Gryphon Gold Corporation

Gryphon Gold — Investor Presentation (October 2010)

26 slides from Gryphon Gold's investor presentation, Oct 28, 2010

  1. Slide 1: Gryphon Gold Corporation

    GrYPHON’GOLD (Conporation] GGN:TSX | GYPH:OTC.BB October 21, 2010

  2. Slide 2: Cautionary Note

    ; Gryphon Gold Corporation ed Cautionary Note 2 Road to Production

  3. Slide 3: Going Forward... Development Plan for the Borealis Property

    Gryphon Gold Corporation se Going Forward... ee Development Plan for the Borealis Property Road to Production Road to Production

  4. Slide 4: Introduction

    Gryphon Gold Corporation Introduction = ‘The “Road to Production” plan is an engineered approach to bring the Borealis Oxide Heap Leach Mine as published in the September 21, 2009 Independent Pre-Feasibility Study to production in a phased manner ‘While total capital required is expected to be in li

  5. Slide 5: Location

    Gryphon Gold Corporation ed Location sat 5 Road to Production

  6. Slide 6: Overview

    | Gryphon Gold Corporation Overview ahetes ‘The “Road to Production” is based on upon a quick start to this permitted (all major permits are in place) resource by utilizing already mined materials and generating cash flow in a 4 month period from ground-breaking. The Phase 1 concept is to recover ma

  7. Slide 7: Borealis Reserves/Resources

    Gryphon Gold Corporation Borealis Reserves/Resources GoldGrade Gold Oz. Tons (oz./ton) Contained Proven and Probable Gold Reserves” 16,650,000 0.093 377,356 Oxide/Mixed Resources” Inferred In-Situ 11,064,000 0.019 211,344 Inferred Heaps and Lean Ore 14,064,000 0.010 138,700 Sulphide Resources” Measu

  8. Slide 8: Permitting Status

    Gryphon Gold Corporation ae te : mal Permitting Status All Major Operating Permits are in Place * Borealis Project’s Modified Plan of Operations - U.S.F.S. #02-04-08 Approved « N.D.E.P. Water Pollution Control Permit - Approved + N.D.E-P. Air Quality Permit - Approved + N.D.O.W. Artificial Pond Perm

  9. Slide 9: Initial Gold To Market

    Gryphon Gold Corporation ed Initial Gold To Market — Proposed 1* and 2"¢ Phase of Start-up * 3-4 Months from Breaking Ground to Gold Production * Low Capital Cost” * Positive Cash Flow” — Is expected to Finance Full Production

  10. Slide 10: Oxides = Opportunity

    Gryphon Gold Corporation at Oxides = Opportunity sist Proven and Probable Reserve = 377,356 0z. Au Inferred Resource = 350,044 oz. Au Full Oxide Heap Leach Production of Project Reserves is expected to generate Positive Operating Revenue” The proposed oxide heap leach operation is expected to provid

  11. Slide 11: 23.5 Square Miles of Potential Gold Discoveries

    Gryphon Gold Corporation ee 23.5 Square Miles of Potential “~~ Gold Discoveries Opportunity to... * Explore High Sulphidation Host Rock * Expand Oxide Proven and Probable Gold Ounces * Expand Graben Sulphide Gold Resource * Identify new, potentially large, deposits in the Western Pediments ll Road t

  12. Slide 12: Current Gold Mineralization

    Gryphon Gold Corporation cl Current Gold Mineralization Proven and Probable Gold Reserves” 877,356 Oxide/Mixed/Sulphide Measured Resources” 276,700 Oxide/Mixed/Sulphide Indicated Resources” 807,500 Total 1,461,556 (2) Oxide/Mixed/Sulphide Inferred Resources 1,065,844 0) Recast sated sss pepe ccs web

  13. Slide 13: Exploration Potential

    Gryphon Gold Corporation cd Exploration Potential i * 23.5 Square miles of High Sulphidation System * One of the best exploration targets in Nevada * Confirmed by — Past Successful Exploration Drilling — Geophysics — Successful Mining History — The Historically Prolific Walker Lane Gold Belt Past Su

  14. Slide 14: Future Oxide Gold Targets

    Gryphon Gold Corporation ae Future Oxide Gold Targets ~~ — Targets identified by nearby drill intercepts, structural controls, geophysical anomalies, and favorable geology * Permitted Project Area — 12 Targets * East of Permitted Project Area — 8 Targets (Not permitted) * West of Permitted Project A

  15. Slide 15: Future Borealis Trend Sulphide Gold Targets

    Gryphon Gold Corporation se Future Borealis Trend Sulphide Gold Targets — Graben area activities to increase sulphide resources — Infill drilling — Structural extension drilling outside the identified deposit — Four other Target Areas to extend sulphide resources — Drilling below existing pit floors

  16. Slide 16: Future Western Pediments Gold Targets

    Gryphon Gold Corporation cd Future Western Pediments Gold Targets * Lucky Boy Target — Positive structural and geophysical signatures — Drillholes in area show strong sulphide silica alteration * Sunset Wash Target — Similar in size, structure, and signature to Lucky Boy (Although targets have limit

  17. Slide 17: Phase 1

    17 Gryphon Gold Corporation cd Phase 1 — * Construct Leach Pad * Mine, agglomerate, and place Freedom Flats Re-Leach (1.03 M tons @ 0.026" oz. /ton Au) ¢ Process pregnant gold solution through Carbon Columns * Recovery of gold from heap to carbon = 40%") * Toll recovery of gold and silver to bullion

  18. Slide 18: Freedom Flats Basis of economic calculations

    Gryphon Gold Corporation Freedom Flats [Historical Leach Pad Shown] soon Basis of economic calculations + Operating cost/ton ore - $4.00/ton" + Production rate - 6,000 pa + Gold content - 0.026 o2/t + Tons available - 1.03 Mt + Approximate Recovery - 40% + Processing Days - ~172 days * Royalty - 1%/

  19. Slide 19: Phase 2

    19 Gryphon Gold Corporation cd Phase 2 = ¢ Expand Leach pad * Mine East Ridge Pit (North Block Model) (2.192 M tons @ 0.018") 0z./ton Au) * Process pregnant gold solution through Carbon Columns * Recovery of gold from heap to carbon = 75%" * Toll recovery of gold and silver to bullion Road to Produc

  20. Slide 20: North Block Model Basis of economic calculations

    EE EE Ee LY North Block Model [East Ridge Pit Shown] Basis of economic calculations + Operating cost/ton ore ~ $7.50/ton + Production rate - 6,000 pd + Gold content - 0.018 o2./t + Tons available - 2.192Mt + Approximate Recovery ~ 75% + Processing Days - ~366 days + Royalty - 19/$100 Price of Gold N

  21. Slide 21: Phase 1 and 2 Revenue Estimates

    pW h-hh se = re ee Phase 1 and 2 Tons available ~ 3.229 Mt, Processing Days - ~538 days, Gold ounces recovered - ~29,592 $4.00/ton operating cost!) Freedom Flats Re-Leach Price of Gold ($/oz.)(2) $1000 $1200 $1400 Approximate Revenue (millions) $5.53 $7.50/ton operating cost Price of Gold ($/oz.)!*)

  22. Slide 22: Phase 1 Capital Requirements

    Gryphon Gold Corporation se Phase 1 Capital Requirements ~~ * March 2011 Capital Equipment and Leach Pad Projected Costs" $2,059,052 Working Capital” $3,410,689 Bonding” $1,400,000 Contingency $1,130,259 Total® $8,000,000 2: Road to Production

  23. Slide 23: Phase 2 Leach Pad Expansion and East Ridge Development

    Gryphon Gold Corporation ae Phase 2 Leach Pad Expansion ° and East Ridge Development Capital Requirements * September 2011 Capital” $1,500,000 Mobilization” $500,000 Bonding” $1,100,000 Total® $3,100,000 23 Road to Production

  24. Slide 24: Full Production Level Capital Requirements

    Gryphon Gold Corporation cd Full Production Level” Capital Requirements * October 2011 - June 2012 ADR® $2,200,000 Facilities” $5,400,000 Freight & Sales Tax” $700,000 EPCM, Permitting, & Bonding” $700,000 Total $9,000,000 (Q) al production sfes ome pln set ut in Soeur 21,2009 Independent Pe Feast S

  25. Slide 25: Gold Production Plan

    Gryphon Gold Corporation el Gold Production Plan ns Recoverable” Gold Gold Ounces Ounces Placed Recovered” Year 1 18,172 13,818 Year 2 39,973 35,441 Year 3 52,738 46,635 Year 4 57,043 56,080 Year 5 48,954 50,320 Year 6 34,560 36,677 Year 7 2,480 7,949 Total 946,990 246,990 Gy eden ncn adi asec Giuai

  26. Slide 26: Estimated Timeline

    Gryphon Gold Corporation ad Estimated Timeline * December 2010 - Metallurgical Testing and Grade Confirmation * March 2011 - Initial Pad/Service/Support Construction * April 2011 - Initial Pad Completion Process Releach Ore * May 2011 - Process Fluid Return + July 2011 - Toll Carbon Stripping for Go