  1. Slide 1: Strategic Transaction to Acquire Caribou Complex

    CSE : CCI PRESENTATION DECK NOVEMBER 2024 STRATEGIC TRANSACTION TO ACQUIRE CARIBOU COMPLEX POSITIONING FOR COPPER AND ZINC PRODUCTION I N B AT H U R S T, N E W B R U N S W I C K , C A N A D A www.canadiancopper.com

  2. Slide 2: Disclaimer

    DISCLAIMER Forward-Looking Information and Statements This presentation contains “forward-looking information” for purposes of applicable Canadian securities laws. Forward-looking The Caribou Mine historical mineral resource estimates were derived from the technical report titled “Technical Report o

  3. Slide 3: A Large Deposit + Process Facility = Combined Strategy

    12 NOVEMBER 2024 A L A R G E DE P O SI T + P R OCE SS FACI L I TY = COMBINED STRATEGY N 180 way High MURRAY BROOK DEPOSIT CARIBOU PLANT COMPLEX 0 km ~1 • 100% ownership; • Permitted mine and • Advanced milling complex; development • Name plate • +21Mt @ 1.42% CuEq; processing capacity is 98% M&I Res

  4. Slide 4: What Is the Combined Strategy Worth?

    12 NOVEMBER 2024 WHAT IS THE COMBINED STRATEGY WORTH? CCI Valuation Range MURRAY BROOK PROJECT COMBINED STRATEGY Using Developer P/NAV PEA RESULTS IN 2013* VALUATION? @$96M NPV $96M NPV Multiple* Implied $NPV? Marketcap @$96M NPV Capex Considered: New PEA, Different Plan: Process Plant: $104M Low (.

  5. Slide 5: Combining Assets to Create Near-Term Critical Metal Producer

    12 NOVEMBER 2024 COMBINING ASSETS TO CREATE NEAR-TERM CRITICAL METAL PRODUCER MURRAY BROOK DEPOSIT CARIBOU COMPLEX HIGHLIGHTS COMBINED OPERATION & COMPLIMENTARY NEEDS: Creates strong synergies. A process plant requiring feed, and a large deposit that requires a milling and flotation facility to prod

  6. Slide 6: Highlights – Combining Assets to Create Near-Term Base Metal Producer

    12 NOVEMBER 2024 H I G H L I G H T S – C O M B I N I N G A S S E T S TO C R E AT E N E A R -T E R M B A S E M E TA L P R O D U C E R MURRAY BROOK DEPOSIT: 100% owned, large open pit VMS mineral resource. 98% M&I category, 21Mt @ 1.49% CuEq, +$115/tonne NSR value. Preliminary metallurgical test work,

  7. Slide 7: Transaction Overview

    12 NOVEMBER 2024 T R A N S AC T I O N OV E RV I E W - • Operational 3,000 tpd sulphide processing complex connected to grid ASSETS UNDER power and water supply PURCHASE AGREMEENT • Caribou Complex includes one SAG mill, two ball mills, three ISA grinding circuits, load out facilities, and flotation

  8. Slide 8: Caribou Complex Overview

    12 NOVEMBER 2024 CARIBOU COMPLEX OVERVIEW PROCESSING FACILITY • Capacity: 3,000 tpd sulphide processing • Includes tone SAG mill, two ball mills, and three ISA grinding circuits • On-site laboratory facilities for real-time metallurgical testing and process optimization INFRASTRUCTURE & PERMITTING •

  9. Slide 9: Murray Brook Is Key to Caribou

    MURRAY BROOK IS KEY TO CARIBOU PREVIOUS OPERATION CANADIAN COPPER’S OPPORTUNITY MURRAY BROOK DEPOSIT – Only 10km away • Open pit resource with consistent mill feed tonnage • Large resource base with + 12-year visibility on production budget Ore availability, UG instability, ore delineation challenge

  10. Slide 10: Caribou Mine History: 1998 - 2024

    12 NOVEMBER 2024 CARIBOU MINE HISTORY: 1998 - 2024 2015 Trevali Mining Corporation invests in 2024 1997 2007 Caribou, includes new SAG mill and October 28, 2024 - Canadian copper flotation equipment purchases. Copper signs Term Sheet and Breakwater Resources Ltd. Blue Note Metals $100M into Forecast

  11. Slide 11: MOU with Pabineau First Nation

    12 NOVEMBER 2024 MOU WITH PABINEAU FIRST NATION October 8th, 2024: Canadian Copper signed a non-binding Memorandum of Understanding with Pabineau First Nation The MOU aims to foster Creates mutual benefits, Pabineau First Nation open communication and including job creation, provides local land coll

  12. Slide 12: Next Steps for Caribou

    12 NOVEMBER 2024 ACTIVITY SUMMARY 2024 2025 DELIVERABLES Q4 Q1 Q2 Q3 OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP NEXT WE ARE HERE STEPS FOR Metallurgical Test Program CARIBOU Environmental Constraints Analysis ACQUISITION Mine Design & Site Layout Process Plant Verification Independent Financial

  13. Slide 13: Ownership, Financing & Capitalization

    3% 5% 2% OWNERSHIP, FINANCING & CAPITALIZATION 12% 29% C A P I TA L S T R U C T U R E Share Price (C$) $0.15 Current S/O 90M Average Volume 150K Market Cap $13M Cash $.200M Retail Investors Warrants 11.8M1 Seed Investors Options 1.6M 49% CEO (avg. cost $0.085) Fully Diluted 91.6M Ocean Partners Nexa

  14. Slide 14: Management Team and Board of Directors

    CSE: CCI MANAGEMENT TEAM BOARD OF DIRECTORS SIMON QUICK | CEO & DIRECTOR ANDREW ELINESKY | DIRECTOR Mr. Quick has more than 14 years as a well-regarded mining As a finance professional, Mr. Elinesky brings over 20 years of experience as a CFO and leader, spanning the USA, Mexico, Argentina, and Cana

  15. Slide 15: Thank You

    THANK YOU Simon Quick Chief Executive Officer simon@canadiancopper.com 905.220.6661 15

  16. Slide 16: Murray Brook Deposit Defining Further Extensions

    MURRAY BROOK DEPOSIT DEFINING FURTHER EXTENSIONS MB2019-02 MB2018-03 MB2012-65 0.82%Cu over 34.0m 0.79%Cu, 2.95% Pb-Zn, 0.81%Cu, 2.20% Pb-Zn, 33 g/t Incl. 1.42%Cu, 0.15g/t 29 g/t Ag over 99.6m Ag, 0.55 g/t Au over 81.8m Au over 16.3m Incl. 3.04% over 19.0m Incl. 4.07% over 11.0m • 3000m drill progra

  17. Slide 17: Caribou Horizon Trend Consolidation

    CARIBOU HORIZON TREND CONSOLIDATION Canadian Copper Property is 18km Connects two Former Producing Operations Underexplored with +30 Years Historical Production 5 km from Highway #180 Caribou Mine 0 #18 Produced +700Mlbs of Zinc, Murray Brook West w ay h Project Hig Lead, and Silver km 18 • 2,790 he

  18. Slide 18: Appendix A: 2023 Mineral Resource

    APPENDIX A: 2023 MINERAL RESOURCE 1 1 US metal prices $4.00/lb Cu, $1.25/lb Zn, $0.95/lb Pb, and $23/oz Ag at $0.76 USD/CAD. 18 1 Process recoveries used were 80% Cu, 87% Zn, 75% Pb, and 90% Ag.