  1. Slide 1: Mt Thirsty Cobalt Project AGM Presentation

    www.mtthirstycobalt.com For personal use only MT THIRSTY COBALT PROJECT AGM Presentation By Guy Le Page, Director Conico Ltd (ASX: CNJ) November 2018

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only Certain statements made during or in connection with this communication, including, without limitation, those concerning the economic outlook for the exploration industry, expectations regarding commodity prices, production, cash costs and other operating results, gr

  3. Slide 3: Mt Thirsty Cobalt Project

    MT THIRSTY COBALT PROJECT www.mtthirstycobalt.com For personal use only The Mt Thirsty Cobalt Project is a 50:50 JV between Barra Resources Ltd and Conico Ltd (ASX:CNJ). Located 20km NW of Norseman, WA. The Project contains the Mt Thirsty Cobalt- Nickel (Co-Ni) Oxide Deposit that has the potential t

  4. Slide 4: Scoping study commodity price assumptions

    Mt Thirsty Cobalt Project – www.mtthirstycobalt.com Scoping study used commodity prices (2017 Real) of: For personal use only  Cobalt US$62,000/t ($28.1/lb) escalating at 1.5% p.a Nickel US$12,240/t ($5.6/lb) escalating at 2.5% p.a. Currency A$: US$0.74  Macquarie recently increased Cobalt price f

  5. Slide 5: Scoping Study Flowsheet

    Mt Thirsty Cobalt Project – www.mtthirstycobalt.com Scoping Study Flowsheet For personal use only The key to commercialisation of Mt Thirsty is the atmospheric pressure, low temperature leach processing route, using sulphur dioxide as the active reagent Overall metal recovery from ROM ore to MSP wit

  6. Slide 6: Strong Market Fundamentals due to Government Mandated Vehicle Electrification

    Strong Market Fundamentals due to Government Mandated move to Vehicle Electrification www.mtthirstycobalt.com “We are going to introduce electric vehicles in a very For personal use only big way. We are going to make electric vehicles self- sufficient like UJALA. The idea is that by 2030, not a sing

  7. Slide 7: Strong Market Fundamentals

    Strong Market Fundamentals www.mtthirstycobalt.com For personal use only  Demand for cobalt driven by:  Supply of cobalt:  Surge in Lithium-ion battery usage – renewable  Primarily a by-product of nickel and copper mining energy  Dominated by Democratic Republic of Congo (DRC) –  Electronics,

  8. Slide 8: Cobalt demand and supply outlook

    Mt Thirsty Cobalt Project www.mtthirstycobalt.com For personal use only  Demand for cobalt looks strong  Supply under pressure due to nickel mine closures and DRC volatility  Battery manufacturers are looking to reduce cobalt use, with the most likely substitute being nickel  Mt Thirsty’s produc

  9. Slide 9: PFS progress: metallurgical test work

    Mt Thirsty Cobalt Project - PFS www.mtthirstycobalt.com For personal use only  PFS level metallurgical test work results of the Whole Ore Leach case by Wood independently validated the Scoping Study assumptions.  Beneficiation test work successfully concentrated target asbolane mineral into one ha

  10. Slide 10: PFS: tenements, access and surveys

    Mt Thirsty Cobalt Project - PFS www.mtthirstycobalt.com For personal use only  New mining tenements pegged for the mine, associated infrastructure and groundwater drilling.  Access negotiations commenced with underlying land holders and traditional owners.  Biological surveys completed over plann

  11. Slide 11: The Next Steps

    Mt Thirsty Cobalt Project www.mtthirstycobalt.com For personal use only The Next Steps  Update JORC 2004 Resource to JORC 2012  Drilling for ground water  Complete PFS  Seek a joint venture partner to fund further studies (such as feasibility study) with a view to fast-tracking Project developme

  12. Slide 12: Proposed Project Timeline

    www.mtthirstycobalt.com Mt Thirsty Cobalt Project For personal use only Proposed Project Timeline Early CY 2020 Late CY 2019 Early CY 2019 Construction Permitting/ Complete-Plant Decision to Commissioning Feasibility Mine October 2017 Study Pre Feasibility Study Scoping Study

  13. Slide 13: Contact

    CONTACT Conico Ltd For personal use only Phone: (+61 8) 9282 5889 Facsimile: (+61 8) 9282 5866 Email: mailroom@conico.com.au Website: www.conico.com.au

Conico — Shareholder Meeting (November 2018) on 6ix