Cartier Resources Inc. · TSXV:ECR

Cartier Resources — Fact Sheet (May 2018)

2 slides from Cartier Resources's fact sheet, May 2018

  1. Slide 1: Chimo Mine Project

    CHIMO MINE PROJECT RIGHT OF OWNERSHIP RESSOURCES CARTIER INC. HISTORICAL 2.4 MT @ 4.8 G/T AU - 379,012 OZ. 100% (“ CARTIER” OR “THE COMPANY”) PRODUCTION DATA SINCE THE OPENING OF THE MINE* (TSXV: ECR) SIZE OF THE PROPERTY MINING METHOD 334 HECTARES LOCATION: NEAR VAL-D’OR MINING DISTRICT ADVANCED EX

  2. Slide 2: Geology and Mineralization

    GEOLOGY AND MINERALIZATION • Gold ore, 14 zones mined by 3 producers • The mining infrastructure consists of a network of 19 galleries at depths ranging from 80 to 870 m linked by a shaft with 3 compartments and a depth of 920 m • The headframe and surface installations were dismantled in 2008 • No