Sterling Infrastructure, Inc. · NASDAQ:STRL
Sterling Infrastructure — Corporate Update (October 2026)
22 slides from Sterling Infrastructure's corporate update, Oct 1, 2026
Slide 1: Always Moving Forward
ALWAYS MOVING FORWARD. ©2026 Plateau Excavation, Inc. All rights reserved.
Slide 2: Slide 2
Slide 3: Plateau at a Glance
PLATEAU AT A GLANCE 6 Specialized companies One Vertically Integrated Team. Full Service Sitework Solutions. 40+ 1,800+ 1,400+ YEARS OF TOTAL OWNED EXPERIENCE EMPLOYEES Site development and FLEET heavy civil construction Tunneling and boring #1 85% MISSION CRITICAL ENR EXCAVATION CONTRACTOR REPEAT C
Slide 4: Markets We Serve
MARKETS WE SERVE From mission critical campuses to industrial complexes and public infrastructure. MISSION CRITICAL INDUSTRIAL & MANUFACTURING E-COMMERCE & DISTRIBUTION COMMERCIAL INFRASTRUCTURE WHATEVER THE MARKET. OUR COMMITMENT REMAINS THE SAME. PEOPLE Our strength QUALITY We build it right, INNO
Slide 5: People
PEOPLE CATERPILLAR
Slide 6: Tenure & Plateau Pride
TENURE & PLATEAU PRIDE AVERAGE TENURE FOR FIELD SUPERVISORS: 18 YEARS AVERAGE TENURE FOR OFFICE LEADERSHIP TEAM: 21 YEARS
Slide 7: Investing in Our People
INVESTING IN OUR PEOPLE FIELD CAREER INTERNSHIPS TRAINING DEVELOPMENT GROWTH
Slide 8: Safety
SAFETY
Slide 9: Training & Development
TRAINING & DEVELOPMENT EMR | 0.67 4,375 30+ 2,432 1,253 TOTAL TRAINING COMPLETIONS SAFETY & HEALTH CLASSES EQUIPMENT-TRAINING COMPLETIONS AUGUST COMPLETIONS HOW WE TRAIN: SAFETY & HEALTH SIMULATION FIELD TRAINING UTILITY LOCATE TRAINING 2026 YTD | AS OF 8/18/26
Slide 10: Quality
QUALITY
Slide 11: More Than Moving Dirt: The Self Perform Advantage
MORE THAN MOVING DIRT THE SELF PERFORM ADVANTAGE SCHEDULE QUALITY CONTROL ASSURANCE Fewer handoffs. Built in from Fewer delays. the start. COST ACCOUNTABILITY EFFICIENCY One team from Reduced markups start to finish. and change orders.
Slide 12: Equipment & Resources
Equipment & Resources 1,400+ PIeces of Owned Equipment Fleet Headquartered in Georgia with an office in Florida, providing local expertise and the resources of a nationally backed company. EQUIPPED TO PERFORM AT SCALE
Slide 13: What We Do
WHAT WE DO SITE MASS UNDERGROUND STORMWATER SITE DEVELOPMENT GRADING PREPARATION UTILITIES MANAGEMENT RETAINING DRY INFRASTRUCTURE WALLS CONCRETE UTILITIES MICROTUNNELING INFRASTRUCTURE SPECIALIZED DRILLING & DEMOLITION SPECIALTY SAFETY & QUALITY SERVICES BLASTING SERVICES
Slide 14: Underground Infrastructure
UNDERGROUND INFRASTRUCTURE UNDERGROUND STORM EXCAVATION DRAINAGE SANITARY & ELECTRICAL DUCT MICROTUNNELING WATER BANKS
Slide 15: Innovation
INNOVATION
Slide 16: Construction Technology
CONSTRUCTION DRONE & AERIAL INTELLIGENCE PROJECT INTELLIGENCE TECHNOLOGY Drone Mapping Volumetric Calculations Field Data Production Tracking Progress Tracking Site Documentation As-Built Validation Data-Driven Planning BIM / VDC GPS MACHINE 3D Modeling CONTROL Utility Coordination Precision Grading
Slide 17: Built for Mission Critical
BUILT FOR MISSION CRITICAL SCALE Proven expertise SPEED Greater control from PRECISION Built into RELIABILITY Backed by at scale start to finish every operation Sterling Infrastructure
Slide 18: Mission Critical by the Numbers
MISSION CRITICAL BY THE NUMBERS MORE THAN A DECADE OF MISSION CRITICAL EXPERIENCE +9 GW Delivered at Scale +31,000 AC Developed +55M CY Dirt Moved +431K LF Duct Banks Installed +692K LF Storm Installed +631K LF Water Installed
Slide 19: Mission Critical Lifecycle
SELECT PROJECTS BY STATE MISSION CRITICAL LIFECYCLE * *Only representative of a portion of owned acreage
Slide 20: Total Site Acreage by Select Locations
TOTAL SITE ACREAGE BY SELECT LOCATIONS
Slide 21: Why Clients Choose Plateau
WHY CLIENTS CHOOSE PLATEAU SELF-PERFORM EXPERIENCED FINANCIAL SAFETY TECHNOLOGY RELIABLE ADVANTAGE WORKFORCE STRENGTH FIRST DRIVEN DELIVERY Greater control from Proven expertise Backed by Built into Driving accuracy Proven performance, start to finish at scale Sterling Infrastructure every operation
Slide 22: Q&A
Q&A
Sterling Infrastructure — Corporate Update (October 2026) on 6ix