAN 2016 FEB 2016 SNE Contingent Gvt awards 3 y

Slide 19: Community & social programs
Community & social programs Investing in education & training, enterprise & Renovated a primary school community development programs in the regional city of Thiess through our Senegal joint venture Sponsored regional soccer competitions through provision of 200 balls and uniforms

Slide 20: Moving forward in 2017
Moving forward in 2017 • 2013: Year of farmout • 2014: Year of discovery • 2015-2017: Appraisal of the SNE Field • 2017-2018: Development planning and studies • 2018-2021: Engineering, financing & construction • 2021: First oil from Phase 1 SNE development • 100% success rate to date offshore Senega

Slide 21: Contact us
Contact us Level 17, 530 Collins Street Melbourne VIC 3000 Australia T: +61 3 9618 2550 info@far.com.au far.com.au Connect with FAR Limited:

Slide 22: Disclaimer
Disclaimer • This presentation has been prepared by FAR Limited (‘FAR’). It should not be • This presentation does not purport to be all inclusive or to contain all considered as an offer or invitation to subscribe for or purchase any shares in information which you may require in order to make an i

Slide 23: Additional slides
Additional slides “SFARLimited

Slide 24: Board and management
Board and management Experienced Board and management with strong relationships in Africa

Slide 25: Board with significant experience
Board with significant experience Nicholas Limb Geophysicist and investment banker Non-Executive Chairman 15 years as MD/Chairman of an ASX listed, international mining company, Australia. Appointed 2012 10 years in Financial services with May and Mellor and HSBC. 38 years industry experience in the

Slide 26: Senior management
Senior management Catherine Norman Over 20 years experience in the mineral and oil & gas exploration industry, having held executive positions Managing Director both in Australia and in the UK. Cath has carried out operating assignments in Europe, Africa, the Middle East and Australia. Cath is a geo

Slide 27: Share price (A$p.s.)
FAR relative performance • Better performance than ASX200 so far 2017 • Risk being removed from SNE development Relative performance – since 1-Jan-17 • FAR funded to FID $0.10 • Market sentiment more positive on the whole – balance sheets adjusted for “lower for longer” oil price $0.09 FAR: Share pr

Slide 28: DST Results
DST Results SNE-2 tested lower and upper reservoirs units • Gross 12m lower sands: 8,000 bopd through 3/4“ choke (stabilised constrained flow) • Gross 15m upper sands: 1,000 bopd on a 3/8“ choke (unstabilised) SNE-3 tested upper reservoir units • Gross 15m: 5,400 bopd max flow / 4,000 bopd through a
Source: Internet Archive copy of far.com.au
More decks from FAR Ltd
Shareholder Meeting (May 2023)11 slides · May 31, 2023
Shareholder Meeting (May 2022)24 slides · May 31, 2022
Investor Presentation (September 2021)21 slides · Sep 21, 2021
Investor Presentation (September 2021)21 slides · Sep 6, 2021
Investor Presentation (July 2021)10 slides · Jul 22, 2021
Investor Presentation (July 2021)11 slides · Jul 22, 2021