Harte Gold — Investor Presentation (October 2018)
30 slides from Harte Gold's investor presentation, October 2018
Slide 1: Corporate Presentation
CANADA’S NEXT HIGH-GRADE GOLD MINE GOLD CORP Corporate Presentation www.hartegold.com October 2018 TSX: HRT | FRANKFURT: H4O | OTC: HRTFF
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains forward-looking information under Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Harte Gold’s development potential and timetable of its opera
Slide 3: Company Snapshot
COMPANY SNAPSHOT CORPORATE STRUCTURE INSTITUTIONAL SUPPORT Headquartered: Analyst Following: Toronto, Ontario, Canada Buy Buy Buy Symbol: C$0.75 C$0.80 C$1.20 TSX: HRT FRANKFURT: H4O Major Shareholders*: OTCBB: HRTFF 19.9% 7.2% Market Cap: 0.9% C$265 million (C$0.46/share) Shares Outstanding: 581 mi
Slide 4: Project Location
PROJECT LOCATION 83,850 HECTARES (>200,000 ACRES) CLAIMED ON A MAJOR GREENSTONE BELT IN AN ESTABLISHED MINING REGION 4 TSX: HRT
Slide 5: 2018 – A Big Year for Harte Gold
2018 – A BIG YEAR FOR HARTE GOLD Resource update: tripled resource PEA: $425 M pre-tax NPV5%, 60% pre-tax IRR1 Comprehensive debt financing package, up to US$70 M IBA signed with Pic Mobert First Nation (PMFN) Permits received for full production 100,000 meter drill program – near-mine a
Slide 6: Sugar Zone Mine Ball Mill
SUGAR ZONE MINE BALL MILL 6 TSX: HRT
Slide 7: Sugar Zone Mine Processing Plant
SUGAR ZONE MINE PROCESING PLANT 7 TSX: HRT
Slide 8: High Grade Resource
HIGH GRADE RESOURCE SUGAR ZONE IS ONE OF THE HIGHGEST GRADE DEPOSITS GLOBALLY SUGAR ZONE RESOURCE ESTIMATE 16.0 Grade Contained Category Tonnes (g/t) Au (oz) Indicated 2,607,000 8.5 714,200 Measured + Indicated Resource Grade (g/t Au) Inferred 3,590,000 6.6 760,800 12.0 Sugar Zone Project (as at tim
Slide 9: Leading Growth Profile
LEADING GROWTH PROFILE HARTE GOLD PROVIDES SHAREHOLDERS LEADING EXPOSURE TO RESOURCE AND PRODUCTION GROWTH RESOURCE AND PRODUCTION GROWTH OF SELECTED PRODUCERS* Bubble size illustrates ounces delineated for exploration dollars spent** Gold ` 350% production increasing to >100,000 oz/yr by 2021 (PE
Slide 10: Strong Operating Margins
STRONG OPERATING MARGINS HARTE GOLD IS PROTECTED TO GOLD PRICE VOLATILITY STABLE EQUITY MARGINS AT CURRENT GOLD PRICES Low cost operation, simple metallurgy Figures in CAD, based on PEA Estimates Gold price: 1,600 Tabular ore body, steeply dipping – C$1,600/oz amenable to longhole stoping Operat
Slide 11: Phased Mine Plan Increasing to 1,400 tpd
PHASED MINE PLAN INCREASING TO 1,400 TPD PROVIDES EARLY CASH FLOW AND LONGER TERM GROWTH Today Phase 1: 540 tpd Low risk ramp-up to commercial production (2018 - 2019) H2 2018 H2 2019 Phase 2: Existing surface and underground mining infrastructure is sufficient to support 800 tpd increased throu
Slide 12: Production Profile to +100,000 Oz/Year
PRODUCTION PROFILE TO +100,000 Oz/Year SCALABLE MINE PLAN DESIGNED TO MATCH UNDERGROUND DEVELOPMENT Throughput and Grade 600 10.0 Throughput (ktpa) Grade (g/t Au) 450 7.5 300 5.0 150 2.5 0.0 2018 2020 2022 2024 2026 2028 Phase 1 & 2 (800 tpd) Phase 3 (1,400 tpd) Diluted Head Grade Production Forecas
Slide 13: Construction Is Complete and Commissioning Well Underway
CONSTRUCTION IS COMPLETE AND COMMISSIONING WELL UNDERWAY Construction / Commissioning Construction of the crushing spread and mill complex is complete Grid connection completed Underground development targets exceeded, critical infrastructure is complete Permitting Fully permitted for commer
Slide 14: Opportunities to Enhance Value
OPPORTUNITIES TO ENHANCE VALUE SIGNFICANT DRILLING COMPLETED IN 2018 TO SUPPORT THE FOLLOWING: PEA incorporated drilling up to Dec. 2017 Improve head grade Increase drill density to improve overall grade Infill drilling to date has returned very positive results +500,000 ounces currently n
Slide 15: Opportunities to Enhance Value
OPPORTUNITIES TO ENHANCE VALUE AREAS TARGETED FOR NEAR MINE DRILLING “LOW HANGING FRUIT” Southeast Northwest 15 TSX: HRT
Slide 16: 2018 Drill Program
2018 DRILL PROGRAM POSITIVE DRILLING TO IMPROVE RESOURCE GRADE AND ADD OUNCES TO THE MINE PLAN Sugar Zone Deposit Middle Zone Wolf Zone Fox Zone 0m FW 6.42 gpt Au/4.23 m 23.64 gpt Au/2.28m (UZ) 19.47 gpt Au/1.59m (UZ) FW 5.41 gpt Au/7.66 m 250 m 17.94 gpt Au/1.40m (UZ) 10.98 gpt Au/1.43m (FZ) 1.59gp
Slide 17: Deep Drill Targets
DEEP DRILL TARGETS FINAL DRILLING FOR 2018 WILL TEST CONTINUITY OF MINERALIZATION AT DEPTH 17 TSX: HRT
Slide 18: Enhancing Project Value “Stairway”
ENHANCING PROJECT VALUE “STAIRWAY” SEVERAL OPPORTUNTIIES NOT CAPTURED IN THE PEA $750 mining dilution, lower mineable mining costs resource by ? 534,000 ounces Pre-Tax NPV5% ($ Millions) $600 ? head grade: 7.0 – 8.0 g/t ? $450 $425 ? ? $344 $300 $150 US$1,250/oz US$1,350/oz Improve Head Upgrad
Slide 19: Near-Mine and Property-Wide Exploration
NEAR-MINE AND PROPERTY-WIDE EXPLORATION Increased overall land position to 83,850 hectares Wolf Zone Fisher Zone 35 Km strike length to be Middle Zone explored Fox Zone Eagle Zone ` Near-mine targets Sugar, Sugar Zone Middle, Wolf and Fox Zones EM Targets Eagle and Highway Zones Lynx Zone permitted
Slide 20: Key Takeaways
KEY TAKEAWAYS Fully permitted for commercial production Production growing to +100,000 ounces annually by 2021 Simple mine design, well understood orebody AISC US$708/oz – first quartile cash cost producer Opportunities to grow value: Improvements to grade through infill drilling (underw
Slide 21: Appendix
APPENDIX www.hartegold.com TSX: HRT | FRANKFURT: H4O | OTC: HRTFF TSX: HRT
Slide 22: Experienced Management Team
EXPERIENCED MANAGEMENT TEAM Stephen G. Roman Roger J. Emdin Rein Lehari George Flach Chairman, President & CEO; Vice President, Operations; Chief Financial Officer; Independent Consultant; BA P.Eng. CPA, CA B.Sc. P.Geo. 35+ years 30+ years 30+ years 30+ years Discovered Gold Eagle, Senior manage
Slide 23: Experienced Management Team (Cont’d)
EXPERIENCED MANAGEMENT TEAM (Cont’d) Tim Campbell Shawn Howarth Steve Ball Bob Kusins Vice President & Secretary; Vice President, Corporate General Manager, Sugar Resource Geologist; BA Hons. Development; MBA, B.Eng. Zone Mine; P.Eng. P.Geo. 20+ years 15+ years 30+ years 35+ years Government & Per
Slide 24: Underground Mining Started in 2017
UNDERGROUND MINING STARTED IN 2017 100,000 TONNES OF MATERIAL MINED TO-DATE, DE-RISKING TO COMMERCIAL PRODUCTION Lower Zone Ore Face 70,000 tonne bulk sample completed in 2017, ore shipped to Barrick’s Hemlo Mill for processing 8 Meter Width 30,000 tonnes of underground development completed to
Slide 25: Fully Funded to Production
FULLY FUNDED TO PRODUCTION CLOSED DEBT FINANCING PACKAGE WITH SPROTT RESOURCE LENDING AND APPIAN CAPITAL Sprott Facility Up to US$50 million under a senior secured credit facility Appian Subordinated Loan US$20 million loan, subordinated to Sprott facility Benefits Flexible principal and intere
Slide 26: PEA Summary
PEA SUMMARY Input Unit Value Gold Price US$/oz $1,250 Exchange Rate CAD:USD 0.80 Average Annual Throughput (2019+) tpa 403,000 Average Daily Throughput (2019+) Tpd 1,100 Total Processed Tonnes 4,539,800 Macro and Diluted Head Grade g/t 6.5 Physical Gold Recovery % 95.4% Parameters Mine Life Years 12
Slide 27: NPV and IRR Summary
NPV AND IRR SUMMARY Gold Price Sensitivities Unit US$1,150/oz PEA Pricing US$1,350/oz Macro Parameters Gold Price US$/oz $1,150 $1,250 $1,350 Exchange Rate CAD:USD 0.80 0.80 0.80 Pre-Tax NPV and IRR NPV @ 5% M C$ $263 $344 $425 IRR % 40% 50% 60% Post-Tax NPV and IRR NPV @ 5% M C$ $189 $244 $299 IRR
Slide 28: First Quartile Cash Cost Producer
FIRST QUARTILE CASH COST PRODUCER HARTE GOLD’S ALL IN SUSTAINING CASH COSTS ARE IN THE TOP QUARTILE OF PRODUCERS AISC of US$708 / oz over mine life Sugar Zone, Harte Gold* $3,000 $2,500 AISC (US$/oz) $2,000 $1,500 $1,000 $500 0% 25% 50% 75% 100% Cumulative Production Source: SNL Market Intelligence,
Slide 29: Slide 29
Slide 30: Gold Corp TSX: HRT
i GOLD CORP at h Ye ay vs Chall