  1. Slide 1: Western Australia's new nickel-copper-PGE frontier

    Western Australia’s new nickel-copper- PGE frontier Corporate Presentation 26 SEPTEMBER 2023 ASX:CHN

  2. Slide 2: Cautionary statements and competent person(s) disclosure

    Cautionary statements and competent person(s) disclosure Authorisation There is a low level of geological confidence associated with Inferred Mineral Competent Persons Statement This Presentation has been authorised for release by the Disclosure Committee. Resources and there is no certainty that fu

  3. Slide 3: Chalice is a leading ASX200 green metals explorer-developer

    Chalice is a leading ASX200 green metals explorer-developer with a track record of creating shareholder value Our purpose – to find the metals Our aspiration – to create a world needed to decarbonise the world class, multi-district green metals (the green metals) province in the West Yilgarn Who we

  4. Slide 4: Company Overview

    Company Overview Our Achievements Corporate snapshot – ASX:CHN Top Shareholders3 Tim Goyder (Founder) 10% • World class Gonneville Ni-Cu-PGE discovery Market Capitalisation1 Goldman Sachs 11% recognised with PDAC Thayer Lindsley Award ~A$1.2Bn (2023) and AMEC Prospector of the Year Shares on issue B

  5. Slide 5: Gonneville Ni-Cu-PGE Project Overview

    Gonneville Ni-Cu-PGE Project Overview A new long-life, low-cost, low-carbon green metals project in Western Australia Strategic and rare green metals1 project in a western jurisdiction – strong potential for a western and green premium Scoped to have world-class sustainability metrics – low carbon i

  6. Slide 6: Gonneville positioned to become a strategic asset for Australia and the western world

    Gonneville is positioned to become a strategic asset for Australia and the western world, given its rare palladium-nickel-cobalt content Gonneville is the first major PGE discovery in Australia Global Palladium and Nickel Primary Supply Market Share (2022)3 and one of the few recent large-scale magm

  7. Slide 7: Gonneville tier-1 scale production profile and competitive financial metrics

    Gonneville has the potential to become a long life asset with a tier-1 scale production profile and highly competitive financial metrics Scoping Study modelled outputs and metrics (15-30Mtpa cases) – indicative metrics with limited engineering/optimisation to date Annual production (avg) Cash costs

  8. Slide 8: Resource scale and quality underlie robust financial metrics

    The scale, quality and location of the Resource underlie the study’s robust financial metrics, generating ~A$6.6-9.9 billion in free cash Total Free Cash and Cashflow Gross Revenue split by commodity A$Bn, real terms, post-tax % LOM Gross Revenue 11 30Mtpa LOM avg ~A$9.9Bn 10 A$690Mpa FCF 3% 2% 9 4%

  9. Slide 9: Both cases modelled in the 2nd quartile of the PGE cost curve

    Both Gonneville cases are modelled in the 2nd quartile of the PGE industry cost curve (after base metal by-product credits) PGE Industry Cost Curve – Net total cash costs per 4E oz (after by-product credits), CY2022, US$/oz 2 Quartile 1 Quartile 2 Quartile 3 Quartile 4 2,000 Avg AISC ~US$1,500 1,600

  10. Slide 10: The rare, tier-1 scale Gonneville Resource

    The rare, tier-1 scale Gonneville Resource has high-grade optionality and compelling growth potential Mineral Resource Estimate1: 3D view (looking ENE) of Gonneville Resource domains and pit shell • 560Mt @ 0.88g/t 3E, 0.16% Ni, 0.09% Cu, 0.015% Co (~0.54% NiEq or ~1.7g/t PdEq) • 16Moz 3E, 860kt Ni,

  11. Slide 11: The Resource remains open down-dip

    The Resource remains open down-dip, with ongoing drilling demonstrating potential for material growth of the deposit • Residual Resource unmined beyond Study 3D view (looking SSW) of Gonneville Intrusion, >0.8% NiEq Resource blocks and drilling modelled life of 90-200Mt for 540-1,100kt contained NiE

  12. Slide 12: Processing flowsheet targeting Cu-PGE-Au concentrate, Ni-Co MHP and doré

    The processing flowsheet envisaged is targeting production of a Cu-PGE- Au concentrate, a battery-grade Ni-Co MHP and a PGE-Au doré Sizing Grinding Oxide feed bypasses flotation and goes to leach circuit – 75% Pd and 90% Au overall recovery from oxide modelled Oxide feed Potential to drop copper flo

  13. Slide 13: Inherent options and upside needing further evaluation

    Going forward, there are inherent options and upside that need further evaluation in mining, processing and commercial areas [Orange] = Near term priorities Assessed upside potential • Early high-grade underground mining in parallel to open-pit phase and block/sub-level caving options • Selectivity,

  14. Slide 14: Development schedule: FID in 2026, first production in 2029

    Targeted project development schedule outlines a Final Investment Decision in 2026 and first production in 2029 Today FID Start Construction First Production 2023 2024 2025 2026 2027 2028 2029 Scoping study development Studies and Prefeasibility study Feasibility study Engineering & Construction Bas

  15. Slide 15: Gonneville occupies ~2km of the >30km Julimar Complex

    The Gonneville Resource occupies just ~2km of the >30km long Julimar Complex – its development could be a province opening play 3D view (looking NW) of the Julimar Complex, Gonneville Deposit, regional targets, soil geochemistry over magnetics State Forest Flinders Target (untested) Large coincident

  16. Slide 16: Deeper drilling at Hooley indicates thickening of the Complex

    Recent deeper drilling at Hooley (~5km from Gonneville) indicates a thickening of the Complex at depth – drilling to restart in late Q3 2023 South Julimar Complex 3D View (looking ENE) – drill holes and Julimar Complex intrusive geology 16

  17. Slide 17: West Yilgarn Ni-Cu-PGE Province

    The Gonneville discovery has kick-started the new West Yilgarn Ni-Cu- PGE Province, which could deliver more major mineral discoveries N • The ‘giant’ ortho-magmatic nickel-copper-PGE sulphide deposits Narryer Terrane such as Norilsk, Jinchuan, Thompson and Voisey’s Bay are located proximal to the m

  18. Slide 18: Regional drilling and strategic partnering as key catalysts

    Regional exploration drilling and the ongoing strategic partnering process represent key upcoming catalysts Chalice’s multi-track value creation strategy at the Gonneville Project is to advance development studies and progress regulatory approvals for a potential mine at Gonneville (located entirely

  19. Slide 19: Highlights

    Highlights Chalice owns 100% Chalice’s team has There is significant of a new long-life, a track record of exploration upside low-cost, low- discovery and value across the exciting carbon green metals creation new West Yilgarn Ni- project in WA Cu-PGE Province 19

  20. Slide 20: Appendix

    Appendix

  21. Slide 21: Chalice is actively growing its organisational capability

    Chalice is actively growing its organisational capability Board of Directors Management Derek La Ferla, Non-Exec Chair Richard Hacker, GM Strategy and Commercial • Highly regarded ASX200 chair and company director with 30+ years experience as a • Chartered Accountant with 20+ years experience in res

  22. Slide 22: Since our 2006 IPO, we have acquired quality assets and generated returns

    Since our 2006 IPO, we have acquired quality assets, advanced projects quickly and generated exceptional returns 2012 2022 Zara Gold 2020 $100M raised 2006 Project in Eritrea sold for 2016 Major PGE- to progress 2023 NI-Cu-Co- Julimar $7.5M raised in ~US$114M Gonneville IPO on ASX to 2009 (pre-tax)

  23. Slide 23: Decarbonisation underpins long-term demand for green metals

    The need to decarbonise the global economy will underpin long-term demand for the green metals at Gonneville Electric Hybrid Energy Semi- Wind & Importance of metals Hydrogen Vehicles Vehicles Storage conductors Solar PV Nickel and Cobalt • Key industrial and electrification metals with unique chemi

  24. Slide 24: Nickel, copper and palladium prices escalated in real terms

    Over the last 20 years, well before decarbonisation demand levers have emerged, nickel, copper and palladium have escalated in real terms Nickel, copper and palladium prices have increased at an avg of 3-9% CAGR* in real terms over the last 20 years, reflecting the scarcity of economic deposits, dec

  25. Slide 25: Strong environmental stewardship at Gonneville

    Chalice is committed to strong environmental stewardship and has a unique opportunity at Gonneville to demonstrate this Strong environmental stewardship • The Gonneville Project is located on Chalice-owned Gonneville Project Biodiversity Goal farmland, which has been subject to extensive To ensure s

  26. Slide 26: One of the lowest carbon intensity nickel projects globally

    Gonneville is positioned to be one of the lowest carbon intensity nickel projects globally, due to its location, scale and sulphide mineralogy • Gonneville MHP 2030 forecast Scope 1 & 2 site emissions (tCo2Eq / tNiEq), cumulative NiEq production (x-axis, kt) carbon intensity estimated to be 10-12 tC

  27. Slide 27: Benefits for the local community and wider region

    The Gonneville Project has the potential to deliver significant benefits for the local community and wider region Chalice has engaged early, actively and Chalice is committed to achieving lasting social Gonneville could deliver significant jobs, skills transparently to build respectful and and econo

  28. Slide 28: Collaborative relationships with Whadjuk and Yued Traditional Owners

    Chalice is building collaborative relationships of mutual benefit with Whadjuk and Yued Traditional Owners Actively engaging and working together to protect cultural heritage and environmental values Our Commitment to Whadjuk Collaboration with Yued South-West Heritage Agreements and Yued Traditiona

  29. Slide 29: Two open-pit development cases scoped

    MINING Given the significant development optionality of the Resource and price uncertainty, two open-pit development cases are scoped Two open-pit development concepts will be progressed into the next study phase (the Pre-Feasibility Study): • 15Mtpa Case: Open-pit mining, with 2Mtpa oxide processin

  30. Slide 30: Study models a tier-1 production profile over 18-19 years

    PROCESSING Study models a tier-1 production profile over 18-19 years: ~280-470kozpa 3E PGE, 9-16ktpa Ni, 10-16ktpa Cu and 0.8-1.4ktpa Co 15Mtpa Case (unoptimised) – 3E total production 30Mtpa Case (unoptimised) – 3E total production koz, 3E recovered LOM average koz, 3E recovered LOM average 600 8ko

  31. Slide 31: Offtake terms expected to be excellent

    MARKETING Offtake terms are expected to be excellent given high-grade of products, low impurities and IRA-compliant source Copper-PGE-Au Nickel-Cobalt Mixed PGE-Au doré Concentrate Hydroxide Precipitate (MHP) • High value concentrate • High quality lithium-ion • Industry standard with negligible imp

  32. Slide 32: Proximity to Perth gives access to infrastructure and workforce

    INFRASTRUCTURE The proximity to Perth allows direct access to major highways, rail, power and port infrastructure and a highly skilled local workforce Western Australia Ranking of jurisdiction attractiveness for mining consistently ranked as the investment (Fraser Institute, 2022) premier mining jur

  33. Slide 33: Existing and potential new infrastructure

    INFRASTRUCTURE The Project will benefit from existing infrastructure, and new potential common use water / power infrastructure is being investigated • ~132kV connection to South West Interconnected System grid (Western Power) – ~25km from Project Electricity • Project to benefit from gradual decarb

  34. Slide 34: Mine proposal requires State and Commonwealth assessment

    PERMITTING The Gonneville Mine proposal will require State and Commonwealth assessment, with opportunities for community and stakeholder input Environmental factors and studies Permitting process Baseline surveys including targeted surveys for threatened Flora and 2024 - Chalice refers proposal to E

  35. Slide 35: Boddington open-pit mine in similar topography near Perth

    PERMITTING The ~40Mtpa Boddington open-pit mine is located in a similar topography and is within a comparable distance from Perth A large operating mine in Successful expansion approvals Significant social and an environmentally and environmental mgmt economic contributions sensitive area The Boddin

  36. Slide 36: Highly competitive cost profile and short payback

    Highly competitive cost profile with LOM avg cash costs of US$160- 230/oz 3E after base metal by-product credits and short ~2yr payback 15Mtpa Case 30Mtpa Case 15Mtpa Case 30Mtpa Case Pre-production CapEx estimate A$M OpEx estimate LOM avg Sulphide Flotation Plant 450 750 Open pit mining A$/t mined

  37. Slide 37: Cash flows robust under range of macroeconomic scenarios

    Gonneville’s modelled cash flows are robust under a range of macroeconomic scenarios Commodity Price Assumptions Study NPV Sensitivity Analysis (A$Bn, post-tax, 6.5% WACC) (AME forecast, avg LOM, 2023 real terms) 30Mtpa Case: A$4.2Bn Nickel US$/t 24,000 PGE prices (+/- 25%) 2.1 6.2 Copper US$/t 11,0

  38. Slide 38: Gonneville Mineral Resource Estimate (JORC 2012)

    Gonneville Mineral Resource Estimate (JORC Code 2012), 28 March 2023 Cut-off Domain Category Mass Grade Contained Metal Grade Pd Au NiEq PdEq Pd Pt Au NiEq PdEq (Mt) Pt (g/t) Ni (%) Cu (%) Co (%) Ni (kt) Cu (kt) Co (kt) (g/t) (g/t) (%) (g/t) (Moz) (Moz) (Moz) (kt) (Moz) Measured - - - - - - - - - -

  39. Slide 39: Higher-grade sulphide component of Gonneville Resource

    Higher-grade sulphide component of Gonneville Resource (in pit and underground), 28 March 2023 Cut-off Domain Category Mass Grade Contained Metal Grade Pd Au Co NiEq PdEq Pd Pt Au NiEq PdEq (Mt) Pt (g/t) Ni (%) Cu (%) Ni (kt) Cu (kt) Co (kt) (g/t) (g/t) (%) (%) (g/t) (Moz) (Moz) (Moz) (kt) (Moz) Mea

  40. Slide 40: Flat grade-tonnage curve highlights higher-grade component

    Flat grade-tonnage curve highlights the significant higher-grade component – providing the project with development optionality Gonneville Nickel Equivalent Grade-Tonnage Curve in-pit (on NiEq cut-off grade basis) Mass (Mt) Grade (% NiEq) 800 1.7 1.8 1.6 1.6 700 677 1.5 1.6 646 1.5 1.4 592 1.3 1.4 6

  41. Slide 41: Metal equivalent assumptions of Gonneville Resource

    Metal equivalent assumptions of Gonneville Resource, 28 March 2023 Based on metallurgical testwork completed to date for the sulphide domain, it is the Company’s opinion that all the quoted elements included in metal equivalent calculations (palladium, platinum, gold, nickel, copper and cobalt) have

  42. Slide 42: Visit our website and sign up to receive our latest news

    Visit our website and sign up to receive our latest news chalice-mining @ChaliceMining www.chalicemining.com Level 3, 46 Colin Street West Perth WA 6005, Australia +61 8 9322 3960 info@chalicemining.com ABN 47 1 16 648 956 42

Chalice Mining — Investor Presentation (September 2023) on 6ix