Artemis Gold Inc · TSXV:ARTG

Artemis Gold — Q3 2025 Earnings Presentation

15 slides from Artemis Gold's earnings presentation, Nov 5, 2025

  1. Slide 1: Q3 2025 Results Conference Call

    TSX-V: ARTG | artemisgoldinc.com Q3 2025 Results Conference Call NOVEMBER 5, 2025

  2. Slide 2: Forward Looking and Cautionary Statements

    Forward Looking and Cautionary Statements This presentation contains certain forward-looking statements and forward-looking information as defined under applicable Canadian and U.S. securities laws. Statements contained in this press release that are not historical facts are forward- looking stateme

  3. Slide 3: On Today's Call

    On Today’s Call STEVEN DEAN DALE ANDRES JEREMY LANGFORD TONY SCOTT Executive Chair Chief Executive Officer & Director President Chief Business Development Officer GERRIE VAN DER WESTHUIZEN CANDICE ALDERSON ERIK MARCHAND MEG BROWN Chief Financial Officer and Chief ESG Officer VP Finance VP Investor R

  4. Slide 4: Q3 2025 Operating Highlights

    Q3 2025 Operating Highlights Plant operating at design capacity; grades and recoveries trending higher OPERATING RESULTS: Total post- Select Operating May and Q3 2025 commercial • AISC2 margin of US$2,374/oz or 72% of cash revenue Metrics June 2025 production • Production of 60,985 oz gold, up from

  5. Slide 5: Mine Operating Improvements

    Mine Operating Improvements Mine operations are performing above plan Mined tonnes exceeding plan, focus is on productivity and continuous improvement • Short interval control with real-time fleet monitoring • Consistent operating practices and reducing delays 2025 Monthly Mined Tonnes (Mt) 4.0 3.0

  6. Slide 6: Mill Operating Improvements

    Mill Operating Improvements Focus has evolved from initial ramp-up to operational stability and optimization Advancing productivity and operating improvements in the mill • Mill reliability • First full ball mill reline completed in October • Reducing unplanned downtime through maintenance strategie

  7. Slide 7: 2025 Guidance – AISC Revised; Lowest Decile

    2025 Guidance – AISC2 Revised; Lowest Decile Production guidance (190,000-230,000oz of gold) Original guidance maintained, but expect in the lower half of the range Costs – guidance revised Post-commercial production1 AISC2 increased to US$825-US$875 per oz of gold sold, up from US$670-US$770 per ou

  8. Slide 8: Q3 2025 Financial Highlights

    Q3 2025 Financial Highlights Industry-leading AISC margin; generating strong and steady cash flows Select Financial Information Earnings Drivers: ($000s except ounces sold and per share Q3 2025 YTD 2025 Q2 2025 information) • 27% increase in gold ounces sold Gold ounces sold 62,863 121,916 49,517 •

  9. Slide 9: Financial Highlights: Balance Sheet Strengthened

    Financial Highlights: Balance Sheet Strengthened Refinanced project debt during Q3 2025; now focused on building cash for expansion Paid down $67M of debt during Q3 2025 Restructured term Project Loan Facility into RCF $75 M • Improved terms and greater flexibility • Closed $700M RCF in September To

  10. Slide 10: Capital Projects – Building for the Future

    Capital Projects – Building for the Future Key Phase 1 deferred capital projects in 2025 15 metre lift on tailings dam • In preparation for Phase 1A and Phase 2 • Alternative sourcing of construction materials required Ore stockpile construction • Additional capacity required earlier due to waste co

  11. Slide 11: Progressing Near-term Organic Growth Opportunities

    Progressing Near-term Organic Growth Opportunities Phase 1 asset optimization – above design throughput in Q3, targeting 10% above by the end of 2025 Phase 1A step change – construction started in September, increasing plant throughput to 8Mtpa by Q4 2026 Optimized and accelerated Phase 2 expansion

  12. Slide 12: Phase 1A – A Capital Efficient Step Change Opportunity

    Phase 1A – A Capital Efficient Step Change Opportunity Nameplate plant capacity 33% Capital cost Industry low capital intensity 6Mtpa 8Mtpa Q3 2025 Q4 2026 in nameplate capacity $100-$110M <$55 per tonne of annual throughput New Aeration Tank – Rebar Installation Phase 1A will be funded through oper

  13. Slide 13: Phase 2 – Optimized and Accelerated Expansion

    Phase 2 – Optimized and Accelerated Expansion Front End Engineering and Design (FEED) for a larger Phase 2 progressing on schedule, with early works set to commence in Jan 2026 Orders placed for new 18MW SAG & ball mills • New ball mill is fully fabricated • Derisking long lead procurement of key co

  14. Slide 14: Regional Exploration Program – Highly Prospective District

    Regional Exploration Program – Highly Prospective District • Land package of 1,490 sq km prospective for multiple deposit types • Over 30 targets identified within trucking distance of the Blackwater mine • Regional exploration drilling began in October 2025 • Initial $5 million program; 15,000 - 25

  15. Slide 15: Q3 Summary / Q4 Priorities

    Q3 Summary / Q4 Priorities Solid Q3 results – Operating above nameplate capacity; continuing to optimize plant and cost performance Robust balance sheet – Growing cash balance and strong liquidity Strong AISC margins – Industry-leading Q3 AISC margin of US$2,374 per oz Phase 1A – engineering and con

Artemis Gold — Q3 2025 Earnings Presentation on 6ix