Pure Gold Mining — Investor Presentation (August 2016)
25 slides from Pure Gold Mining's investor presentation, Aug 15, 2016
Slide 1: August 2016 PGM:TSX-V
August 2016 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on historical fact, including without limitation, statements regarding the Company’s expectations in respect
Slide 3: A Fresh Look at a Historic Producer
A FRESH LOOK AT A HISTORIC PRODUCER JURISDICTION Red Lake, Ontario, Canada – an established mining district with more than 28 million ounces of high grade gold produced to date (1) HIGH GRADE GOLD One of the highest grade undeveloped deposits in the world (2) with currently defined resources of 928,
Slide 4: Direct Red Lake Experience
DIRECT RED LAKE EXPERIENCE MANAGEMENT & TECHNICAL TEAM BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking, of Canaccord Genuity • Former Chief Geologist, Placer Dome’s Campbe
Slide 5: Capital Structure
CAPITAL STRUCTURE Capital Structure (as at August 15, 2016) Key Shareholders (2) Shares Outstanding 153.7 million Management & Directors 4.9% Options Outstanding 8.9 million Strategic Shareholders 21.2% Weighted average exercise price $0.27 AngloGold Ashanti 13.4% Warrants Outstanding* Evanachan Ltd
Slide 6: Red Lake Mining District: Highest Grade Gold Belt in Canada
Red Lake Mining District HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with 85 year history • 1.3 mozs of gold produced in the district at a grade of 19.5 g/t from 2013 to 2015 (2) • District continues to de
Slide 7: Madsen Gold Project: Focused on New Gold Discoveries
Madsen Gold Project FOCUSED ON NEW GOLD DISCOVERIES 3rd largest 2.5 million oz HISTORIC PRODUCTION (1) 9.9 g/t LAND PACKAGE IN RED LAKE AVERAGE HISTORIC GRADE (1) • Permitted mill and tailings management facility • 45 km2 contiguous, patented claims • Second largest historic producer in Red Lake, wi
Slide 8: +$200 Million of Infrastructure
Madsen Mine & Mill Infrastructure +$200 MILLION OF INFRASTRUCTURE Interior of Madsen mill Madsen mine complex, Russet South in background 1,275 metre deep shaft Permitted tailings facility & 27 levels of workings Madsen mill 7
Slide 9: Current Mineral Resource
Madsen Gold Project CURRENT MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Host Type Tonnes g/t Au oz/t oz Au Indicated Austin Unconformity 1,677,000 7.92 0.23 427,000 South Austin Unconformity 850,000 9.32 0.27 254,000 McVeigh Unconformity 374,000 9.59 0.28 115,000 8 Zone Ultramafi
Slide 10: Modern Science Driving Exploration
Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested • 10 kms of unconformity with +2.5mozs of historic production and 20 kms of prospective ultramafic contacts 9
Slide 11: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report on the Preliminary Economic As
Slide 12: Austin – McVeigh Fold Repetition
Madsen Mine Geology AUSTIN – MCVEIGH FOLD REPETITION McVeigh • Limited near-surface production with a maximum historic mining depth of 230 m – open for expansion • Open to depth – focus of expanded 2016 drill program Austin • Hanging wall horizon extensively mined from surface to a depth of 1,200 m
Slide 13: Targeting High Grade Gold Shoots at McVeigh
Madsen Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016, July 14, 2016 and August 9, 2016 for further details and disclosure (1) See the National Instrument 43-101 technical report entitled “Te
Slide 14: 2016 Exploration Program
Madsen Drill Program 2016 EXPLORATION PROGRAM • Accelerated and expanded 2016 exploration program announced June 2016 • $9.1 million expansion of 2016 program: Additional 30,000 metre diamond drill program focused on the McVeigh horizon Additional 5,000 metres of drilling at Russet South and sat
Slide 15: Multiple Exploration Targets Identified
Madsen Satellite Zones MULTIPLE EXPLORATION TARGETS IDENTIFIED 14
Slide 16: Russet South
Madsen Satellite Zones RUSSET SOUTH • High grade gold located ~1.5 km west of the McVeigh horizon and existing infrastructure • Folded repeat of the same stratigraphy that hosts the Madsen 8 Zone resource • Large mineralized system with multiple near surface, high grade gold zones discovered to date
Slide 17: Preliminary Economic Assessment
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Total gold production of ~260,000 ounces over 2016 PEA (1) a 6.5 year mine life at an average diluted head grade of 8.3 g/t gold (1) Pre-Tax / After-Tax IRR 74% / 62% • Positive preliminary economic assessment announced April 2016 Pre-Tax / After
Slide 18: 2016 PEA – Opportunities for Enhancement
Madsen Gold Project 2016 PEA – OPPORTUNITIES FOR ENHANCEMENT (1) PEA Provides a Base Case for Production Growth Expansion Potential within McVeigh • Mineral system open with current exploration targeting mineralization below current mining Greater Permitted Processing Capacity • Existing Environment
Slide 19: Pure Opportunity
PURE OPPORTUNITY Well understood deposit geology with a long mining history Large mineral system open for expansion New science has doubled the potential mineralized horizon +$200 million of infrastructure in-place at Madsen Attractive base case PEA with several opportunities for enhancement Acceler
Slide 20: Appendix
APPENDIX pureggld , 19
Slide 21: 2016 PEA – Additional Details
Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re
Slide 22: Benchmarking vs. Peers – Resource Grade
Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 M&I Resource Grade (g/t Au) 9.04 8.93 8.42 8.0 5.87 6.0 4.91 4.09 4.0 3.50 2.66 1.63 2.0 0.82 0.0 Dalradian Integra Pure Gold Osisko (1) Sabina Gold Auryn Eastmain Condor Gold ATAC Midas Gold Ascot Inferred R
Slide 23: Benchmarking vs. Peers – Market Cap & P/NAV
Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 1.00x 0.83x 0.80x 0.68x 0.66x 0.63x 0.63x 0.59x 0.56x 0.60x Price / NAV 0.51x 0.40x 0.20x 0.00x Integra Sabina Gold Eastmain Midas Gold Dalradian Pure Gold Osisko ATAC Market Capitalization $500 $401 $400 Market Cap (C$mm) $321
Slide 24: One of the World's Highest Grade Gold Projects
Madsen Gold Project ONE OF THE WORLD’S HIGHEST GRADE GOLD PROJECTS Select High Grade Gold Assets Hope Bay (TMAC) Back River (Sabina) Brucejack (VOK) Red Lake Madsen Cocheneur Brucejack (VOK) Jerusalem (Pretium) Fire Creek Zaruma Fire Creek & Midas Lamaque (Integra) (Klondex) Madsen Cocheneur & Red G
Slide 25: Corporate Inquiries: Darin Labrenz
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca
Pure Gold Mining — Investor Presentation (August 2016) on 6ix