Zanaga Iron Ore Co. Ltd. · LSE:ZIOC

Zanaga Iron Ore — Non-Deal Roadshow (April 2011)

20 slides from Zanaga Iron Ore's roadshow presentation, April 2011

  1. Slide 1: Investor Presentation Roadshow

    Investor Presentation Roadshow November 2010 Presentation April 2011

  2. Slide 2: Disclaimer

    Disclaimer IMPORTANT NOTICE This document, which is personal to the recipient, has been issued by Zanaga Iron Ore Company Limited (the “Company”). This document does not constitute or form part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for

  3. Slide 3: Investment Highlights

    Investment Highlights  JORC resource of 4.0bn tonnes at 33.9% Fe • Significant upside along strike and at depth  Planned production of 45 mtpa of high grade product  Strategic & funding partnership with Xstrata  Project fully funded to completion of FS  ZIOC has complete flexibility in funding

  4. Slide 4: Zanaga Project History: Work programmes

    Zanaga Project History Work programmes Combined PFS/Value Feasibility Study Initial Order of Magnitude Engineering Exercise 24 month Exploration Study PFS completion completion target 2007/8 2009 2010 2011 Q1 2014 US$21mm spent US$106mm spent Est. >US$200mm spend Corporate Milestones May : Exclusive

  5. Slide 5: Key developments since the IPO

    Key developments since the IPO Xstrata exercised option to acquire 50% + 1 share in Jumelles Limited, which owns the Project, in Feb 2011 • Zanaga Project now funded to completion of Feasibility Study • Partnership with major mining company focussed on building an iron ore division • ZIOC has compl

  6. Slide 6: Strategic partnership with Xstrata - what does it mean?

    Strategic partnership with Xstrata - what does it mean? • Xstrata owns 50% + 1 share in the Zanaga Project • Xstrata has management control of the Zanaga Project • Xstrata has a contractual obligation to deliver a Feasibility Study to international best practice standards and Xstrata internal guidel

  7. Slide 7: Zanaga JORC resource upgrade

    Zanaga JORC resource upgrade Resource Table • Expansion of resource to 4.0bnt Tonnes Fe SiO2 P Al2O3 Mn LOI 47km Classification (Mt) (%) (%) (%) (%) (%) (%) • Grade improvement to 33.9% Fe Measured - - - - - - - >10km not drilled (north) Indicated 1,720 36.3 41.4 0.046 2.70 0.10 1.20 • Drilling to 2

  8. Slide 8: Value Engineering Exercise and PFS

    Value Engineering Exercise and PFS • Value Engineering Exercise including Scope and Options Review commenced • Multi discipline expert team assembled covering all elements of the project scope • Initial workshops generated and prioritised specific ideas and opportunities with strong potential to imp

  9. Slide 9: ZIOC Strategy

    ZIOC Strategy • Focus on maximising value of the Zanaga Project • Formal rights under the JV Agreement • Board representation/Technical Committee representation • Appointment of in-house engineering expertise • Assess post-FS funding opportunities • Ensure long term maximisation of value for Zanaga

  10. Slide 10: Xstrata has the one off right to acquire ZIOC's stake at NPV

    Xstrata has the one off right to acquire ZIOC’s stake in the Zanaga Project at NPV on completion of the FS • Valuation criteria : • 10% real discount rate • Pricing based on index forward curve and/or average of CRU and AME prices • FS assumptions • CRU/AME prices are currently significantly higher

  11. Slide 11: Long-term fundamentals for iron ore prices look positive

    Long-term fundamentals for iron ore prices look positive AME/CRU average real long-term Current global cost curve for iron prices (FOB) v current consensus ore fines for delivery into China Usc/dmtu (US$pertonneCIFChina) 300 Australian FOB spot prices 160 250 120 200 US$65/t plus Brazil Freight 80 A

  12. Slide 12: Investment Highlights

    Investment Highlights  JORC resource of 4.0bn tonnes at 33.9% Fe • Significant upside along strike and at depth  Planned production of 45 mtpa of high grade product  Strategic & funding partnership with Xstrata  Project fully funded to completion of FS  ZIOC has complete flexibility in funding

  13. Slide 13: Corporate overview

    Corporate overview Top 10 Shareholders  Listing : London Stock Exchange AIM market Fund Manager % O/S Shares (m) 1 Directors 72.5% 204.4 2 BlackRock 8.3% 23.3  Ticker : ZIOC LN 3 F&C Asset Management 5.5% 15.5 4 TT International 3.3% 9.3 5 Company Related Holdings 2.0% 5.57  Market Cap : GBP 423m

  14. Slide 14: Appendix

    Appendix

  15. Slide 15: Republic of Congo Overview

    Republic of Congo Overview • Congo (Brazzaville), NOT TO be confused with Democratic Republic of Congo - Population of c.4m with low density (12 people/km2) • Rated equivalent security and political risk to Mozambique 1 • Politically stable since end of civil war in 1999 - President Denis Sassou-Ngu

  16. Slide 16: Zanaga Project Overview

    Zanaga Project Overview 9.7km 47km 5.4km 25 Km Zanaga 5.7km Itabirite Mafic amphibolites Base Location Zanaga orebody footprint Drill zones   Zanaga MPD CAMP Comilog Mn Railway Railway Zanaga Heavy Haul Railway 1930's Narrow Access Jetty Gauge Railway Brazzaville Channel Loading Platform M ay om b

  17. Slide 17: Board of Directors

    Board of Directors Colin Harris Clifford Elphick Director Non-Executive Chairman •Former Project Director for the Zanaga Iron Ore Project • Founder & CEO of Gem Diamonds •Former Project Director for Rio Tinto’s Simandou iron ore project • Managing Director of E Oppenheimer and Son for 14 years, for

  18. Slide 18: Gallery

    Gallery Surface evidence of iron content 7 drill rigs operating 24 hrs a day Removal of core sample Drill rig at work on Mount Lebayi Core sample Logistics base in Pointe Noire 17

  19. Slide 19: Gallery

    Gallery Sample analysis Dedicated on-site clinic Administering polio vaccinations Environmental team School improvement programme School improvement programme 18

  20. Slide 20: Contact

    Contact :Presentation Investor Andrew 2010 November Trahar Corporate Development and Investor Relations Manager Zanaga Iron Ore Company Limited +442073991105 www.zanagairon.com

Zanaga Iron Ore Company — Non-Deal Roadshow (April 2011) on 6ix