  1. Slide 1: Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities

    Duralie Coal CCC Meeting Presentation – Company Report & Overview of Activities November 2021 Michael Plain Environment & Community Superintendent

  2. Slide 2: Table of Contents

    Table of Contents 1. Agenda Item 7a - Progress at the Mine 2. Agenda Item 7b - Environmental Reporting 3. Agenda Item 7c - Environmental Management Plans & Monitoring 4. Agenda Item 7d - Community Complaints 5. Agenda Item 7e - Community Programs 2 27 October 2021 2

  3. Slide 3: 1. Progress at the Mine

    1. Progress at the Mine Total Waste Total ROM Coal (BCM) (T) Q3 2021 322,000 45,000 Mining 3rd Quarter 2021  Mining operations continued at Duralie in the Weismantel pit. Mining Operations will cease on 31 December 2021.  Coal handling and railing is continuing and will cease on 31 December 2021.

  4. Slide 4: 2. Environmental Reporting & Regulators

    2. Environmental Reporting & Regulators Management Project Status Area Reporting • Duralie Coal Mine Annual Review • The Duralie Coal Mine 2021 Annual Review was completed and submitted in September 2021 2021. The AR was accepted by DPIE on 18 October 2021 and has now been distributed to the CCC mem

  5. Slide 5: 3. Environmental Management Plans & Monitoring

    3. Environmental Management Plans & Monitoring a) Air Quality Management b) Blast Management c) Noise Management d) Water Management e) Rehabilitation Management f) Biodiversity Management g) Mine Closure Planning 5 27 October 2021 5

  6. Slide 6: 3a. Air Quality Management

    3a. Air Quality Management Management Area Project Status Air quality monitoring • Real-time air quality system • The real-time air quality TEOM monitor on Martins Crossing Rd continues to operate. • HVAS & dust gauge • General ambient PM10 dust levels have been very low throughout monitoring networ

  7. Slide 7: 3a. Air Quality Management – Dust Gauge Monitoring

    3a. Air Quality Management Duralie Dust Gauge Monitoring - Annual Rolling Average 12 Months to September 2021 4.5 Dust (g/m2/month) 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 D3 D4 D5 D7 D8 D9 D10 D12 D13 DP&E limit Sep-20

  8. Slide 8: 3a. Air Quality Management – HVAS PM10 Monitoring

    3a. Air Quality Management Duralie HVAS Monitoring (PM10) 12 Months to September 2021 60 PM10 (µg/m3) 40 20 0 26-Sep-20 15-Nov-20 4-Jan-21 23-Feb-21 14-Apr-21 3-Jun-21 23-Jul-21 11-Sep-21 High Noon Twin Houses Hattam Edwards DP&E Limit Duralie HVAS Monitoring (PM10) Annual Rolling Average - 12 Month

  9. Slide 9: 3b. Blast Management

    3b. Blast Management Management Project Status Area Blasting • Blast monitoring • Blast activities at the DCM were completed on 09/09/2021. • No further blasting will be undertaken at Duralie Coal Mine, with the exception of any blasting required for rehabilitation work. Overpress Ground Ground Over

  10. Slide 10: 3c. Noise Management

    3c. Noise Management Management Project Status Area Noise • Routine Monitoring • Routine quarterly noise monitoring of operations has continued in 2021, to monitor Monitoring noise emissions from mining day works. • Quarterly monitoring continued during Q3 2021. All results were compliant with noise

  11. Slide 11: 3d. Water Management

    3d. Water Management Management Project Status Area Site Water • Annual water balance review. • The 2020 annual site water balance has been prepared. A summary has been included Management in the Annual Review 2020/21 and will be available on the Duralie Coal website. Surface Water • Routine monitor

  12. Slide 12: 3d. Water Management – Rainfall and Surface Water Monitoring

    3d. Water Management Duralie Mine Site - Monthly Rainfall Duralie Surface Water Monitoring - pH 10 3 months to September 2021 600 9 400 8 Rainfall (mm) 7 200 6 0 5 2021 03-Jul-21 13-Jul-21 23-Jul-21 02-Aug-21 12-Aug-21 22-Aug-21 01-Sep-21 11-Sep-21 21-Sep-21 JAN MAR MAY SW2 - DCPL (CSC) SW2 RC - Rai

  13. Slide 13: 3e. Rehabilitation Management

    3e. Rehabilitation Management Management Area Project Status Rehabilitated Waste • Rehabilitation Works • 17.3 hectares of bulk shaping, topsoiling and seeding has been completed in October emplacements 2021 to achieve final landform designs. • Rehabilitation Planning • The next stages of rehabilita

  14. Slide 14: 3f. Biodiversity Management

    3f. Biodiversity Management Management Project Status Area Biodiversity • Revegetation works • 2021 Revegetation planting has been completed. Approximately 36,100 native tubestock over Offset 114 hectares on the eastern side of Johnsons Creek Road have been planted during H1 2021 in the biodiversity

  15. Slide 15: 3f. Biodiversity Management

    3f. Biodiversity Management Management Project Status Area Flora/Fauna • Nest Box Program • An additional 28 nestbox were installed in the established Duralie native rehabilitation area during May 2021. Reporting will be included in the Annual Review 2021 • Quarterly Nest box monitoring was undertak

  16. Slide 16: 3g. Mine Closure Planning

    3g. Mine Closure Planning Management Project Status Area Mine Closure • Closure timing • Condition 5, Schedule 2 of Project Approval (08_0203) authorises mining operations to be carried at the DCM Planning until 31 December 2021. General • Accordingly, DCPL is planning for the commencement of the mi

  17. Slide 17: 3g. Mine Closure Planning

    3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 13 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2020/21. Management Project Status Area Stakeholder and • Stakeholder

  18. Slide 18: 3g. Mine Closure Planning

    3g. Mine Closure Planning Note: *Refer to Duralie Mining Operations Plan & Rehabilitation Management Plan Table 13 Mine Closure Planning Schedule. *Further detail on mine closure planning progress is included in the Annual Review 2019/20. Management Project Status Area Coal Shaft Creek • CSC • Re-co

  19. Slide 19: 4. Community Complaints

    4. Community Complaints Duralie Complaint Summary Period: 01/06/2021 - 30/9/2021 Period: 3 Months Total No. of Complaints: 0 (0 noise, 0 blast, 0 air quality, 0 other) Total No. of Complainants: 0 Date/Time of Method of Nature of Complaint Complainant Location Complaint Complaint Investigation/Outco

  20. Slide 20: 5. Community Programs

    5. Community Programs Management Area Project Status Support Programs Stratford Coal • The Stratford Coal Community Support Program is running again in 2022. Applications will be Community Support open until 30 November 2021. Program • Applications forms are available on the Duralie Coal website. St