Atalaya Mining Copper Sa · LSE:ATYM

Atalaya Mining Copper Sa — Atalaya Mining — Technical Presentation (June 2024)

57 slides from Atalaya Mining Copper Sa's technical presentation, Jun 19, 2024

  1. Slide 1: European copper producer with operations in Spain

    European copper producer with operations in Spain Site Visit Presentation 19 June 2024

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (“Presentation”) has been prepared by Atalaya Mining Plc (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers

  3. Slide 3: Disclaimer: Technical Disclosure

    Disclaimer: Technical Disclosure Technical Disclosure – Proyecto Riotinto Unless otherwise noted, all scientific and technical information relating to Proyecto Riotinto is based on and derived from a Competent Persons Report (CPR) entitled “An Independent Competent Persons Report on the Mineral Asse

  4. Slide 4: Regional Context

    ATALAYA MINING > Regional Context

  5. Slide 5: Iberian Pyrite Belt

    Iberian Pyrite Belt World class minerals district Riotinto Masa Valverde 5

  6. Slide 6: Riotinto District

    Riotinto District World class regional infrastructure 6

  7. Slide 7: Regional Infrastructure

    Regional Infrastructure Access to the critical inputs required for modern and sustainable operations $/t Copper Production Villages Fresh water reservoirs Current TSF Transmission line Planned future TSF Fresh water NOT REQUIRED: reservoir • Labour camps • Fly-in fly-out Villages • Desalination • Pi

  8. Slide 8: Regional Infrastructure Advantages

    Regional Infrastructure Advantages Other Mining Regions Riotinto District ▪ Increasing scarcity of water necessitates the ▪ TSF is the main source of process water development of expensive solutions: ▪ Fresh water supplied by three reservoirs ‒ Desalination: Escondida, Los Pelambres, Water QB2, Code

  9. Slide 9: Revisiting the 2023 Riotinto PEA

    Revisiting the 2023 Riotinto PEA

  10. Slide 10: 2023 Riotinto PEA

    2023 Riotinto PEA Contemplates an integrated mine plan that leverages Riotinto’s 15 Mtpa plant Cerro Colorado San Antonio Open pit: 156.6 Mt Underground: 11.8 Mt Riotinto Processing Plant (M&I) 0.37% Cu (Inferred) 1.32% Cu, 1.79% Zn Capacity: >15 Mtpa San Dionisio Open pit: 56.1 Mt (M&I) 0.91% Cu, 1

  11. Slide 11: Riotinto Deposits

    Riotinto Deposits PEA contemplates that the adjacent deposits are mined concurrently Long Section San Dionisio Cerro Colorado San Antonio CuSW Mineralised material PolyMS CuSW PolyMS Open pit Mining method Underground Open pit Underground Legend Copper grade 0.00 – 0.139% 0.14 – 0.199% 0.20 – 0.499%

  12. Slide 12: 2023 Riotinto PEA: Mining & Processing

    2023 Riotinto PEA: Mining & Processing Mine plan prioritises higher grade material from San Dionisio and San Antonio Mining Schedule by Mineralised Material Source (Mt) Processing Schedule by Mineralised Material Type and Grade 12

  13. Slide 13: 2023 Riotinto PEA: Production & NPV

    2023 Riotinto PEA: Production & NPV Demonstrates the potential for strong economics and production growth Production Profile(1)(2) NPV After-Tax ($m) Sensitivity to Copper Price ($/lb) and Discount Rate (3) Copper Price ($/lb) 2.80 2.98 3.15 3.33 3.50 3.68 3.85 4.03 4.20 0% 928 1,240 1,545 1,848 2,1

  14. Slide 14: Key Milestones and Progress

    ATALAYA MINING > Key Milestones and Progress

  15. Slide 15: Key Regulatory Approval: AAU

    Key Regulatory Approval: AAU AAU facilitates the development of regional deposits in the Riotinto District Overview AAU ▪ In April 2023, Atalaya was granted a substantial modification to the existing Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) for Pr

  16. Slide 16: Approval: Road Relocation

    Approval: Road Relocation Highway relocation allows for Cerro Colorado and San Dionisio pit expansions ▪ Highlight ▪ Diagram of design? New path of Highway A-461 Existing San Dionisio highway Cerro Colorado 16

  17. Slide 17: San Dionisio: Initial Approval

    San Dionisio: Initial Approval Allows for waste stripping to prepare the area for future mining phases San Dionisio Cerro Colorado 17

  18. Slide 18: San Dionisio: Waste Stripping

    San Dionisio: Waste Stripping Good progress so far in 2024, paving the way for access to higher grade material June 2024 Copper Resource Grade (M&I) 18

  19. Slide 19: San Dionisio: Future Phases

    San Dionisio: Future Phases Mining of both CuSW and PolyMS material via O/P and U/G mining phases Ore Type Copper Grades A A’ A A’ 19

  20. Slide 20: San Antonio Deposit

    San Antonio Deposit Preparations are underway to begin a new drilling programme Plan View Copper Grades Cerro Colorado Zinc Grades Likely ramp portal location 20

  21. Slide 21: Broader Riotinto District

    ATALAYA MINING > Broader Riotinto District

  22. Slide 22: Potential Future Processing Hub

    Potential Future Processing Hub ATYM’s 15 Mtpa mill could become a processing hub – similar to MATSA model Key Operations in the Iberian Pyrite Belt Magdalena Aguas Teñidas Cerro Colorado San Dionisio San Antonio Riotinto East MATSA (Sandfire) Sotiel 29 km Riotinto District Masa Valverde / Majadales

  23. Slide 23: Proyecto Masa Valverde Location

    Proyecto Masa Valverde Location Strategically located <30 km from Riotinto’s 15 Mtpa plant and infrastructure 29 km 23

  24. Slide 24: PMV: Resource Estimate

    PMV: Resource Estimate One of the largest undeveloped VMS deposits in the world 2022 Mineral Resource Estimate(1)(2) ▪ Mineral Resource Estimate Grade for PMV was announced in Tonnage Mt CuEq Cu Zn Pb Ag g/t Au g/t April 2022 Masa Valverde: Indicated 16.9 1.51% 0.66% 1.55% 0.65% 27 0.55 ‒ Prepared b

  25. Slide 25: Masa Valverde Deposit

    Masa Valverde Deposit Current drilling with two rigs targeting extensions of Cu-only grades >1% Stockwork: Copper Zone Massive Sulphide: Copper Zone 25

  26. Slide 26: Regulatory Approval

    Regulatory Approval Granting of key permits highlights that Andalucía is a world-class mining jurisdiction Overview AAU, Exploitation and Water Permits ▪ In March 2023, Atalaya was granted the Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) by the Junta

  27. Slide 27: PMV: Access Ramp

    PMV: Access Ramp Access ramp construction is expected to begin by the end of 2024 Wireframes of Mineralised Zones Planned Ramp Access for MV and MJ 27

  28. Slide 28: PMV: Campanario Trend

    PMV: Campanario Trend Potential to be the first shallow, open pittable resource at PMV Polymetallic Sulphide Mineralization Wireframe ▪ 85 holes totalling ~18km completed ▪ Resource definition drilling almost complete ‒ Expect to announce a maiden resource in Q4 2024 ▪ Mineralisation is open to the

  29. Slide 29: Proyecto Riotinto East

    Proyecto Riotinto East Covering the east extensions of two world class VMS belts: AT-MM and SD-CC-SA Main Geophysical and Geochemical Targets ▪ SkyTEM and Airborne Gravity Gradiometric surveys completed ▪ Several high priority coincident geophysical and geochemical anomalies pending for drill testin

  30. Slide 30: E-LIX Phase I Plant

    ATALAYA MINING > E-LIX Phase | Plant

  31. Slide 31: E-LIX Phase I Plant

    E-LIX Phase I Plant Commissioning in progress; expected to unlock significant value June 2024 Illustrative Recoveries 31

  32. Slide 32: E-LIX Phase I Plant

    E-LIX Phase I Plant Capable of producing high purity copper and zinc at mine site January 2024 32

  33. Slide 33: E-LIX: Initial Operating Strategy

    E-LIX: Initial Operating Strategy Recovery of zinc from existing saleable copper concentrate Conventional Flotation Only E-LIX Application #1 Ore type(1) CuSW CuSW 85% Cu 85% Cu Recovery 60% Zn Unchanged: 60% Zn No modifications are required at 100 kt existing 100 kt processing plant Illustrative Co

  34. Slide 34: E-LIX: Initial Operating Strategy

    E-LIX: Initial Operating Strategy Commissioning and ramp-up progress Recovered zinc precipitate “Cleaned” copperJanuary 2024 concentrate 34

  35. Slide 35: E-LIX: Future Operating Strategy

    E-LIX: Future Operating Strategy Potential to apply E-LIX to complex ores throughout the IPB and beyond Conventional Flotation Only E-LIX Application #2 Ore type(1) PolyMS PolyMS Higher recoveries 80% Cu Facilitates Recovery 60% Cu 75% Zn by producing a conversion of bulk concentrate 85% Zn Resource

  36. Slide 36: Proyecto Touro

    ATALAYA MINING > Proyecto Touro

  37. Slide 37: Proyecto Touro Location

    Proyecto Touro Location World class infrastructure 37

  38. Slide 38: Proyecto Touro

    Proyecto Touro Past producing mine and currently operating as an aggregate quarry 38

  39. Slide 39: Proyecto Touro

    Proyecto Touro Water treatment plant is addressing legacy water runoff issues 39

  40. Slide 40: Proyecto Touro

    Proyecto Touro Ongoing river restoration August 2021 – Lañas River May 2023 – Lañas River 40

  41. Slide 41: Proyecto Touro

    Proyecto Touro Increasing support from the local communities 41

  42. Slide 42: Strategic Industrial Project Status

    Strategic Industrial Project Status Awarding of strategic status would be seen as strong validation for Touro Overview Legislation Objectives ▪ In Galicia, a project can be awarded the status of ▪ To attract and promote new national and strategic industrial project (or proxectos international invest

  43. Slide 43: Conclusion

    ATALAYA MINING > Conclusion

  44. Slide 44: Illustrative Production Potential

    Illustrative Production Potential Growth driven by higher grades at Riotinto and potential Touro development Copper Equivalent Production (kt)(1)(2) 1. Recovered metal in concentrate. 2. Copper Equivalent production is calculated from results presented in the PEA and based on $3.50/lb Cu, $1.20/lb Z

  45. Slide 45: AISC Benchmarking

    AISC Benchmarking ATYM cost positioning is competitive vs. notable copper producer peers Reported AISC (US$/lb) Source: Company filings Note: Peers that do not disclose AISC include Central Asia Metals, Ero Copper, Sandfire and Taseko 45

  46. Slide 46: Copper Market Outlook

    Copper Market Outlook Near-term and long-term supply challenges support robust outlook for copper Copper Price (US$/lb) Copper Demand Drivers ▪ Steady annual demand growth of 2.5 – 3.0% ‒ Equivalent to the production of a top 5 global mine ▪ Visible copper inventories are at multi-year lows ▪ Accele

  47. Slide 47: Attractive Valuation

    Attractive Valuation “Average" tonne of copper production is worth about US$55,000 per BofA BofA: EV (US$ 000s) / t Production vs. EV / EBITDA 2025E  Growth pipeline  Low capex intensity  Safe jurisdiction  Net cash position  Dividend policy Source: BofA Global Research estimates 47

  48. Slide 48: Move to LSE Main Market

    Move to LSE Main Market Admission to Premium listing segment marks major milestone for Atalaya Admission: 29 April 2024 48

  49. Slide 49: Appendix

    ATALAYA MINING > Appendix

  50. Slide 50: Atalaya Snapshot

    Atalaya Snapshot European copper producer with operations in Spain . Ticker Operations Asset locations ATYM Riotinto District TOURO LSE Main Market 15 Mtpa processing plant Premium Segment SPAIN Cerro Colorado mine MADRID San Dionisio deposit San Antonio deposit OSSA MORENA Capitalisation Proyecto M

  51. Slide 51: 50 MW Solar Plant

    50 MW Solar Plant Expected to lower Atalaya’s carbon footprint and deliver cost savings June 2024 Electricity Sources 51

  52. Slide 52: Electricity Prices in Spain

    Electricity Prices in Spain Market electricity prices have returned to long-run historical averages Spot Market + Adjustment in Spanish System (€/MWh)(1)(2) 1. Source: OMI, Polo Español S.A. (OMIE), day-ahead operations program 2. Since 15-Jun-2022, includes daily adjustment mechanism related to leg

  53. Slide 53: Q1 2024 Production Results

    Q1 2024 Production Results Lower production due to lower grades and recoveries Copper production Ore Throughput (Mt) 10,666 tonnes Cu 12,139 tonnes Cu | Q1 2023 Throughput & recoveries 3.7 Mt ore processed 0.34% Cu ore grade Copper Recovery 3.7 Mt | Q1 2023 0.38% | Q1 2023 84.74% Cu recovery 86.88%

  54. Slide 54: Q1 2024 Financial Results

    Q1 2024 Financial Results Lower operating costs party offset lower copper revenues Income statement highlights Revenues (€m) Revenue: €69.9m Op. costs: €(59.7)m €91.2m | Q1 2023 €(66.8)m | Q1 2023 EBITDA: €10.3m Profits: €1.6m €24.4m | Q1 2023 €11.1m | Q1 2023 Cash flow statement highlights EBITDA (

  55. Slide 55: Cash Costs & AISC Breakdown

    Cash Costs & AISC Breakdown Q1 2024 unit costs were within guidance range for FY2024 $/lb Copper Payable Q1 2024 Q1 2023 FY2023 FY2022 ▪ Cash costs and AISC in Q1 2024 Mining 0.99 0.83 0.86 0.79 were within the Processing 0.91 0.97 0.89 1.31 FY2024 guidance range Other site operating costs 0.67 0.52

  56. Slide 56: Reserves and Resources

    Reserves and Resources Attributable Grade Contained Metal Contained Metal Asset Ownership Tonnage Cu Zn Pb Au Ag Cu Zn Pb Au Ag CuEq Cu CuEq Notes Mt g/t g/t Mt Mt Mt Moz Moz Mt Mt Mt Cerro Colorado 100% Reserves 132.0 0.37% - - - - 0.5 - - - - 0.5 0.5 0.5 M&I 156.6 0.37% 0.15% 0.03% - - 0.6 0.2 0.0

  57. Slide 57: Atalaya Mining plc

    Contacts: Atalaya Mining plc Alberto Lavandeira, CEO +34 959 59 28 50 info@atalayamining.com

Atalaya Mining — Technical Presentation (June 2024) on 6ix