Montea NV · EURONEXT:MONT
Montea NV — Investor Day (June 2024)
43 slides from Montea NV's investor day presentation, Jun 5, 2024
Slide 1: Capital Markets Day ESG
4 – 5 June 2024 CAPITAL MARKETS DAY ESG Dirk van Buggenhout - CSO
Slide 2: Slide 2
Slide 3: Location Location Location
Loeatt ON Location Locattl ©) il
Slide 4: What makes a location a prime location?
What makes a location a prime location?
Slide 5: City Centre
DILBEEK’ Dilbeek\~ feet eee Westland: Shopping (pte teat NEERPEDE! ibis\Budgeuriotel “prsse) zat Ruisbroek SCHEUTOM § Se ue VEEWEIDE! Gia RAD MAP KALEVOET: i) City Centre |ATONGE-——_} fas Elsene 261 Sint;Gillis @ Hontamuseum LOUISE N261 2) waa HOOGTE.100, WM Europa Ziekenhuizen Hivan'BrusselesSite S
Slide 6: Why brownfields?
Why brownfields? 75% 6
Slide 7: Forest
Forest 6.000 t 9.500 t 17.500 t disposal of disposal of reuse contaminated rubble contaminated soil crushed concrete 1.000 t 100 t 250 t 1t recycling recycling landfill landfill metal demolition roofing demolition residual waste asbestos
Slide 8: Transgenerational sustainable strategy
Transgenerational sustainable strategy Location Building Tenancy
Slide 9: Sustainability facts: existing portfolio
Sustainability facts Montea existing portfolio Use of local renewable energy: 95% in 2023 Targets -55% NET-ZERO CO2 in 2030 in 2050 Actions Energy efficiency GHG reduction Relighting Green energy contracts 80% in 2023 I 100% in 2030 68% in 2023 I 100% in 2030 Additional façade insulation Use of loca
Slide 10: Sustainability facts: Montea developments
Sustainability facts Montea developments Energy intensity max 25 kwh/m²/year target for 2030 already achieved in 2023 Targets -55% NET-ZERO CO2 in 2030 in 2050 Actions Energy efficiency GHG reduction • Airtight building and loading docks • Solar plants • Natural daylight in combination with • Fossil
Slide 11: Sustainable & flexible development
Sustainable & flexible development Smart use of space Energy efficient and low co2 Well-being Biodiversity Circular construction Environment
Slide 12: Global CO2 emissions
Global CO2 emissions Other 6% Transport 28% Building 23% operations Building materials 11% & construction Industry 32%
Slide 13: What is embodied carbon?
What is embodied carbon? Greenhouse gas emissions associated with • manufacturing • transportation • installation • maintenance • disposal of construction materials Cradle to gate embodied carbon Operational carbon End of life carbon Extraction Manufacturing Construction Repair Demolition Disposal R
Slide 14: Whole life carbon assessment stages
"| ae Gate Practical © End of i Completion Use : ' ' ' ' ' ' ' q oie) ! | ' : ‘ ! ' — - 1 H ' A al} _ 1 Product ‘Construction; ' End of Life }| Benefits i 1 ‘ ' ‘) and Loads ' A1-A3_ | A4-AS ; 1 C1-C4 D 17Al Raw Materials 1 Ad Transport 1 1*C1 Demolition _—_j} “Element Reuse 4°A2 Transport 1 °AS Con
Slide 15: Life Cycle Assessment = Overall Carbon Impact
Life Cycle Assessment A full Life Cycle Assessment includes a variety of environmental impact categories such as the global warming potential (GWP), acidification potential (ADP), ozone depletion potential (ODP) etc. We only focus on the global warming potential (GWP) also known as the carbon impact
Slide 16: LCA: Embodied carbon analysis
LCA: Embodied carbon analysis Whole life cycle analysis: 355 KG CO2/m² Demolition today Module A Module B Module C Module D Façade Foundations Load Bearing Elements Energy system Roof Non-load Bearing Elements
Slide 17: Sustainable materials
Sustainable materials Use of low-CO2 materials drastically reduce embodied carbon.
Slide 18: Slide 18
Slide 19: Insert animation on building features
Insert animation on building features
Slide 20: Super-insulated dock levellers
Super-insulated dock levellers Classic loading dock Our insulated loading docks
Slide 21: Smart skylights and building features
Smart skylights or façade lights bring in natural daylight and create a pleasant and healthy working environment. bikesheds with charging EV-charging High efficient points for e-bikes facilities HVAC
Slide 22: Energy
Energy Energy Energy
Slide 23: Battery Energy Storage System - Why
Battery Energy Storage System - Why
Slide 24: Yearly electricity consumption in BE
Yearly electricity consumption in BE
Slide 25: On our way to 100% renewable energy
On our way to 100% renewable energy 68 MWp solar panels 2023 → 95% of our warehouses End of 2024 87 MWp solar panels → 100% of our warehouses
Slide 26: Montea invests €30M in Battery Energy Storage System
Montea invest €30M in ambitious Battery Energy Storage System
Slide 27: Battery Energy Storage System – Locations BE
Battery Energy Storage System – Locations BE 14 different BESS-locations Antwerp 35 MWH installed by the end of 2024 Ghent Brussels Liège €17,500,000 investment Charleroi 12% min IRR
Slide 28: Battery Energy Storage System – Locations NL
Battery Energy Storage System – Locations NL 7 different BESS-locations 21 MWH Amsterdam under consideration €12,500,000 Tiel Waddinxveen Beuningen investment Oss 12% Etten-Leur Tilburg min IRR
Slide 29: Organisation
Organisation
Slide 30: Organisation
Organisation Board of Directors ESG Steerco Sustainability Audit Committee Teams
Slide 31: Sustainability highlights: Montea Operations
Sustainability highlights Montea Operations On the way to net-zero Targets Greenhouse Gas Emissions Neutral NET-ZERO since 2021 in 2030 Actions Green electricity Carbon footprint Electric fleet 100% 3.5 tCO2/FTE 61% in 2023 100% in 2023 (reduction of 19% compared to 2022) in 2027
Slide 32: Roadmap
Roadmap
Slide 33: Decarbonisation Timeline: CSRD, EU Taxonomy
Decarbonisation Timeline installed capacty of ‘tleact 200GW af EU Taxonomy create eer + Reda nary testy Em pared te 2022 CREM rget *0i3 Cer) 2 MONTEA ‘This decarbniation timeline retireto aceries of am ot reducing or euninaing ‘5 the Pris Agreement’ goa to ini gota warring to ell bel 2 degrees Ces s
Slide 34: Transparent information for all stakeholders
Transparent information for all stakeholders report > . Report on Companies sustainability at within the EU company level E22, End User » Information on sustainability in the financial sector - Financial products SFDR than The classification for green investments - turnover is classified onomie
Slide 35: ESRS - overview
ESRS - overview Cross-cutting Topical General Environment Social Governance ESRS 1 ESRS E1 ESRS S1 ESRS G1 General requirement Climate change Own workforce Business conduct ESRS S2 ESRS 1 ESRS E2 Workers in the value General disclosures Pollution chain ESRS E3 ESRS S3 Water & marine Affected communi
Slide 36: Results – complete materiality matrix
Results – complete materiality matrix 1 2 3 4 5 5 Materiality matrix Material topics E4 E1 4 E1 – Climate Change & Energy G1 E4 – Land-use Change Financial Materiality S1 3 E5 – Resource Use E5 S1 – Own Workforce 2 G1 – Business Conduct 1 Impact Materiality 1 2 3 4 5
Slide 37: EU Taxonomy
EU Taxonomy a tool to help companies plan for their “green” transition and report on the same time Environmental objectives 1. Climate change mitigation 2. Climate change adaptation 3. Sustainable use and protection of water 4. Transition to a circular economy 5. Pollution prevention and control 6.
Slide 38: EU Taxonomy criteria
EU Taxonomy AND AND Make a substantial Do no significant harm contribution to at least one of to any of the other five Comply with the six environmental objectives environmental objectives minimum safeguards Comply with the applicable technical screening criteria
Slide 39: EPBD
CT ad MONTEA ‘This decarbniation timeline retireto aceries of am ot reducing or euninaing Decarbonisation Timeline EU has an installed capacty of ‘tleact 200GW af ‘5 the Pris Agreement’ goa to ini gota warring to ell bel 2 degrees Ces shove rend Levels. eisestion oftraneporation, ‘tonto, ard enhance
Slide 40: Zero-energy and zero-emission buildings in portfolio
17,5% 8% of our entire portfolio is of our entire portfolio is zero-energy building zero-emission building
Slide 41: Summary
Brownfields Transgenerational Energy strategy SUMMARY EU Green Deal Organisation aligned
Slide 42: Space for Sustainable Growth
Space for Sustainable Growth
Slide 43: Montea
MONTEA