  1. Slide 1: Analyst Day Presentation August 26, 2014

    www.sanchezenergycorp.com Results Driven. Manufacturing Focused. Analyst Day Presentation August 26, 2014

  2. Slide 2: Legal Disclaimers

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Legal Disclaimers Forward Looking Statements This presentation contains, and our officers and representatives may from time to time make, “forward-looking statements” within the meaning of the safe harbor provisions of the Private Securities Litiga

  3. Slide 3: Agenda

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Agenda 3 Topic Presenter Company Overview 9:00 am – 9:15 am Tony Sanchez, III President & CEO Operations 9:15 am – 10:00 am Chris Heinson, SVP, COO Steve Adam, SVP, Operations Will Satterfield, SVP, Asset Development Asset Detail 10:00 am – 12:00 p

  4. Slide 4: Company Overview

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Company Overview 4

  5. Slide 5: Key Considerations

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Key Considerations 5 Attractive, Low- Risk Growth Plan . One of the fastest growing E&P companies in North America - Strong, successful history of reserve, production and EBITDA growth since our IPO - Organic growth through the drill-bit complement

  6. Slide 6: Eagle Ford Shale Position

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Eagle Ford Shale Position 6 SN Eagle Ford Position Summary Net Acres ~224,000 Current Production (Boe/d) ~37,000 Operated Rigs Non-Operated Rigs Gross Producing Wells 422 Alexander Ranch Briggs Ranch Hausser Wycross Talbutt Trust

  7. Slide 7: Transformational Growth

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 7 Transformational Growth At IPO (12/31/11) Today (6/30/14) Production •609 Boe/d •37,000 Boe/d Proved Reserves •6.7 MMBoe •14% PD •117 MMBoe •51% PD PV-10 •$152 million •$1,977 million LTM Revenue •$15 million •$216 million (1) LTM Adj. EBITDA •$6

  8. Slide 8: Delivering Strong Results

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 8 Delivering Strong Results - 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 (MBOE/D) Actual PF Catarina Production 2012 2013 2014 $0 $50 $100 $150 $200 $250 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 ($ Millions) Actual PF

  9. Slide 9: 2014-2015 Production & Capital Guidance

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 9 2014-2015 Production & Capital Guidance 2014 2015 SN Standalone $565 - $615 $700 - $750 Catarina 205 - 215 330 - 370 Total Pro Forma D&C Capital Plan $770 - $830 $1,030 - $1,120 SN Standalone Facilities, Leasing, and G&G 55 50 - 55 Catarina Facil

  10. Slide 10: Capital Expenditures Focused On Eagle Ford

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina $205 - $215 Marquis $270 - $285 Palmetto $45 - $55 Cotulla $50 - $60 Wycross $140 - $150 TMS $60 - $65 Capital Expenditures Focused On Eagle Ford (1) 10 Eagle Ford: 92% 2014 Drilling & Completion Capital Plan By Area ($MM) Gross % of % of

  11. Slide 11: Analyst Day Highlights

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 11 Analyst Day Highlights . Deep inventory of high-return, low risk locations underpins growth - 2,800+ net drilling locations . 2015 production guidance midpoint ~55,000 boe/d . Low cost and efficient producer - Technically driven corporate cultur

  12. Slide 12: Operations: A Manufacturing Transformation

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Operations 12 A Manufacturing Transformation

  13. Slide 13: Manufacturing Culture

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Manufacturing Culture 13 “Highly collaborative company focused on being data driven and consistently generating increasing returns.” . Experienced petro-technical staff - Multi-basin experience . Cross-functional communications - Asset teams . Supp

  14. Slide 14: Operational Strategy

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Operational Strategy 14 Asset Exploitation Capital Efficiency Strategic Acquisitions Sustainable Return Oriented Growth Organic Growth

  15. Slide 15: Asset Exploitation

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Asset Exploitation 15

  16. Slide 16: Asset Development Life Cycle

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Asset Development Life Cycle 16 . Appraisal - Vertical Wells and Cores - 2D and 3D Seismic - Areal Extent Determination . Data Integration - Landing Depth and Well Placement - Lateral Length - Completion and Frac Design . Harvest - Well Spacing - M

  17. Slide 17: Marquis Prost Project Cycle

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Prost Project Cycle Example 1 pilot + development well (LEF) 3D seismic; 2 pilots; 6 LEF appraisal wells 6 pilots, 45 LEF development wells, additional acreage additions 17 6 pilots, 75- 85 LEF development wells; UEF appraisal; UEF & Buda s

  18. Slide 18: Tailored Programs Enhancing Returns

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Tailored Programs Enhancing Returns 18 Down spacing pilots Buda open hole lateral development UEF standalone, UEF/LEF stacking overlap Down spacing pilots, UEF/Buda tests Longer laterals, down spacing pilots Longer laterals, higher proppant load tr

  19. Slide 19: Stacked Lateral Potential

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Stacked Lateral Potential 19 Upper Eagle Ford Buda Lower Eagle Ford Target 2 Lower Eagle Ford Target 1 Marquis Palmetto Cotulla- Wycross Cotulla-La Salle/Frio Catarina Development Appraisal

  20. Slide 20: Return Focused Completion Design

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Return Focused Completion Design 20 Well designs are customized to maximize net present value Fracture Simulation Size NPV $0.0 Wycross Target Window

  21. Slide 21: Capital Efficiency

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Capital Efficiency 21

  22. Slide 22: Anatomy of a Well Cost

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Anatomy of a Well Cost 22 Drilling Completions Facilities Lift Design and Process Driven Unit Cost Driven - Proppants - Chemicals - Tanks - Artificial Lift - OCTG - Facilities Examples . Supply Chain . Demand Planning . Direct Sourcing . Design imp

  23. Slide 23: Operational Support System (OSS) Overview

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Operational Support System (“OSS”) Overview 23 Home Page • Shows Tasks and Action Items assigned to user Action Items • Logging and tracking of needed actions • Assigned to individuals • Appears in users’ Home page Well Master Centralized database

  24. Slide 24: Supply Chain Management – Strategic Sourcing Approach

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Secured first-order savings by optimizing suppliers and terms . Leverage OSS forecasts to secure additional price and logistical savings . Apply direct sourcing techniques . Rigorously negotiate contracts . Drive sustainable advantages 24 Industr

  25. Slide 25: Well Cost Reductions – SN Competitive Advantage

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Well Cost Reductions – SN Competitive Advantage 25 $9.5 $7.3 $12.9 $0.0 $2.0 $4.0 $6.0 $8.0 $10.0 $12.0 $14.0 $MM SN Competitive Advantage Appraisal Well Multi-Well Pad + Zipper Frac Savings Field Development and Well Design Savings

  26. Slide 26: Drilling Process Commercialization

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 26 Drilling Process Commercialization $- $200 $400 $600 $800 $1,000 $1,200 $1,400 0 2 4 6 8 10 12 Prost C3Prost C4Prost C5Prost C6Prost D1Prost B5Prost B4 Cost/Foot ($) Days Rotary Steerable (“RSS”) Days Avg Cost per Foot ($) $- $200 $400 $600 $800

  27. Slide 27: Completions Process Efficiencies

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Completions Process Efficiencies . Mapped completion processes - Parallel and competing initiatives . Cross-functional integrations - Contingency planning . Critical sourcing and resources - Non-dedicated services . Carry-forward documentation - Le

  28. Slide 28: Cost Improvement Initiatives

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 30% Decrease in Total Well Cost Across Assets > 100% Increase in Number of Frac Stages Pumped Per Day 35% Increase in Average Ft. Drilled Per Day 40% Decrease in Spud to TD . Supply Chain leveraging OSS planning - Secure critical services and logis

  29. Slide 29: Strategic Acquisitions

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Strategic Acquisitions 29

  30. Slide 30: Acquisition History

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acquisition History 30 Acquisition : Catarina Timing : June 2014 Purchase Price ($MM) : 639 Acquisition : Cotulla Timing : May 2013 Purchase Price ($MM) : 265 Acquisition : Five Mile Creek Timing : July 2013 Purchase Price ($MM) : 29 Acquisition :

  31. Slide 31: Acquisition Strategy

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acquisition Strategy 31 1. Cost structure improves return of capital following acquisition 2. Less expensive alternative to leasing with reduced risk and lease expiration burden 3. Maintain conservative financial position post acquisition Opportuni

  32. Slide 32: Scalable Organization Prepared for Growth

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Scalable Organization Prepared for Growth 32 Process Driven Project Management . Rigs and frac spreads fully utilized immediately following acquisition . “Bullpen” of drill ready locations provides options to accelerate development or shift resourc

  33. Slide 33: Cost Reductions Expanding Core

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cost Reductions Expanding Core 33

  34. Slide 34: Cotulla Acquisition Area

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Acquisition 34 Area Locations Valued at Acquisition 1P Value 3/31/13 ($MM) 2P Locations 2P Value 6/30/14 ($MM) Alexander Ranch 46 241 73 400 Briggs Ranch 8 17 23 58 Talbutt 5 7 14 38 Wright Ranch 5 10 15 22 Cenizo 9 16 20 24 Total 78 $291 1

  35. Slide 35: Optimization of Alexander Ranch

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Optimization of Alexander Ranch 35 $- $2.0 $4.0 $6.0 $8.0 $10.0 Previous Operator 3Q13 4Q13 1Q14 ($MM) Drilling Completions Facilities 5 Wells 8 Wells 7 Wells • Acquisition Date (5/31/13) • SN results include production facilities & expected initia

  36. Slide 36: Catarina Acquisition Rationale

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina Acquisition Rationale . Immediately accretive to EPS, CFPS, production per share and reserves per share . $10.65 per BOE based on Ryder Scott YE13 Proved Reserves - $17.75 per BOE Proved Developed Reserves . $26,374 per 1Q14 production BOE

  37. Slide 37: Asset Detail

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Asset Detail 37

  38. Slide 38: Catarina Asset

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 38 Catarina Asset

  39. Slide 39: Catarina Map

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 39 Catarina Map

  40. Slide 40: Catarina Overview

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina Overview 40 Total Net Acres ~106,000 Average Working Interest 100% Average Net Revenue Interest 75% Planned Well Spacing (Acres) 75 – 100 Net Identified Drilling Locations 600 - 1,000 Gross Wells On Production (1) 176 Awaiting / Undergoing

  41. Slide 41: Catarina Status Update

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 41 Catarina Status Update . Since closing the acquisition on June 30, we have moved swiftly to develop Catarina - After brief transition period with Shell, SN took over full operations on August 1 . Drilling: 2 rigs pad drilling on Western Side - A

  42. Slide 42: Western Catarina Offset Operator Performance

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina Western Catarina Offset Operator Performance 42 . The Western Catarina area contains similar subsurface attributes to the direct offset operators in the Lower Eagle Ford (LEF) formation, which have seen excellent results Source: Data per p

  43. Slide 43: SN Catarina Development

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation A3 PILOT TOC 0 10 SN Catarina Development . Focus on TOC rich Lower Eagle Ford . Target zone of Rosetta, APC, SM, etc. (all offsetting operators) . Multiple targets in both the Upper Eagle Ford and Lower Eagle Ford . Varied completions based on pro

  44. Slide 44: Western Catarina Development Plan

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . SN intends to target the Lower Eagle Ford (LEF) with additional infill potential in the Upper Eagle Ford (UEF) as a secondary target . The majority of wells drilled in Catarina thus far have targeted the UEF at ~100 acre spacing - SN believes tha

  45. Slide 45: Regional Cross Section of Lower Eagle Ford

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Successful SN wells from Alexander Ranch and Briggs Ranch have similar LEF core & log rock quality as the Eastern Catarina area . 3D Seismic and key appraisal wells over acreage position to guide the ~37,000 undeveloped net acre evaluation Region

  46. Slide 46: Optimization of Base Production – Tubing Installation

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Optimization of Base Production – Tubing Installation Catarina Well Sample EUR Comparison (Tubing vs. No Tubing) Tubing No Tubing * Analysis based on South-Southwest area wells using 2-stream EURs EUR (2-Stream MBoe) Cumulative Probability ~120 MBo

  47. Slide 47: Catarina Upper Eagle Ford Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Upper Eagle Ford (450-500 MBoe EUR) Catarina Upper Eagle Ford Economics 47 Western Catarina Area Previous Operator Upper Eagle Ford Results

  48. Slide 48: Catarina Prospective Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 0 200 400 600 800 1,000 1,200 0 12 24 36 48 60 72 84 96 108 Av erag e Mont hly Prod uction (Bo e/d) Months 700 MBoe 600 MBoe Catarina Prospective Economics 48 Western Catarina Area Lower Eagle Ford Type Curves and Well Economics (1) 1. Assumes $95

  49. Slide 49: Tuscaloosa Marine Shale Asset

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Tuscaloosa Marine Shale Asset 49

  50. Slide 50: Acreage Position and Activity

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acreage Position and Activity 50 . ~58,000 net acre position in the core of the TMS - Contiguous blocky acreage with 3+ years of average remaining lease term . SN anticipates spudding up to 4 gross (2 net) operated wells including participating in

  51. Slide 51: Sanchez Position in Core of the TMS

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Sanchez Position in Core of the TMS 51 SN’s acreage position is highlighted in yellow

  52. Slide 52: Tuscaloosa Marine Shale

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Tuscaloosa Marine Shale 52 . Industry increases in TMS related capital spend expected to continue . Experience gained in Eastern Eagle Ford key in quickly commercializing acreage . Geopressure and abundance of natural fractures driving high product

  53. Slide 53: Keys to Exploiting TMS

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Mechanical earth modeling . Reservoir characterization . Casing designs (upper & lower TMS) . Drill strings and BHA design optimization . Mud rheological properties Technical Operational 53 Keys to Exploiting TMS . Utilizing Eagle Ford leverage t

  54. Slide 54: New Growth Cycle - TMS Development Potential

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation New Growth Cycle - TMS Development Potential 54 118% 43% 0% 20% 40% 60% 80% 100% 120% 140% 160% $80 $90 $100 IRR Oil Price / Bbl $10 MM Well $15 MM Well Current Oil Price IRR Sensitivity to Capex and Pricing . Current well costs estimated between $

  55. Slide 55: TMS Area Type Curve & Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Oil Price ($ / Bbl) $80.00 $90.00 $100.00 NPV-10 ($MM) $5.1 $7.4 $9.6 IRR 34% 49% 65% Payout (Years) 2.1 1.6 1.3 ROI 2.4x 2.8x 3.2x 600 MBoe EUR @ $10.0 MM Capex Oil Price ($ / Bbl) $80.00 $90.00 $100.00 NPV-10 ($MM) $10.6 $13.6 $16.5 IRR 73% 100%

  56. Slide 56: Cotulla Asset

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 56 Cotulla Asset

  57. Slide 57: Cotulla Map

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Map 57 HAUSSER ALEXANDER RANCH TALBUTT

  58. Slide 58: Cotulla Acreage Breakdown

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Acreage Breakdown 58 Total Net Acres ~41,000 Average Working Interest 85% Average Net Revenue Interest 64% Planned Well Spacing (Acres) 40 Net Identified Drilling Locations 700+ 2014 Capital Plan ($MM) $140 – $160 Gross Full Year Rig Count

  59. Slide 59: Alexander Ranch: Drilling & Completions Efficiency

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Alexander Ranch: Drilling & Completions Efficiency 59 11.0 9.0 7.0 7.0 0 2 4 6 8 10 12 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Number of Days (Spud to TD) . 35% reduction in well costs from previous operator while using the same drilling rig - Cost reducti

  60. Slide 60: Alexander Ranch Development

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Alexander Ranch Development 60 Hess Development Plan: 43 Total Wells SN Development Plan: 73 Total Wells . After acquiring Hess properties, SN’s analysis has resulted in tighter well spacing, higher ultimate recovery and more wells drilled at Alexa

  61. Slide 61: Alexander Ranch: Well Cost Reductions

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Alexander Ranch: Well Cost Reductions . SN has achieved substantially lower than expected well costs in the Cotulla area - The previous operator was drilling wells at an average cost of ~$8.8 million - At the time of the acquisition, SN expected to

  62. Slide 62: Cotulla La Salle (Alexander Ranch) Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla La Salle (Alexander Ranch) Economics 62 Cotulla (La Salle) Well Snapshot EUR (MBoe) 450 PV-10 ($MM) $4.0 - $4.5 IRR (%) 45% - 57% Gross Well Cost ($MM) $5.5 - $6.0 % Oil / Liquids 69% / 82%

  63. Slide 63: Wycross Acre Development

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Wycross 40 Acre Development 63 LEF BUDA UEF Sting Ray Corvette Gran Torino

  64. Slide 64: Wycross Harvest Development & Domal Appraisal

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Wycross Harvest Development & Domal Appraisal 64 . Recently completed (and continuing to develop) near domal appraisal drilling in the Lower Eagle Ford - Results proving economic viability of drilling the salt dome . Brought 5-well Lower Eagle Ford

  65. Slide 65: Wycross: Drilling & Completions Efficiency

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Wycross: Drilling & Completions Efficiency 65 $6.2 $0.0 $1.0 $2.0 $3.0 $4.0 $5.0 $6.0 $7.0 $8.0 $9.0 $10.0 Previous Operator Total Cost - First Well Drilling Cost Savings Completion Cost Savings Other Cost Savings Total Cost - 2Q14 $MM $(0.6) $(2.1

  66. Slide 66: Cotulla Wycross Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Wycross Economics 66 Cotulla (Wycross) Well Snapshot EUR (MBoe) 500 PV-10 ($MM) $6.6 - $7.6 IRR (%) 72% - 109% Gross Well Cost ($MM) $6.0 - $7.0 % Oil / Liquids 82% / 90%

  67. Slide 67: Hausser Ranch Potential Development

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Hausser Ranch Potential Development Virtex McLean-5 1,700 lbs/ft sand IP: 953 BOPD LEF BUDA UEF 67 Hausser 1H Pilot Kincaid Ranch Hausser Ranch

  68. Slide 68: Marquis Asset

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Asset 68

  69. Slide 69: Marquis Map

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Map 69 LEF BUDA UEF Prost Area Pilot

  70. Slide 70: Marquis Fayette & Lavaca County Breakdown

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Fayette & Lavaca County Breakdown 70 Total Net Acres ~71,000 (1) Average Working Interest 100% Average Net Revenue Interest 75% Planned Well Spacing (Acres) 60 Net Identified Drilling Locations 900+ 2014 Capital Plan ($MM) $270 – $285 Gross

  71. Slide 71: Marquis Project Cycle Example – 1Q12

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Project Cycle Example – 1Q12 71 1 Pilot; 1 LEF Devleopment Well 1Q12 Marquis Well Economics (450 MBoe EUR) Gross Well Cost ($MM) $15.0 IRR (%) Uneconomic PV-10 ($MM) Uneconomic

  72. Slide 72: Marquis Project Cycle Example – 1Q13

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Project Cycle Example – 1Q13 72 3D Seismic; 2 Pilots; 6 LEF development wells 1Q13 Marquis Well Economics (450 MBoe EUR) Gross Well Cost ($MM) $12.0 IRR (%) 11% PV-10 ($MM) $0.2

  73. Slide 73: Marquis Project Cycle Example – Projected YE14

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Project Cycle Example – Projected YE14 74 3D Seismic; 6 Pilots; 75-85 LEF development wells ; 4 UEF Appraisal wells; UEF & Buda Stacked pay potential development YE14 Marquis Well Economics (450 MBoe EUR) Gross Well Cost ($MM) $7.0 IRR (%)

  74. Slide 74: Prost: Drilling & Completions Efficiency

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Prost: Drilling & Completions Efficiency 75 32.3 25.0 20.0 21.0 18.0 15.0 0 5 10 15 20 25 30 35 Q1 '13 Q2 '13 Q3 '13 Q4 '13 Q1 '14 Q2 '14 Number of Days (Spud to TD) . Technically challenging area of the Eagle Ford shale play; 3-string casing desig

  75. Slide 75: Prost / Moulton LEF Field Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Prost / Moulton LEF Field Economics 77 • Well results include both Prost analog wells and offset operator results respective to Moulton acreage Prost / Moulton Well Snapshot EUR (MBoe) 450 PV-10 ($MM) $4.2 - $5.2 IRR (%) 38% - 53% Gross Well Cost (

  76. Slide 76: Five Mile Creek: Future Development

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Five Mile Creek: Future Development 78 . Shallow decline production profile with prevalent natural fractures throughout the play . Successfully de-risked Lower Eagle Ford development in the play - Additional potential for Buda development . Recentl

  77. Slide 77: Five Mile Creek: Drilling & Completions Efficiency

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Five Mile Creek: Drilling & Completions Efficiency 79 Recent Well Results and Forward Projections . Expectations for further cost reductions; similar to that of South Texas assets - 2-string casing design . Drilling cost reductions due to BHA and r

  78. Slide 78: Marquis Five Mile Creek Field Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Five Mile Creek Field Economics 80 Five Mile Creek Well Snapshot EUR (MBoe) 350 PV-10 ($MM) $2.3 – $3.3 IRR (%) 26% - 40% Gross Well Cost ($MM) $6.0 - $7.0 % Oil / Liquids 80% / 92%

  79. Slide 79: Offset Operator Results – Upper Eagle Ford

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Offset Operator Results – Upper Eagle Ford 81 LEF BUDA UEF 2014 SN UEF Tests Key UEF Production Prost Area Pilot PVA Welhuassen A2 (2013) 2,165 boepd ftp: 4500 psi PVA Fojtik 1 (2013) 1,209 boepd Cum: 84 mbo Sabine Targac 1 (2013) 1,034 boepd PVA M

  80. Slide 80: Marquis Regional Eagle Ford Section

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 82 WEST EAST BUDA LEF UEF Marquis Regional Eagle Ford Section

  81. Slide 81: Palmetto Asset

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Asset 83

  82. Slide 82: Palmetto Map

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Map 84 LEF BUDA UEF

  83. Slide 83: Palmetto Overview

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acreage & Inventory Operational Update (1) Well Economics 2014 Capital Plan 85 Palmetto Overview Palmetto Area Acreage 1. Well status as of 8/6/14 Total Net Acres ~9,000 Average Working Interest 50% Average Net Revenue Interest 37% Planned Well Spa

  84. Slide 84: Palmetto Down spacing Results

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Down spacing Results 86 40 Acre Development Results . Early results produced less than a 10% degradation in total EUR - Results in increased NPV per unit relative to 60 acre development 60 acre 40 acre 2015 Development Plan . 1 continuous

  85. Slide 85: Palmetto Field Economics

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Field Economics 87 Palmetto Well Snapshot EUR (MBoe) 450 –750 PV-10 ($MM) $4.2 – $13.3 IRR (%) 45% – 200% Gross Well Cost ($MM) $7.0 – 7.5 % Oil / Liquids 75% / 89%

  86. Slide 86: Midstream & Marketing

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Midstream & Marketing 88

  87. Slide 87: Delivery Options Snapshot

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 89 Delivery Options Snapshot 45°API 42°API 62°API 44°API South Texas has a long history of oil & gas with significant existing takeaway capacity - In addition to existing pipeline infrastructure, short-haul trucking is a viable economic alternative

  88. Slide 88: Pro Forma Q2 Realized Price and Mix

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 62% 45% 71% 87% 85% 79% WTI $102.99 SN Company Catarina Cotulla Marquis Wycross Palmetto 37% 12% 27% 24% Oil Condensate NGL Gas 85% 7% 8% Oil Gas NGL Liquids Weighted Hydrocarbon Mix . Liquids constitute ~76% of production - ~37% is oil production

  89. Slide 89: Oil Marketing

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Higher crude to condensate ratios derive greater value as measured to WTI benchmark Oil Marketing NE. Eagle Ford S. Eagle Ford . Marquis - API ~42° - Lease sales at LLS less ~$5.00-$7.00 . Palmetto - API ~42° - Lease sales at LLS less ~$4.00-$6.00

  90. Slide 90: Condensate Marketing

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Condensate marketing focused on new markets - Catarina production marketed as processed condensate • 40,000 BOPD Processing Capability; 8 x 5000 Bbl distillation units; 2 CPF’s (Central Processing Facilities) . Recent US Department of Commerce ru

  91. Slide 91: Condensate Strategy

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . SN believes that Catarina facilities can be “fit for export” - All wells at Catarina are permitted gas wells - Hydrocarbon at Catarina exists in the reservoir in a gaseous state. - At the surface wellhead the hydrocarbon goes through a high press

  92. Slide 92: Gas Marketing

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 94 Gas Marketing . Gas connected to pipelines . ~98% liquids rich gas produced . Firm takeaway covers ~77% of forecasted long-term production, supplemented with interruptible contracts NE. Eagle Ford S. Eagle Ford . Five Mile Creek - DCP Midstream

  93. Slide 93: NGL Marketing

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 95 NGL Marketing . NGLs currently processed and sold as products: - Average price for Q214 of $30.96 - Gas processing flexibility to trigger Ethane rejection operation - Average liquid content of ~6.5 GPM increases product component yields 56% 23%

  94. Slide 94: Midstream Strategy

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Midstream Strategy 96 . Multiple markets are key to achieve best net-back . Evaluating projects that create new markets - Port Projects - Gas & Condensate Processing - Trucks & Pipelines . Control of Midstream allows SN to: - Avoid long term T&D Ag

  95. Slide 95: Hedging Program and Hedge Summary

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Hedging program protects cash flow, development and capital spend - Hedging program targets ~50% of production over the next 12-18 months - ~30% of anticipated balance of 2014 production hedged at mid-point of guidance range - ~30% of anticipated

  96. Slide 96: Financial Review

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Financial Review 98

  97. Slide 97: Conservative Financial Strategy

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 99 Conservative Financial Strategy . Target 2.0x –2.5x leverage given volatility of commodity prices - Preserve financial flexibility and dry powder through undrawn revolver facility and cash . Continue to maintain a balanced capital structure - Ac

  98. Slide 98: Capitalization

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Capitalization . Current liquidity of $811 million - $386 million in cash - $437.5 million borrowing base with an elected commitment of $425 million and $0 million drawn . No debt maturities until 2018 - Revolver currently 2018 - Senior notes 2021

  99. Slide 99: Capitalization Summary

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 101 Capitalization Summary . Revolving credit facility (due 2018) - $437.5 MM borrowing base with an elected commitment of $425 million and an interest rate of LIBOR + 1.50% - 2.50% - Restrictive covenant: Net Debt < 4.0x TTM EBITDA . $600 MM of 7.

  100. Slide 100: Share Count and Dilution

    © 2014 Sanchez Energy Corporation 102 Share Count and Dilution . Basic shares outstanding of 58.4 million (as of 8/8/14) - Includes 2.6 million restricted shares which have not yet vested . Fully diluted shares outstanding of 71.0 million - Assumes conversion of both series of preferred stock which

  101. Slide 101: Market Capitalization and Enterprise Value

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 103 Market Capitalization and Enterprise Value . Below calculations show detail behind Market Capitalization and Enterprise Value - Key considerations include correctly accounting for basic shares outstanding, preferred stock and face value of debt

  102. Slide 102: Summary

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Summary 104

  103. Slide 103: Analyst Day Highlights

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 105 Analyst Day Highlights . Deep inventory of high-return, low risk locations underpins growth - 2,800+ net drilling locations . 2015 production guidance midpoint ~55,000 boe/d . Low cost and efficient producer - Technically driven corporate cultu

  104. Slide 104: Appendix

    © 2014 Sanchez Energy Corporation INTERNAL USE ONLY Appendix 106

  105. Slide 105: Summary Terms: Revolving Credit Facility

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Summary Terms: Revolving Credit Facility Borrower Sanchez Energy Corporation Guarantors All existing and future direct and indirect domestic subsidiaries except for designated unrestricted subsidiaries Facility $1.5 billion Senior Secured Revolving

  106. Slide 106: Summary Terms: Convertible Preferred

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Summary Terms: Convertible Preferred Principal . $94.3 million Dividend Rate . 4.875% Shares Outstanding . 1.886 million Key Features . Cumulative . Mandatorily Convertible (On or after October 5, 2017, subject to SN common stock trading at or abov

  107. Slide 107: Non–GAAP Reconciliation and Measures

    INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 109 Non–GAAP Reconciliation and Measures Reconciliation of Net Income (Loss) To Adjusted EBITDA ($M) Reconciliation of PV-10 To Standardized Measure ($MM) The summary pro forma information with respect to the Company’s and the Catarina acquisition’