Cerro De Pasco Resources, Inc. · TSXV:CDPR

Cerro De Pasco Resources — Conference Presentation (June 2025)

19 slides from Cerro De Pasco Resources's conference presentation, June 2025

  1. Slide 1: Positioned to Unlock the Value of the World's Largest Above-Ground Metal Resource

    Positioned to Unlock the Value of the World’s Largest Above-Ground Metal Resource

  2. Slide 2: Forward-Looking Statements

    01 FORWARD-LOOKING STATEMENTS Certain statements contained in this presentation constitute “forward update or revise any forward-looking statement, whether as a result of economic viability, but do have reasonable prospects for economic looking information” or “forward-looking statements” under Cana

  3. Slide 3: El Metalurgista Concession & Social License

    02 EL METALURGISTA CONCESSION & SOCIAL LICENSE One of the Largest Above-Ground Metal Resources In the World TSXV: CDPR OTC: GPPRF FRA: N8HP 3

  4. Slide 4: El Metalurgista Concession & Social License

    02 EL METALURGISTA CONCESSION & SOCIAL LICENSE One of the Largest Above-Ground Metal Resources In the World Excelsior Mineral Pile PROCESSING PLANTS 18K TPD permitted Not owned by CDPR Quiulacocha Tailings TSXV: CDPR OTC: GPPRF FRA: N8HP 4

  5. Slide 5: Quiulacocha Tailings

    03 QUIULACOCHA TAILINGS Historical Estimate AVERAGE HEAD GRADE AND RECOVERY Tonnes Mining Period (000s) Cu Pb Zn Ag Au Copper Era (1906-1965) 16,369 4.0% – – 200 g/t 3.0 g/t Gold Polymetallic Era (1952-1992) 58,299 – 3.3% 8.6% 98 g/t – 12% Average Recovery – 60% 60% 75% 60% 60% Silver ESTIMATED AVER

  6. Slide 6: Historic Easement

    04 HISTORIC EASEMENT Land Easement Secured In May 2024, Cerro de Pasco Resources received a Supreme Resolution granting access to the El Metalurgista Concession for a 40-hole drilling campaign. Formalities Completed On May 29, 2024, Cerro de Pasco Resources finalized necessary steps— including a pay

  7. Slide 7: Quiulacocha Tailings / Phase 1 Drilling

    05 QUIULACOCHA TAILINGS / PHASE 1 DRILLING Sonic Drill, provides continuous, high-quality samples with minimal disturbance and no water usage, reducing environmental impact, enhancing resource recovery, and improving data quality. TSXV: CDPR OTC: GPPRF FRA: N8HP 7

  8. Slide 8: Quiulacocha Tailings / Phase 1 Drilling

    05 QUIULACOCHA TAILINGS / PHASE 1 DRILLING Freezer truck on-site to preserve micro- structural integrity and prevent oxidation. TSXV: CDPR OTC: GPPRF FRA: N8HP 8

  9. Slide 9: Quiulacocha Tailings / Phase 1 Assay Results

    06 QUIULACOCHA TAILINGS / PHASE 1 ASSAY RESULTS Recent Drilling 40 out of 40 drillholes assayed. Average Grade per Metal Metal Avg. Grade Ag 1.66 oz/t Zn 1.47% Pb 0.89% 4.3 oz/t AgEq* 5.5 oz/t Cu 0.09% AgEq* Reported Drillholes Au 0.10 g/t Ag-Zn-Pb Tailings Ga 53.2 g/t Ag-Cu-Au Tailings In 19.9 g/t

  10. Slide 10: Why Gallium - Highlights

    07 WHY GALLIUM - HIGHLIGHTS A Critical Metal Powering Technology & the Energy Transition The U.S. is 100% reliant on foreign gallium imports. In 2023, China banned gallium exports, posing a serious risk to national security and U.S. economic resilience. Discovery of the largest above-ground gallium

  11. Slide 11: U.S. Department of Defense & Gallium

    08 U.S. DEPARTMENT OF DEFENSE & GALLIUM The Pentagon, which has reserves of germanium but not gallium, plans to use its authority under the Defense Production Act for “prioritizing awards” by Dec.31, “focusing on recovery of gallium from existing waste streams or other products,” spokesman Jeff Jurg

  12. Slide 12: Quiulacocha TSF: Potential Economics Based on Internal Projections

    09 QUIULACOCHA TSF Potential Economics Based on Internal Projections Metal Grade Price Value/Tonne Ag 1.86 oz/t $30 $56 Zn 1.15% $3,000 $34 Base Case Scenario 10k Tonnes/Day Pb 0.69% $2,000 $14 In-situ Value/Tonne 100% $169 NSR/Tonne (+) $49 Cu 0.42% $9,000 $38 Avg. Metal Recovery of 40% (x) 40% $68

  13. Slide 13: 2025 Catalysts

    10 2025 CATALYSTS 1. Phase 1 drillholes completed 2. Mineralogical studies 3. Metallurgical studies 4. Formalization of claim on surrounding tailings 5. Expanded Phase 2 drilling program on the Cu-Ag-Au tailings 6. Completion of various site scoping studies: Geotechnical stability Hydrogeology & hyd

  14. Slide 14: Moving Quiulacocha Tailings by Pump Pontoon

    11 MOVING QUIULACOCHA TAILINGS BY PUMP PONTOON TSXV: CDPR OTC: GPPRF FRA: N8HP 14

  15. Slide 15: Cerro de Pasco Post Closure

    12 CERRO DE PASCO POST CLOSURE Artistic Rendering TSXV: CDPR OTC: GPPRF FRA: N8HP 15

  16. Slide 16: Corporate Overview

    13 CORPORATE OVERVIEW LEGEND SHARE STRUCTURE Shares Outstanding 521.4 M Options Outstanding 20.3 M Warrants Outstanding 136.7 M FD Shares Outstanding 678.4 M Market Capitalization* ~$215 M * June 20, 2025 ($0.41) SHARE OWNERSHIP Management & Directors 13.9% Eric Sprott 16.7% TSXV: CDPR OTC: GPPRF FR

  17. Slide 17: Unlocking Value Together

    14 UNLOCKING VALUE TOGETHER Key Takeaways CDPR controls one of the world’s largest above- ground metal resources, rich in silver, critical minerals, zinc, lead, copper, and gold. Quiulacocha’s profile aligns with U.S. interest in near- term gallium supply. Strong economics: up to $6.3B potential LoM

  18. Slide 18: Management Team & Board of Directors

    15 MANAGEMENT TEAM & BOARD OF DIRECTORS STEVEN ZADKA GUY GOULET MANUEL RODRIGUEZ JAMES CARDWELL EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR & CEO EXECUTIVE DIRECTOR & PRESIDENT CHIEF FINANCIAL OFFICER Founding partner of CDPR with over Over 30 years of investment More than 30 years of management CPA-crede

  19. Slide 19: www.pascoresources.com

    WA Pasco RESOURCES WWW.PASCORESOURCES.COM

Cerro de Pasco Resources — Conference Presentation (June 2025) on 6ix