    TSX:TLO / OTC:TLOFF TALONMETALS.COM CORPORATE PRESENTATION April 2026

  2. Slide 2: Conditions of Presentation, Technical Reference, and QPs

    Conditions of Presentation, Technical Reference, and QPs This presentation has been prepared by Talon Metals Corp. (together with its affiliates, “Talon” Please see the technical report entitled “November 2022 National Instrument 43-101 Technical or the “Company”) and is being delivered for informat

  3. Slide 3: Forward-Looking Information

    Forward-Looking Information This presentation contains certain “forward-looking statements”. All statements, other Factors that could cause actual results or events to differ materially from current than statements of historical fact that address activities, events or developments that expectations

  4. Slide 4: Vision

    An operating U.S. nickel-copper company Vision with an integrated growth pipeline. Two U.S. Nickel Mines Operating Platform Two U.S. Processing • Eagle Mine & Humboldt Mill (Michigan): The only U.S. nickel mine - an established underground mine Facilities and processing facility. • Proven team deliv

  5. Slide 5: Operations: Eagle Mine & Humboldt Mill

    Operations Eagle Mine & Humboldt Mill

  6. Slide 6: Eagle Mine

    Eagle Mine Michigan’s Upper Peninsula, USA Eagle Mine Mine Type Underground Operations Since 2014 Employees ~425 Domestic Production Nickel, Copper, Cobalt, PGMs 6

  7. Slide 7: Humboldt Mill

    Humboldt Mill Michigan’s Upper Peninsula, USA Humboldt Mill Processing method Conventional flotation Products Nickel & copper concentrates Mill throughput 2,000 tpd Tailings management Subaqueous 7

  8. Slide 8: Eagle Mine Current Focus

    Eagle Mine Current Focus Eagle Safe & Stable Operations Deliver consistent production with safety-first discipline, strong operating controls, and reliable mill performance. Upper Keel Maximize Cashflows Maintain operating continuity and cashflow while progressing the next Michigan mine opportunity.

  9. Slide 9: Projects: Tamarack & BMPF

    Projects Tamarack & BMPF

  10. Slide 10: Tamarack Project

    Tamarack Project Minnesota, USA Overview • High-grade nickel & copper project currently in the Minnesota environmental review process, with a feasibility study nearing completion. ​ • Drilling continues at pace on the Vault Zone . • Joint venture with Rio Tinto: 51% Talon owned with an earn-in right

  11. Slide 11: Tamarack Resource

    Tamarack Resource Minnesota, USA Mineral Resource Million lbs of Ni In Situ Million lbs of NiEq In Situ (1) Tonnes (000’s) Ni (%) Cu (%) Co (%) Pt (g/t) Pd (g/t) Au (g/t) NiEq (%) (in the ground) (in the ground) Classification Total Indicated 8,564 1.73 0.92 0.05 0.34 0.21 0.17 2.34 326 441 Total In

  12. Slide 12: Tamarack Permitting

    Tamarack Permitting Minnesota, USA Current Stage EIS scoping underway. The Minnesota Department of Natural Resources is preparing scoping materials to define the issues and analyses for the EIS. Next milestone • July 2026: Anticipated release of the Scoping EAW and Draft Scoping Decision Document fo

  13. Slide 13: Responsive Mine Design: Progress Permitting

    Responsive Mine Design: Progress Permitting Results from the Environmental Review Process *Water storage is • 3 years of engagement with regulators and participating retained solely as an operational Tribal sovereign governments. contingency and is not precipitation- • 1,632 stakeholder comments add

  14. Slide 14: “Mine in a Box”

    “Mine in a Box” Conceptual layout as submitted in the Environmental Assessment Worksheet 14

  15. Slide 15: Comparison: Big Box Store vs. Conceptual Surface Layout

    Comparison: Big Box Store vs. Conceptual Surface Layout As Submitted in Environmental Assessment Worksheet BIG BOX STORE The above is a conceptual surface layout as submitted to the regulatory authorities in connection with the environmental review process in the State of Minnesota. The Tamarack Nic

  16. Slide 16: Beulah Minerals Processing Facility (BMPF)

    Beulah Minerals Processing Facility (BMPF) North Dakota, USA Rail Connectivity Located in North Dakota, the planned facility is designed to receive Tamarack ore by rail and produce nickel and copper concentrates, creating a domestic processing step in the overall U.S. supply chain. Location Located

  17. Slide 17: Growth & Exploration

    “Se maces Growth & Exploration

  18. Slide 18: Exploration Success

    Exploration Success Built to Find & Delineate High-Grade Nickel Our Advantage • In-house rigs + in-house drillers + in-house geophysics = Cohesive team producing fast and cost-effective drilling. • Generating follow up targets from drillholes in hours instead of weeks. • Follow up holes can be teste

  19. Slide 19: The Vault Zone

    The Vault Zone Latest Discovery Below Current Resource Vault Zone Our Focus 28.88% NiEq, 57.76% CuEq • Midcontinent Rift prospectivity with multiple target areas. (14.86% Ni, 15.37% Cu, 0.11% Co, 9.18 g/t Au, 16.31 g/t Pt, 8.65 g/t • Advancing targets in parallel to drive discovery pace. Pd, and 42.

  20. Slide 20: The Vault Zone: Cross-Section Looking West

    The Vault Zone Cross-Section Looking West • Cross-section highlights a vertically stacked mineralized system in the Vault Zone. • New Vault Zone mineralization has been identified near the 610 level. • The Stringer Zone shows continuity between upper and deeper intercepts. • Mixed and massive sulphi

  21. Slide 21: The Vault Zone: 710 meter level

    The Vault Zone: 710 meter level Step-Out Drilling from Drill Hole 16TK0250 At the 700m depth level, drilling now has 4 intercepts at a drill spacing of ~15 to ~40 meters. • Discovery drill hole 16TK0250 with 8.25 meters grading 23.28% NiEq (48.87% CuEq) starting at 707.77 meters. Photo of drill core

  22. Slide 22: The Vault Zone: 778 meter Level

    The Vault Zone: 778 meter Level Step-Out Drilling from Drill Hole 25TK0563 • Discovery drill hole 25TK0563 intercepted a combined 34.9 meters of Massive Sulphide Unit (“MSU”) mineralization grading 28.88% NiEq and 57.76% CuEq starting at 762.34 meters. • Step out drilling ~10 meters to the east, ~15

  23. Slide 23: The Vault Zone: Drainage Model

    The Vault Zone Drainage Model • Emerging model for the Vault Zone, in which massive sulphides accumulated in multiple repeating stacks developed along the contact between the intrusion and the surrounding sediments. • At this boundary, heat from the intrusion partially melted the country rock, creat

  24. Slide 24: Exploration Upside

    Exploration Upside Large MT Anomaly (1.5km from Surface) Tamarack Resource Area Geophysical Anomalies & Mineralization • MT (geophysical) anomaly sits directly underneath the Tamarack Resource Area. Raptor Zone plane • Off-hole BHEM (geophysical) anomaly identified at the same location suggesting th

  25. Slide 25: Exploration Upside

    Exploration Upside Reprocessed MT Data (L492300E) • The Vault Zone shows a dramatically different emplacement orientation striking E-W instead of the standard south dipping nature of the Tamarack Intrusive Complex. • All previous MT data have been modeled with E-W lines to be orthogonal to the Tamar

  26. Slide 26: Exploration Upside

    Exploration Upside New Raptor MT Anomaly • Located approx. 1km east of the Tamarack Resource Area. • Elongated MT anomaly that appears to be the down dip extension of the Raptor Zone (Head). Cross-Section looking West • Target is at approx. 1,000 meters depth. CGO • Strike length of approx. 1,500 me

  27. Slide 27: Tamarack Intrusive Complex

    Tamarack Intrusive Complex Prospects for Growth Raptor Zone: Crest (Formerly 264 Zone) • Tamarack has multiple areas Hole 18TK0264 intersected 0.25m where high-grade nickel- grading 9.95% Ni, 5.74% Cu, starting copper mineralization has at 539m (3km away from resource) 1KM been intersected historica

  28. Slide 28: Michigan Exploration

    Michigan Exploration Upper Peninsula, Michigan, USA Land Package • 400,000+ acre land package Talon is earning into. • Strategically located adjacent to Eagle Mine and the Humboldt Mill. Boulderdash Discovery & Results • Boulderdash is located 8 miles northwest of Eagle Mine. • First Hole (24BD0001)

  29. Slide 29: Michigan Exploration

    Michigan Exploration Highly Prospective Targets Historic Intercepts BIC & Little BIC • 1 hole has BHEM geophysics. • 1.16 meters @ 7.4% Ni, 5.6% Cu, and 13.97g/t Pt+Pd+Au from 519.5m. • 2.8 meters @ 4.2% Ni, 1.7% Cu, 3.9g/t Pt+Pd from 33 meters. Roland • Mineralized boulders at surface, including ma

  30. Slide 30: Social Performance

    Social Performance Engaging with our communities

  31. Slide 31: Proven, Trusted Social License

    Proven, Trusted Social License Partnering with our communities We engage We lead We act We invest early and often with transparency on feedback locally • Regular, two-way communication with local • Clear, proactive updates on project status • Tamarack Project design evolved through • We prioritize l

  32. Slide 32: Funding America’s Next Nickel-Copper Mine

    Funding America’s Next Nickel-Copper Mine

  33. Slide 33: US Government Grant Funding

    US Government Grant Funding Federal government grants to support exploration, engineering & environmental studies Remaining Received Grant Amounts in USD millions Nature Amount expected to to date be received Exploration in Michigan and Minnesota; Department of War (DOW) $20.6m $5.6m $15.0m Feasibil

  34. Slide 34: Credible Backing, Strong Financial Position

    Credible Backing, Strong Financial Position Strong shareholder base and U.S. government funding support execution of Talon’s U.S. nickel strategy  Lundin Mining, the previous owner of the Eagle Mine and Humboldt Mill.  The Pallinghurst Group, a specialist battery metals investment fund.  Rio Tint

  35. Slide 35: Executive Team

    Executive Team

  36. Slide 36: Executive Team

    Executive Team Mike Kicis Vince Conte Brian Goldner President Chief Financial Officer Chief Exploration Officer Jessica Rob Beranek Matt Johnson Darby Stacey Sandstrom Vice President Vice President Projects & Corporate Affairs Chief Executive Officer Vice President Environmental Health, Safety, & Hu