Evz Limited · ASX:EVZ

Evz — Shareholder Meeting (November 2012)

33 slides from Evz's shareholder meeting presentation, Nov 30, 2012

  1. Slide 1: EVZ Limited Annual General Meeting

    For personal use only EVZ LIMITED ANNUAL GENERAL MEETING 30 NOVEMBER 2012

  2. Slide 2: Disclaimer

    1 DISCLAIMER For personal use only This presentation has been prepared by EVZ Limited. The con- tent in this presentation is for information purposes only. The infor- mation contained in this presentation is not investment or finan- cial product advice and is not intended to be used as the basis for

  3. Slide 3: Chairman: Max Findlay

    2 MAX FINDLAY For personal use only CHAIRMAN ✾ FY12 a watershed period for EVZ ✾ Rationalisation included divestment of National Engineering ✾ Brockman - Danum merger completed ✾ Clean energy strategy created and progressed ✾ CEO appointment in September 2012 ✾ Raelene Murphy appointed as a Director

  4. Slide 4: Scott Farthing, Chief Executive Officer

    3 SCOTT FARTHING For personal use only CHIEF EXECUTIVE OFFICER CAREER BACKGROUND ✾! Joined EVZ as Chief Executive Officer on 24 Sept 2012 ✾ Scott’s career background includes more than 25 years in the engineering sector leading businesses in the building, energy and infrastructure sectors ✾ Most rec

  5. Slide 5: Safety

    For personal use only 4 SAFETY EVZ Limited through Brockman Engineering and TSF Engineering are focused on building a greater involvement in the mining, oil and gas sectors. An increased focus on health and safety stan- dards of our staff through the Safety for Life initiative will become more appar

  6. Slide 6: EVZ Safety Performance

    15 EVZ SAFETY PERFORMANCE 10 ✓ For personal use only 2012 LTIFR at 9.6 7 6 ✓ Industry average at 13.4** 5 4 ✓ Positive Incentive Scheme underway 0 2010 2011 2012 ** Safe Work Australia 2012 www.safeworkaustralia.gov.au Lost Time Injury EVZ LIMITED 6 6 6 6 4 4 4 4 2 2 2 2 0 0 0 0 2010 2011 2012 2010

  7. Slide 7: FY12 Summary

    5 FY12 SUMMARY For personal use only Year ending 30 June 2012 was a period of consolidation of EVZ Limited ✓ Interim CEO - Raelene Murphy ✓ Sale of National Engineering ✓ Integration of Brockman and Danum ✓ Improved financial governance ✓ Talent acquisition in TSF Engineering ✓ CEO recruitment searc

  8. Slide 8: FY13 Progress

    6 FY13 PROGRESS For personal use only Progress in FY13 has been in line with expectations and in concert with the new strategic direction of the group. ✓ CEO appointment completed ✓ Focus on improved earnings and de-leveraging ✓ Talent acquisition and succession planning underway ✓ Execution of the

  9. Slide 9: Group Businesses

    For personal use only 7 GROUP BUSINESSES Progress briefing on group businesses ✾ Brockman Engineering ✾ Syfon Systems ✾ TSF Engineering

  10. Slide 10: Brockman Engineering

    For personal use only Market conditions exhibit tough price competitiveness in addition to BROCKMAN ENGINEERING procurement process delays. ✓ Regional industry leader in large scale tanks and traceable piping ✓ Well established client base ✓ Growth opportunities in Western Australia ✓ FY13 YTD earni

  11. Slide 11: Current Projects: Brockman Engineering

    CURRENT PROJECTS For personal use only ✓ Shell Refinery Tank Maintenance Geelong, Vic, $8M pa ✓ Caltex Flow Upgrade Newport, Vic, $4M ✓ Yarra Valley Water Mt Ridley Tank, Vic, $4M ✓ Shell Newport Tank and Piping Upgrade, Vic, $4M BROCKMAN ENGINEERING 10

  12. Slide 12: Active Major Bids: Brockman Engineering

    ACTIVE MAJOR BIDS For personal use only ✓ Barwon Water Torquay Tank, Vic ✓ Anchortank Coode Island Terminal, Vic ✓ Alcoa Anglesea Power Shut Down, Vic ✓ Total weighted current prospective projects $4.5M ✓ Current work in hand $18.6M (25 weeks) BROCKMAN ENGINEERING 11

  13. Slide 13: Syfon Systems

    For personal use only Market conditions exhibit tough price competitiveness in addition to procurement process delays. SYFON SYSTEMS ✓ Industry leader in siphonic drainage ✓ Well established on eastern seaboard ✓ Growth opportunities in Asia and Western Australia ✓ FY13 YTD earnings in line with exp

  14. Slide 14: Current Projects: Syfon Systems

    CURRENT PROJECTS For personal use only ✓ Craigieburn Town Centre, Vic, $1M ✓ Melbourne Park West Precinct, Vic $1M ✓ Putra Stadium, KL Malaysia, $1M ✓ Mater Hospital, Qld, $0.6M SYFON SYSTEMS 13

  15. Slide 15: Active Major Bids: Syfon Systems

    ACTIVE MAJOR BIDS For personal use only ✓ Abu Dhabi Airport, UAE ✓ Studio City Casino, Macau ✓ 101 Mall, KL Malaysia ✓ Westfield Mt Gravatt, Qld ✓ Total weighted current Australian prospective projects $20M ✓ Total weighted current Asian prospective projects $4.6M ✓ Current work in hand $10M (29 wee

  16. Slide 16: TSF Engineering

    For personal use only TSF Engineering has 45 years experience in delivering turnkey power plant solutions TSF ENGINEERING in Australia ✓ Leader in gas fired power plant technology ✓ Leader in turnkey solutions for CoGeneration and TriGeneration ✓ Transition from turnkey solutions to DBOOM energy sol

  17. Slide 17: Current Projects: TSF Engineering

    CURRENT PROJECTS For personal use only ✓ Melbourne Airport TriGen, Vic, $18M ✓ LifeHouse Research Facility, NSW, $2M ✓ Next DC Data Centre, NSW, $2M TSF ENGINEERING 16

  18. Slide 18: Active Major Bids: TSF Engineering

    ACTIVE MAJOR BIDS For personal use only ✓ Global Switch Data Centre, Power Plant, NSW ✓ Yanimar Mine Power Plant, WA ✓ Baxter Healthcare Trigeneration, NSW ✓ Total weighted current prospective projects $14M ✓ Current work in hand $22M (59 weeks) TSF ENGINEERING 17

  19. Slide 19: Clean Energy Strategy

    For personal use only 8 CLEAN ENERGY STRATEGY ✓ Gas energy specialists ✓ Remote power plants ✓ CoGeneration (Power Generation + Waste Heat) ✓ TriGeneration (Power Generation + Waste Heat + Cooling)

  20. Slide 20: What Is Cogeneration?

    CLEAN ENERGY STRATEGY ELEC WHAT IS COGENERATION? GRID E << 1.0 For personal use only ELEC ENERGY POWER E = 0.45 GAS ENGINE GAS FUEL HEATING PROCESS E = 1.0 E = 0.40 CUSTOMER Greenhouse Gas Reduction of 70% 19

  21. Slide 21: What Is Trigeneration?

    CLEAN ENERGY STRATEGY ELEC WHAT IS TRIGENERATION? GRID E << 1.0 For personal use only ELEC ENERGY POWER E = 0.45 GAS ENGINE GAS FUEL HEATING E = 0.40 E = 1.0 ABSORP CHILLER PROCESS COOLING E = 0.45 CUSTOMER Greenhouse Gas Reduction of 70% 20

  22. Slide 22: Three Point Plan

    For personal use only THREE POINT PLAN 1.STRENGTHEN PROJECT PIPELINE Increased BD focus, stronger opening, middle and closing skills, new resources and talent 2. COMPLIMENTARY ACQUISITION PROGRAM Secure additional capability, industry sector expansion, geographic expansion 3. ASSET MODEL - DBOOM OFF

  23. Slide 23: Market Assessment

    MARKET ASSESSMENT ✓ Energy costs rising to significance For personal use only ✓ Electricity to gas price differential widening ✓ Greenhouse gas reduction targets ✓ Carbon tax regulatory changes ✓ Energy White Paper 2012 widely supports “distributed generation” ✓ Operating cost pressure, energy a fac

  24. Slide 24: Industry Sectors

    INDUSTRY SECTORS ✓ Built Environment: Healthcare, Commercial For personal use only ✓ Food Manufacturing ✓ Process Manufacturing ✓ Remote Mine Sites ✓ Civil Infrastructure: Airports ✓ Bio Gas and Landfill Gas Facilities 23

  25. Slide 25: Turnkey Projects

    TURNKEY PROJECTS ✓ Design, Build, Commission For personal use only ✓ Capacity 1MW - 30MW ✓ Integrated technical capability ✓ Ongoing maintenance flow on work ✗ Pricing competitiveness high 24

  26. Slide 26: Asset Model - DBOOM

    ASSET MODEL - DBOOM ✓ Design Build, Own, Operate, Maintain For personal use only ✓ Ownership life - 15 years ✓ Selected creditworthy clients ✓ No capital outlay energy cost reduction ✓ Conservative equity - debt ratios ✓ Stable income for concession period ✓ End to end service involvement 25

  27. Slide 27: Summary

    SUMMARY For personal use only ✓ Clean energy strategy underway ✓ Brockman and Syfon YTD good ✓ Cogeneration and trigeneration ✓ TSF Engineering YTD improving ✓ Increased BD focus in all sectors ✓ Market price competitiveness high ✓ Enquiry rate increasing in clean energy ✓ Talent acquisition plan un

  28. Slide 28: Major Project: Melbourne Airport TriGeneration

    For personal use only 9 MAJOR PROJECT Melbourne Airport TriGeneration

  29. Slide 29: Melbourne Airport Trigeneration Facility Project

    For personal use only MELBOURNE AIRPORT TRIGENERATION FACILITY PROJECT Melbourne Airport has embarked on a strategy to increase their energy security, reduce their peak demand and enhance their environmental credentials with a newly proposed 8MW natural gas fired purpose built on site power station.

  30. Slide 30: Plant Capacity

    PLANT CAPACITY Electricity Generation = 8.0MW Cooling Capacity = 6.0MW For personal use only Heating Capacity = 4.5MW Design to the highest quality standards with industry best equipment BROAD chillers and MWM reciprocating engines custom built in Germany. The plant will be designed to recover all o

  31. Slide 31: Cogeneration

    COGENERATION A plant configuration that simultaneously delivers a combination of heat and electrical en- For personal use only ergy. The plant comprises an engine fueled by gas that is either reciprocating or rotary tur- bine in nature Related Glossary Terms Drag related terms here Index Find Term

  32. Slide 32: DBOOM

    DBOOM Project structure where the provider (TSF Engineering) undertakes Design, Build, Owner- For personal use only ship, Operations and Maintenance of the plant. Related Glossary Terms Drag related terms here Index Find Term

  33. Slide 33: Trigeneration

    TRIGENERATION A plant configuration that simultaneously delivers a combination of cooling, heating and For personal use only electrical energy. The plant comprises an engine fueled by gas that is either reciprocating or rotary turbine in nature and an absorption chiller fueled by heat from the proce