Bonterra Resources, Inc. · TSXV:BTR
Bonterra Resources — Investor Presentation (March 2023)
41 slides from Bonterra Resources's investor presentation, March 2023

Slide 1: Developing Québec's Next Gold Camp
Developing Québec’s NEXT GOLD CAMP Exploration and Development in the Urban-Barry Camp March TSX-V BTR |2023 OTCQX BONXF | FSE 9BR2 1

Slide 2: Forward-Looking Statements
Forward-Looking Statements In this presentation, forward-looking information pertains to, among other things: the goals for 2023, current estimates and assumptions underlying the 2021 MRE and Barry open pit PEA, including that the Barry open pit PEA relates to the 2021 MRE; projected production; sen

Slide 3: Executive Summary
Executive Summary Over 3 Moz of total gold resources across all categories 1 Underexplored camp with over 10 M oz discovered to date 2 Only operational mill in the region Valuation Drivers are in Valuation Discount Catalysts Motion Unwarranted Updated mineral resource estimates Bonterra is tradi

Slide 4: CEO's Track Record
CEO’s Track Record ► Marc-Andre Pelletier joins with a strong track record as COO at Wesdome, where he led a team that increased production by ~110% driving a ~420% equity return from 2017 to 2021 Strong Returns to Shareholders Wesdome outperformed by ~420% from Wesdome GDXJ October 2017 to October

Slide 5: Location in the Abitibi Greenstone Belt
Location in the Abitibi Greenstone Belt ►Young and emerging camp, comparable to Val-d’Or 80 years ago BACHELOR PROPERTY 15,550 ha URBAN-BARRY PROPERTY 22,500 ha TSX-V BTR | OTCQX BONXF | FSE 9BR2 5

Slide 6: Strategic Land Position and Infrastructure
Strategic Land Position and Infrastructure ►Only operational mill in underexplored camp with over 10 M oz discovered to date 1 Bachelor Mill Complex BACHELOR PROPERTY 15,550 ha Bachelor-Moroy Project M&I 160 Koz Au @ 5.58 g/t Au* Inferred 104 Koz Au @ 5.31 g/t Au* * Combined MREs for Bachelor and Mo

Slide 7: Significant Existing Infrastructure
Significant Existing Infrastructure ► Fully operational 800 tpd mill on hydroelectric grid power being permitted for expansion to 1,800 tpd and an additional 8 million tonnes of tailings capacity ► Assay lab (~6,000 assays/month), three camps, two main roads and several core shacks Bachelor Mill Com

Slide 8: Timelines
Timelines 1 ► Two drill rigs turning at ~1,400 m/month to test regional targets, include at the Duke property ► Mill expansion permitting process underway with COMEX 2 with provincial permits thereafter – expected in H1 2023 Drilling/MREs Permitting/Economic Studies/Development Project 2022 2023 202

Slide 9: Timelines (cont.)
Timelines (cont.) 1 ► Ongoing technical review and exploration ramp permitting at Gladiator ► Technical/strategic review of Bachelor-Moroy complete – Placed on long-term care & maintenance Drilling/MREs Permitting/Economic Studies/Development Project 2022 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q

Slide 10: ESG Best Practices
ESG Best Practices ►Social and economic benefits made in a sustainable manner Economic Environmental Social Bonterra pays 44 employees and Taking every opportunity to reduce the Agreements in place with the CFNW and contractors with annual wages totaling environmental impact of our drilling an

Slide 11: Capital Structure
Capital Structure EV/oz of ~US$9 1 Strong shareholders Capital Structure C$ Wexford 19.9% Issued & Outstanding Shares 126.2M Agnico Eagle 7.3% Options 9.1M Fidelity 5.9% (Weighted average exercise price of C$1.38) Stephens Inv. Mgmt. Warrants None Fully Diluted Shares 135.3M Ruffer 4.6% (C$12M in pr

Slide 12: High Level Geology
HIGH LEVEL GEOLOGY TSX-V BTR | OTCQX BONXF | FSE 9BR2 12

Slide 13: Drill Rig Locations
Drill Rig Locations ►Two rigs drilling ~1,400 m/month focused on regional targets, including the Duke JV Legend Diamond Drill Location Duke JV (70% BTR / 30% OSK) Lac Barry JV (85% BTR / 15% GZZ) TSX-V BTR | OTCQX BONXF | FSE 9BR2 13

Slide 14: Regional Structures are Thought to be Key
Regional Structures are Thought to be Key ► Urban-Barry cross-regional corridors of structural decompression ► Regional structures are associated with deposits but also point to areas that need to be tested Panache Windfall Moss Quesnel Gladiator Barry TSX-V BTR | OTCQX BONXF | FSE 9BR2 14

Slide 15: Barry Project
BARRY PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 15

Slide 16: Barry Open Pit Overview
Barry Open Pit Overview Location Urban-Barry Camp, Quebec ESG Stage PEA Mineralization and waste rock is non-acid generating Type Open Pit (5.4:1 strip ratio) 35 new jobs created LOM Production Profile ~30 Koz per year @ AISC of US$1,065/oz Supported by local communities/stakeholders PEA Resou

Slide 17: PEA Highlights
PEA Highlights ► Barry open pit only PEA released, which outlines the fastest and cheapest potential production re-start $48.3 M* 43% 30 Koz 145.1 Koz After-tax NPV5% After-tax IRR Avg. Annual Gold LOM Gold US$1,600/oz Au Production Production (95% mill recovery) $22.1 M $21.3 M 2.0 Mt @ 5.4 : 1 Ini

Slide 18: Bachelor Mill Complex
Bachelor Mill Complex ► A key strategic asset for Bonterra ► Annual savings of ~$3 million by placing the Bachelor-Moroy underground infrastructure on long-term care and maintenance Bachelor Mill • Only operational mill in the region • 800 tpd capacity • Well maintained, low capex to re-start • Bein

Slide 19: Barry – Planview
Barry – Planview ►Plunging with ramp, pit shell and mined out areas Mineralized Zones D AB 800 H 1000 550 Mined out and Decline TSX-V BTR | OTCQX BONXF | FSE 9BR2 19

Slide 20: Barry – Section
Barry – Section ►Looking southwest Mineralized Zones D AB 800 H 1000 550 TSX-V BTR | OTCQX BONXF | FSE 9BR2 20

Slide 21: Barry – Long Section
Barry – Long Section ►Plunging with pit limits and mined out areas ►Resources: 675 m deep, potential for a multi million ounces Au deposit PEA pit limits • 675 m deep deposit • 2,040 ounces per vertical-meter Mineralized Zones D AB 800 H 1000 550 Pits TSX-V BTR | OTCQX BONXF | FSE 9BR2 21

Slide 22: Barry – Long Section
Barry – Long Section ►Recent infill and expansion drill results confirming grade and resource growth potential 22

Slide 23: Gladiator Project
GLADIATOR PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 23

Slide 24: Gladiator – Planview
Gladiator – Planview ►Topography, lake, shoreline and proposed exploration ramp and portal Portal Mineralized Zones MND MAIN NORTH SND SOUTH RIVAGE FW TSX-V BTR | OTCQX BONXF | FSE 9BR2 24

Slide 25: Gladiator – Section
Gladiator – Section ►Looking southwest Mineralized Zones MND MAIN NORTH SND SOUTH RIVAGE FW TSX-V BTR | OTCQX BONXF | FSE 9BR2 25

Slide 26: Gladiator – Long Section
Gladiator – Long Section ►Looking northeast Mineralized Zones MND MAIN NORTH SND SOUTH RIVAGE FW TSX-V BTR | OTCQX BONXF | FSE 9BR2 26

Slide 27: Gladiator – Resource Expansion
Gladiator – Resource Expansion TSX-V BTR | OTCQX BONXF | FSE 9BR2 27

Slide 28: Gladiator – Regional Targets
Gladiator – Regional Targets ►Airborne magnetics illustrate the potential of regional targets along strike ►Management plans on testing regional targets to follow up on historic results ►Other nodes of decompression within the corridor to be tested (similar to Gladiator) M&I 391,000 oz Au @ 8.61 g/t

Slide 29: Gladiator vs. Windfall Drilling Comparison
Gladiator vs. Windfall Drilling Comparison ► Drilling at Gladiator is only a fraction of what has been carried out at Windfall Bonterra Osisko Resources 1 Mining 2 Asset Gladiator Windfall Resource as of date Jun 2021 Aug 2022 Number of holes drilled* # 486 4,834 Drilling* metres 228,204 1,852,861 M

Slide 30: Bachelor-Moroy Project
BACHELOR-MOROY PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 30

Slide 31: Bachelor-Moroy – Long Section (Looking West)
Bachelor-Moroy – Long Section (Looking West) ► The decision has been made to place Bachelor-Moroy on long-term care and maintenance ► Selective drilling is planned at regional targets outside the resource area BACHELOR MINE MOROY PROJECT Recent Bulk Sample Mineralized Zones M1-Group M2 Group M4 M6 M

Slide 32: Bachelor-Moroy – MAG / TMI
Bachelor-Moroy – MAG / TMI ► Various regional target areas identified TSX-V BTR | OTCQX BONXF | FSE 9BR2 32

Slide 33: Bachelor-Moroy – Regional Targets
Bachelor-Moroy – Regional Targets ► Magnetic survey shows several regional targets that are expected to be followed up on ► Regional target proximity to the mill results in lower risk exploration strategy TSX-V BTR | OTCQX BONXF | FSE 9BR2 33

Slide 34: Presentation Summary
Presentation Summary CEO with a Successful Track Record of • Marc-Andre Pelletier was most recently the COO at Wesdome Gold Mines Ltd. where he was Building and Operating Gold Mines in the instrumental in the re-start of the Kiena Mine and contributed to the increase of production at the Abitibi Gre

Slide 35: Thank You!
Thank You! www.btrgold.com 35

Slide 36: Appendix – PEA Details
Appendix – PEA Details ►Past-producer status and existing infrastructure significantly reduces LOM OPEX and CAPEX LOM Details LOM CAPEX (C$ millions) Description Unit Value Capital Cost Description Initial Sustaining Total Total Tonnes Mined Mt 2.0 Tailings Management Area 2.4 18.1 20.5 Average Dilu

Slide 37: Appendix – PEA Sensitivity Analysis
Appendix – PEA Sensitivity Analysis ►Robust economics at US$1,600 gold (base case) with significant upside at current prices Description Unit Sensitivity to Gold Price Gold Price US$/oz $1,200 $1,300 $1,400 $1,500 $1,600 $1,700 $1,800 $1,900 $2,000 Pre-tax NPV5% C$M -4 12 27 42 57 72 88 103 118 Afte

Slide 38: Appendix – M&A Landscape
Appendix – M&A Landscape ►Not many high-grade single mine/project companies left in Canada ►Most have been acquired at premium valuations Source: Company reports and market data. Bonterra Claude Osisko Mining Wesdome Great Bear Pretium Battle North Barkerville Integra Gold Richmont Resources 1 Resou

Slide 39: Appendix – Management and Board
Appendix – Management and Board Marc-Andre Pelletier Cesar Gonzalez Pier-Elise Hebert-Tremblay President, CEO & Director Executive Chairman Chief Financial Officer Mr. Pelletier is a professional mining engineer with over 25 years of Mr. Gonzalez co-founded Sailfish Royalty Corp. and Ms. Hebert-Trem

Slide 40: Appendix – Mineral Resources
Appendix – Mineral Resources NI 43-101 Mineral Resource Estimate - June 2021 (see notes on last page) Tonnage Grade Contained Metal Category (000 t) (g/t Au) (000 oz Au) Gladiator Underground Measured - - - Indicated 1,413 8.61 391 Measured + Indicated 1,413 8.61 391 Inferred 4,174 7.37 989 Barry Op

Slide 41: Appendix – Mineral Resources Notes
Appendix – Mineral Resources Notes Model Parameters 1. CIM (2014) definitions were followed for Mineral Resources. 2. Bachelor and Moroy underground Mineral Resources are estimated at gold cut-off grades of 2.40 g/t or 3.0 g/t, domain dependent. Gladiator and Barry underground Mineral Resources are
Source: Internet Archive copy of btrgold.com
More decks from Bonterra Resources, Inc.
Investor Presentation (October 2026)35 slides · October 2026
Investor Presentation (October 2026)35 slides · October 2026
Investor Presentation (September 2026)32 slides · Sep 1, 2026
Investor Presentation (September 2026)32 slides · September 2026
Investor Presentation (July 2026)32 slides · July 2026
Investor Presentation (July 2026)32 slides · July 2026