Chalice Gold Mines Limited

Chalice Gold Mines — Investor Presentation (November 2009)

21 slides from Chalice Gold Mines's investor presentation, November 2009

  1. Slide 1: The New East African-focused Gold Company

    “The New East African‐focused Gold Company” Corporate Presentation November 2009 www.chalicegold.com

  2. Slide 2: Disclaimer

    Disclaimer ƒ The material used in this presentation is intended to be a summary of the proposed merger between Chalice Gold Mines Limited and Sub‐Sahara Resources NL and includes activities that are current and proposed based on the information available to Chalice Gold Mines Limited as at 14 Octobe

  3. Slide 3: CHN Overview

    CHN Overview ƒ Approx 137M shares on issue Board ƒ Market Cap of ~A$63M (based on Chalice share price of $0.46) Tim Goyder (Executive Chairman) Doug Jones (Managing Director) ƒ Focus on developing the high‐grade Zara Mike Griffiths (Executive Director) Gold Project j in Eritrea,, East Africa Anthony

  4. Slide 4: Gold in the Arabian-Nubian Shield

    Gold in the Arabian‐ Arabian‐Nubian Shield ƒ Emerging gold and base metal province – current gold endowment >20Mozs ƒ Numerous multi‐million oz gold deposits and mines dating back to ancient times ƒ Largely unexplored in modern times ƒ Centamin’s 13Moz Sukari Gold Mine in E t commenced Egypt d produ

  5. Slide 5: Zara Project - Location

    Zara Project - Location ct vo v ° “ ot o - oc Sudan _ ae a ° ! Zara Project # é “ \ Koka Discovery. est f j 4 / ERITREA ° t Keren { @fgrodat Adi Nets : i fos nia Deir, DOR e ; Baha Dcorey / Discovery ® Asmara > Dees Dscorery __ @Adi Keylan aad Sa Ethiopia

  6. Slide 6: Eritrea Overview

    Eritrea Overview ƒ Stable operating and social environment ƒ Proactive Government stance on mining developments – “open for business business” ƒ Modern Mining Code ƒ Increasingg foreign g exploration p & miningg investment – 13 ggroups p now active in country 6

  7. Slide 7: Scoping Study Overview

    Scoping Study Overview ƒ Scoping Study finds Koka deposit at the Zara Project in Eritrea has the potential to be financially robust based on a gold price of US$800 an ounce ƒ Koka forecast to produce an average of 110,000 ounces a year at a cash cost of US$424 an ounce ƒ TTotal t l production d ti o

  8. Slide 8: Scoping Study Key Parameters

    Scoping Study Key Parameters Parameter Average gold production ~110,000 oz per annum Life of mine ~ 6 years Total capital costs US$97 8 million US$97.8 Total cash costs US$424 per oz Total gold mined 712,000 oz Gold recoveries 95% Gold ld produced d d 677,000 oz Plant capacity 500,000 tpa Mining cos

  9. Slide 9: Zara Project – Regional Setting

    Zara Project – Regional Setting ƒ Major regional structural corridor controls gold occurrences ƒ Granted tenements cover 50km strike on this corridor id (~600k (~600km²) ²) ƒ Numerous prospects identified from artisanal gold workings ƒ Koka Deposit has been main focus of exploration to date 9

  10. Slide 10: Koka Gold Deposit

    Koka Gold Deposit ƒ Koka Deposit ‐ JORC compliant resource of 5 Mt at 5.8 5 8 g/t gold for 944,000 944 000 oz ƒ Based on results from 109 diamond drill holes ((~18,000m , drilled)) ƒ 600m strike length, 20‐30m wide and open at depth ƒ Only drilled to 250m below surface ƒ Bulk lk off resource shallow

  11. Slide 11: Koka Gold Deposit – looking north

    Koka Gold Deposit – looking north Exploration Camp Drill access 11

  12. Slide 12: Koka Gold Deposit – mineralisation

    Koka Gold Deposit – mineralisation Galena Vi ibl G Visible Gold ld Pyrite ƒ Quartz stockwork veins cutting microgranite; similar in style to Sukari gold mineralisation ƒ Visible gold & high gold values associated with sulphides in quartz veins – very little oxide ƒ Sulphides overall less than 2% ‐ n

  13. Slide 13: Koka Gold Deposit – metallurgy

    Koka Gold Deposit – metallurgy ƒ Metallurgical testwork being undertaken at AMMTEC Perth laboratory ƒ 7 specifically drilled diamond core holes representative of deposit ƒ Master composite prepared from 104 intervals ƒ Initial testwork indicates ore is metallurgically benign ¾ ~60% of gold recoverab

  14. Slide 14: Koka Gold Deposit – 3D model

    Koka Gold Deposit – 3D model 14

  15. Slide 15: Koka Gold Deposit – cross sections

    Koka Gold Deposit – cross sections 15

  16. Slide 16: Koka Exploration – 'near mine'

    Koka Exploration – ‘near mine’ ƒ Exploration to date focused on Koka Main Zone – very little drilling outside this target ƒ Other targets identified include: Koka Main ¾ Koka East – artisanal Koka Zone workings on high‐grade high grade East quartz vein Koka South ¾ Koka South Extension – IP Ext. res

  17. Slide 17: Koka South Extension

    Koka South Extension ƒ Strong IP resistivity anomaly identified 500m to the south of Koka ƒ Ground follow‐up confirmed zone of silica‐sericite altered microgranite ƒ Drilling confirmed Koka‐style alteration and mineralization ƒ Potential ‘blind’ system open down plunge to south >30ppb >10ppb >5ppb ƒ

  18. Slide 18: Zara Project – regional potential

    Zara Project – regional potential ƒ No exploration in district before 1998 when Koka discovered ƒ Koka geological setting extends throughout ~600km2 tenement block ƒ Numerous prospects identified from artisanal gold workings ƒ Drainage BLEG geochemical anomalies identified – will be followed up ƒ In

  19. Slide 19: Forward Program

    Forward Program ƒ Lycopodium to complete Feasibility Study by May 2010 ¾ 5,000m of diamond drilling to upgrade resource underway ¾ Hydrological drilling –initial holes indicate adequate water supply ¾ Metallurgical testwork almost complate ¾ Socio‐economic studies & EIS ongoing ƒ 2500m of exploratio

  20. Slide 20: Summary

    Summary ƒ Focused growth strategy via development of high high‐grade grade Koka Gold Deposit ƒ Targeting near‐term production of ~110,000 ozpa from current ~1Moz resource ƒ Expected completion of Feasibility Study in May 2010 ƒ Strategic ground position in highly gold endowed, under‐explored Arabian

  21. Slide 21: Competent Persons Statement

    Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Dr Doug Jones, a full‐time employee and Director of Chalice Gold Mines Limited, who is a Member of the Australasian Institute of Mining and Metallurgy and is a Chartered

Chalice Gold Mines — Investor Presentation (November 2009) on 6ix