  1. Slide 1: Minerals for a Sustainable Future: Q4 2024 Interim Presentation

    MINERALS FOR A SUSTAINABLE FUTURE Q4 2024 Interim presentation February 11th, 2025

  2. Slide 2: Contents and Disclaimer

    CONTENTS •DISCLAIMER Introduction 4 By Ivar Fossum This document has been used by Nordic Mining during an oral • Engebø Rutile and Garnet 10 presentation. Therefore, this document is incomplete without the Byexplanations, oral Kenneth Nakken Angedal and supporting instruments that comments were subm

  3. Slide 3: Agenda

    1. Introduction 2. Engebø Rutile and Garnet 3. Kvinnherad Quartz 4. Financial update Q4-2024 5. Q & A

  4. Slide 4: Highlights

    Highlights • No Lost Time Injuries (LTI) in the 4th quarter Safety & • Engebø construction completed without LTIs ESG • Overall safety management transferred to NM • First mineral concentrate produced in Q4 Production • Adjustment of process and operations learning ongoing Ramp-up • First shipment t

  5. Slide 5: Health and safety in focus

    Health and safety in focus • Engebø construction phase completed to date without lost time injuries reported by the EPCs. • Minor incident 7th January in relation to testing of drying machines in the Engebø dry plant. No injuries and limited equipment damage due to the incident, which was restricted

  6. Slide 6: Introduction

    1. Introduction 2. Engebø Rutile and Garnet 3. Kvinnherad Quartz 4. Financial update Q4-2024 5. Q & A 6

  7. Slide 7: 7

    7

  8. Slide 8: Construction phase completed

    Construction phase completed • The main construction activities at Engebø were completed during the fourth quarter. Only minor balance of plant items remains to be complete. • Remaining activities have no impact to the ramp-up. • A small project team will focus on verification of as-built drawings a

  9. Slide 9: 9

    9

  10. Slide 10: 10

    10

  11. Slide 11: 11

    11

  12. Slide 12: ty NORDIC : ,

    ty NORDIC : , mininc 2

  13. Slide 13: Mining operations supporting process plant ramp-up

    Mining operations supporting process plant ramp-up Mining activities are ramped up • Mining activities with all primary machinery at site and staff onboarded. • Waste rock deposit in operation according to permit. • Ore feed to plant according to requirement from process plant ramp-up. Process plant

  14. Slide 14: Production to ramp-up during 2025

    Production to ramp-up during 2025 Mineral production volumes Targeting annual production rate end of 2025 235 kt • Production is ramping up over the next quarters. • Focus on maintaining quality of the mineral concentrates. 35 kt • Updated ramp-up plans defers revenue streams compared Q1 Q2 Q3 Q4 20

  15. Slide 15: Cautious market outlook for 2025

    Cautious market outlook for 2025 Ti metal • The demand for aircraft worldwide is strong and is growing resulting in steady demand for titanium sponge. • Titanium sponge producers are reporting production levels at full capacity. TiO2 Pigment • Declining pigment market in Q4 o conflicts in Ukraine an

  16. Slide 16: Rutile prices start to recover in 2025

    Rutile prices start to recover in 2025 Rutile: • As from Q3 2023, rutile prices have been weakening due to the weakness in the pigment segment. • Rutile prices seem to have stabilized and are expected to strengthen in 2025, driven by the improved market conditions in the pigment and metal sectors. •

  17. Slide 17: Kvinnherad Quartz

    1. Introduction 2. Engebø Rutile and Garnet 3. Kvinnherad Quartz 4. Financial update Q4-2024 5. Q & A 17

  18. Slide 18: Promising results from preliminary test work

    Promising results from preliminary test work Transport of equipment Drilling & Blasting Loading for transport Processing - Washing Melting test – Clear quartz sample • Fieldwork successfully completed in November extracting 10 tons of ore for processing test work, which includes analysis of quality

  19. Slide 19: Financial update Q4-2024

    1. Introduction 2. Engebø Rutile and Garnet 3. Kvinnherad quartz 4. Financial update Q4-2024 5. Q & A 19

  20. Slide 20: Entering 2025 with solid cash position

    Entering 2025 with solid cash position Cash flow in the quarter (mNOK) • NOK 142 million from investing activity and NOK 35 million interest payment on USD 100 million bond. 700 • Positive operating activity due to reimbursement of VAT in the quarter. 22 600 599 • Cash effect on foreign exchange on

  21. Slide 21: Financial results impacted by currency fluctuation

    Financial results impacted by currency fluctuation Group Cash level Profit flow in and Loss(mNOK) the quarter (mNOK) • Loss on foreign exchange related to the bond and the royalty liability of NOK 135 million. • Other foreign exchange gain related to bank Q4 2024 Q3 2024 FY 2024 FY 2023 accounts of

  22. Slide 22: Q&A

    1. Introduction 2. Engebø Rutile and Garnet 3. Kvinnherad quartz 4. Financial update Q4-2024 5. Q & A 22

  23. Slide 23: Highlights and Q&A

    No Lost Time Injuries (LTI) in the 4th quarter Engebg@ construction completed without LTIs Overall safety management transferred to NM wu Production First mineral concentrate produced in Q4 ===] R Adjustment of process and operations learning ongoing amp-up First shipment targeted for Q1 2025 a Fi —

  24. Slide 24: Consolidated statement of financial position

    Appendix Consolidated statement of financial position NOK million Q4 2024 Q3 2024 2023 • Engebø construction works of NOK 139 million capitalized on balance sheet in Q4 2024, down from NOK 278 million in Q3 2024. Mine under construction 2 654 2 516 1 377 Property, plant and equipment 97 80 3 Right-o