Harmony Gold Mining — Technical Presentation (September 2012)

33 slides from Harmony Gold Mining's technical presentation, Sep 26, 2012

  1. Slide 1: Wafi-Golpu Project

    WAFI-GOLPU PROJECT Max Esparon and Mike Humphries Analyst site visit 26 September 2012 1 w w w . h a r mw onwyw. c. hoa. zr m a ony.co.za

  2. Slide 2: Safe Harbour Statement and Competent Person Statement

    Private Securities Litigation Reform Act Safe Harbour Statement and Competent Person Statement This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and 21E of the Securities Exchange Act of 1934, as amended, that are int

  3. Slide 3: Agenda

    Agenda 1 Golpu movie 2 Governance and overview 3 Wafi-Golpu geology system 4 Golpu pre-feasibility 3 www.harmony.co.za

  4. Slide 4: Golpu movie

    Golpu movie This movie is also available on the website at www.harmony.co.za 4 www.harmony.co.za

  5. Slide 5: Governance and overview

    Governance and overview An exciting investment proposition 5 www.harmony.co.za

  6. Slide 6: Organisation structure for the MMJV companies

    Organisation structure for the MMJV companies 50:50 Joint venture between Harmony and Newcrest 6 www.harmony.co.za

  7. Slide 7: Management

    Management 7 www.harmony.co.za

  8. Slide 8: Wafi-Golpu project – overview

    Wafi-Golpu project – overview • Located ~80km from regional, industrial and commercial hub, Lae • 50:50 JV project with Harmony Gold Mining Co Ltd and Newcrest Mining Limited • Three major deposits – Wafi – epithermal gold deposit – Golpu – copper gold porphyry deposit – Nambonga – copper-gold porph

  9. Slide 9: Wafi-Golpu project – current status

    Wafi-Golpu project – current status • Existing road network from Lae to Wafi-Golpu • 300 person camp • Exploration drilling program • Initial construction works including road development • Community and environmental studies and programs • Studies – Golpu pre-feasibility study and Wafi concept stud

  10. Slide 10: Wafi-Golpu geology system

    Wafi-Golpu geology system An exciting investment proposition 10 www.harmony.co.za

  11. Slide 11: Wafi-Golpu Resources as at 30 June 2012

    Wafi-Golpu Resources as at 30 June 2012 Golpu • 1 000Mt @ 0.63g/t Au, 0.90% Cu (20.3Moz Au, 9.0Mt Cu) Wafi • 132Mt @1.69g/t Au (6.9Moz Au) Nambonga • 40Mt @0.79g/t Au, 0.21% Cu (1.0 Moz Au, 0.1Mt Cu) Total Resource • 1 172Mt 28.3Moz Au, 9.08Mt Cu Northern Gold Zone • New gold zone (+200m strike) con

  12. Slide 12: Wafi-Golpu is highly prospective – deposit scale upside

    Wafi-Golpu is highly prospective – deposit scale upside • Current drilling suggests upside for Lift 1 – High grade mineralised porphyries more extensive than previously thought (implying more contained metal) – Strike opened to north with latest drill intercepts • WR433 – 190m@ 1.15g/t Au, 2.57%Cu •

  13. Slide 13: Wafi-Golpu is highly prospective – system scale upside

    Wafi-Golpu is highly prospective – system scale upside 13 www.harmony.co.za

  14. Slide 14: Wafi is also highly prospective

    Wafi is also highly prospective • Concept Study underway to evaluate the potential for Wafi • Includes open pit mining at NRG Zone (Non-refractory gold) and underground mining at Link Zone • Exploration for more Wafi style mineralisation 14 www.harmony.co.za

  15. Slide 15: Nambonga porphyry

    Nambonga porphyry • Nambonga North resource – 1.0 Moz gold – 80 Kt copper • Mineralisation defined over 200m of strike to date • Open to north and at depth • Vein stockwork with sericite alteration 15 www.harmony.co.za

  16. Slide 16: Wafi-transfer zone is highly prospective

    Wafi- transfer zone is highly prospective • Characteristically, major porphyry copper-gold deposits occur in groups as clusters or as an alignment of several deposits along structural trend • Wafi transfer is a major northeast trending crustal structure • Numerous high tenor, cohesive gold surface g

  17. Slide 17: Golpu pre-feasibility

    Golpu pre-feasibility An exciting 17 investment proposition 17 www.harmony.co.za

  18. Slide 18: Golpu mining approach

    Golpu mining approach • Two block cave lifts: sequential mining of lifts • Rock mass preconditioning by hydraulic fracturing and conditioning techniques • Mine development plan further optimised in Feasibility Study • Remains open at depth; good potential for Lift 3 18 www.harmony.co.za

  19. Slide 19: Golpu processing

    Golpu processing • Plant will be designed in modular stages to match mining ramp-up profile • Initial capacity of 15Mtpa, upgrade to 22Mtpa and scope for expansion to +25Mtpa throughput • Flow sheet comprises primary crushing underground then a SAG and ball mill grinding circuit to achieve target to

  20. Slide 20: Processing flow sheet

    Processing flow sheet 20 www.harmony.co.za

  21. Slide 21: Gold recovery

    Gold recovery • Gold is very fine (mostly below 10 microns) • Most commonly occurs on sulphide and/or gangue mineral boundaries • Gold reports to floatation – currently float optimised for copper recovery • Potential to increase gold recovery through float optimisation • Additionally, new Lift 1 mat

  22. Slide 22: Golpu proposed infrastructure

    Golpu proposed infrastructure • Connection from Mare to Highland Hwy to be a public road • Multiple terrestrial TSF • Concentrate pipeline follows road options alignment • Camp pad commencing • Initial 500 person camp • 2 ventilation shafts • Filter plant, concentrate storage • Refrigeration and coo

  23. Slide 23: Golpu updated Ore Reserve estimate

    Golpu updated Ore Reserve estimate Contained Potential production rate Grade metal (Mtpa) Mt Au g/t Cu% Au Moz Cu Mt 2007 Pre-feasibility study 2 lifts 9 70 0.61 1.10 1.3 0.8 2012 Pre-feasibility study Lift 1 15 82 0.65 1.19 1.7 0.9 Lift 2 22 368 0.90 1.21 10.7 4.5 Total 450 0.86 1.21 12.4 5.4 Figur

  24. Slide 24: Golpu pre-feasibility study

    Golpu pre-feasibility study Pre-feasibility 22Mtpa capacity Units Result Production life Years 26 Peak Au production koz pa 560 Peak Cu production kt pa 335 Annual Au production koz pa 490 Annual Cu production kt pa 290 Gold cash cost US$/oz Negative 2 600 Copper cash cost US$/lb 0.54 Total initial

  25. Slide 25: Production profile: PFS base case, 22 Mtpa

    Production profile: PFS base case, 22 Mtpa 25 www.harmony.co.za

  26. Slide 26: Golpu project capital requirements

    Golpu project capital requirements Project-enabling capital Capex opportunities • Mining environment • Golpu has flexible timeline to optimise capital (scale, water and heat conditions) spend • Regional infrastructure • Sourcing and execution strategy will be – Roads and bridges reviewed – Power and

  27. Slide 27: World class Golpu resource

    World class Golpu resource Porphyry Copper - Gold Deposits - SE Asia (bubble size represents total Au-equivalent ounces1) 1.30 1.20 Oyu Tolgoi 248 Moz 1.10 Golpu Project 1.00 69 Moz 0.90 0.80 Tampakan 0.70 94 Moz Cu (wt %) Northparkes Grasberg Ok Tedi 0.60 12 Moz 20 Moz 329 Moz 0.50 Frieda River 83

  28. Slide 28: Upside potential

    Upside potential • Higher grade and recovery in Lift 1 – recently 3 holes in upper section of Golpu deposit returned high grade intercepts • Optimise metallurgical recovery for gold – during the feasibility study the metallurgical studies will test an increase in gold recovery • Ramp up and producti

  29. Slide 29: Production profile – enhanced production case

    Production profile – enhanced production case 29 www.harmony.co.za

  30. Slide 30: Sustainable development

    Sustainable development • Mostly PNG workforce • Focus on health, safety and welfare of • Opportunities for local businesses employees and communities • Environmental approach meets international • Implement water management strategy standards • Investment in training programs and facilities • Inves

  31. Slide 31: Next steps

    Next steps • Engagement with Government, landowner communities and other stakeholders • Exploration and drilling at Wafi-Golpu to continue • Continue community and environmental programs • Start Feasibility first half 2013, pending consultation outcomes and approval by JV Boards 31 www.harmony.co.za

  32. Slide 32: Site trip

    Site trip Chopper to Wafi, via • Lae Bulolo Hwy • Demarkwa • Access Rd Site tour • Orientation • Drillcore • Drill site • Access rd • Watut flat • Camp location Lunch Chopper to Lae, via • Camp • Process plant site • Portal and decline route • Potential TSF site • Markham farm • 9 Mile ops centre an

  33. Slide 33: An exciting investment proposition

    Henrika Basterfield Investor Relations Manager Tel: +27 (0)11 411 2314 Mobile: +27 (0)82 759 1775 Email: henrika@harmony.co.za Marian van der Walt Executive: Corporate and Investor Relations Tel: +27 (0)11 411 2037 Mobile: +27 (0)82 888 1242 Email: marian@harmony.co.za An exciting investment proposi