Cadiz, Inc. · NASDAQ:CDZI

Cadiz — B. Riley FBR Conference (May 2018)

15 slides from Cadiz's conference presentation, May 23, 2018

  1. Slide 1: Cadiz Inc. Corporate Presentation

    Cadiz Inc. Corporate Presentation B. Riley FBR - May 23, 2018

  2. Slide 2: Safe Harbor Agreement

    Safe Harbor Agreement May 2018 During the course of this presentation, we will make forward-looking statements. Any statement that is not a historical fact is a forward-looking statement. Forward-looking statements refer to expectations, projections or other characterizations of future events or cir

  3. Slide 3: Cadiz Valley

    Cadiz Valley ✸ 1,300 square-mile watershed in Mojave Desert. ✸ Aquifer system with > 20 million AF ~ Lake Mead. ✸ Cadiz Inc. owns 35,000 contiguous acres at base of watershed. ✸ Prolific opportunity to conserve groundwater for overlying agricultural and also regional 3 municipal use.

  4. Slide 4: 25 Year History of Agricultural Use

    25 Year History of Agricultural Use  Cadiz owns 35,000 acres in Cadiz Valley w/ Ag approved land use on all properties.  Similar climate and crop mix as Imperial, Palo Verde and Coachella Valleys.  In 1993, County permitted ag development on 9,600 acres, including water rights to irrigate entire

  5. Slide 5: Problem: Loss of Water at Dry Lakes

    Problem: Loss of Water at Dry Lakes ✸ Cadiz/Fenner Watershed terminates at dry lakes where groundwater is lost to the atmosphere by evaporation. Bristol Dry Lake Crust Beneath Dry Lake Surface ✸ Groundwater beneath dry lake surface is highly saline (10 times the salinity of Pacific Ocean) 5

  6. Slide 6: Solution: Conservation & Recovery

    Solution: Conservation & Recovery  State of the art groundwater conservation plan will save 50,000 AFY before it can evaporate.  Apply the water to overlying ag land or treat to ambient quality in the CRA and export for municipal use. 6

  7. Slide 7: Cadiz Water Project

    Cadiz Water Project Innovative and Sustainable Water Source for Southern California Phase 1  Expand existing wellfield on Cadiz property to capture groundwater.  Make available 2.5 MAF conserved over 50 years = water for 400,000 people a year.  No environmental impacts.  County authorization of

  8. Slide 8: Phase 1&2 Connect CA's Major Water Transportation Routes

    Phase 1&2 Connect CA’s Major Water Transportation Routes 8

  9. Slide 9: Facilities, Costs & Construction

    Facilities, Costs & Construction o Phase 1 build-out ~$250M, creates & supports 3,100 jobs.  Well field and power facilities  Treatment facilities  43-mile conveyance & related RR improvements  Aqueduct intertie  Monitoring facilities o Phase 2 (cost $TBD), creates and supports 2,900 jobs.  Re

  10. Slide 10: Project Development

    Project Development 10

  11. Slide 11: Recent Milestones

    Recent Milestones ☀ Cadiz supported by national coalition of community groups, business and labor. ☀ Congressional leadership removes Feinstein rider requiring unique to Cadiz BLM review. ☀ US BLM rescinds errant 2015 evaluation, finding: ☀ project furthers railroad purposes ☀ project within scope o

  12. Slide 12: Next Steps

    Next Steps  Participant Contracts ☀ Participating agencies execute contracts  Metropolitan Water District transportation ☀ Treat to ambient water quality in CRA. ☀ Space available. Wat Code. §1810 ☀ Off-setting benefits; water softening ☀ Intake / Off-Take  Construction Permitting & Planning ☀ En

  13. Slide 13: Phase II

    Phase II  Cadiz Water Project Phase II ☀ What is it? – proposal to import and store surplus water on the Colorado River or CA State systems underground at Cadiz. Return stored water in future dry years. Capacity = 1 Million AF. ☀ Who participates? – State and CR contractors with excess supplies in

  14. Slide 14: Timeline

    Timeline 201 201 202 202 8 9 0 1 Contract negotiations Metropolitan WD application Engineering & Planning Final Construction Permits Phase 2 Permitting Phase 1 Construction Phase 2 Construction 14 (Estimated)

  15. Slide 15: Financials

    Financials (As of 3/31/18) Shares Outstanding 23.2 M Working Capital $8.6 M Debt – Sr. Secured * $63.2 M Debt – Convertible ** $70.5 M Lease buy-back Provision *** $14 M * Senior Secured Mortgage - 8% Interest (6% PIK and 2% cash quarterly), Maturity in May 2021 or “Springing Maturity Date” 91 days

Cadiz — B. Riley FBR Conference (May 2018) on 6ix