Tocvan Ventures Corp. · CSE:TOC

Tocvan Ventures — Investor Presentation (February 2022)

17 slides from Tocvan Ventures's investor presentation, February 2022

  1. Slide 1: Developing Gold-Silver Projects in Mexico

    DEVELOPING GOLD-SILVER PROJECTS IN MEXICO February 2022 CSE: TOC | OTCQB: TCVNF | FSE: TV3

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Statements in this corporate presentation contain forward looking information including expectations of future production and commodity prices, drilling and exploration plans, timing and amounts of capital expenditures and future expenditure levels. Readers are cautioned t

  3. Slide 3: Mission Statement

    MISSION STATEMENT IDENTIFY undervalued advanced stage targets with the potential for large scale mineral resources. CREATE shareholder value through acquisitions and strategic partnerships. ADVANCE our project portfolio with technical tact and aggressive drill targeting. BUILD our team from the stre

  4. Slide 4: Why TOC?

    WHY TOC? Au-Ag FOCUSED Our Team 100% INTEREST IN PILAR & PICACHO Currently Drilling at Pilar Brodie A. Sutherland – President & CEO P.Geo with over 15 years of industry experience exploring and developing key assests in over 20 countries. 32 MM Shares Outstanding Rodrigo Calles Montijo – Exploraton

  5. Slide 5: Our Vision

    OUR VISION Develop into a leading mineral exploration and development company in Mexico and beyond. Continue to add shareholder value through exploration and development of quality gold-silver assets in an established mining jurisdiction. PILAR • Continued Discovery and Expansion through Drilling •

  6. Slide 6: Two Gold-Silver Assets in Sonora

    Two Gold-Silver Assets in Sonora • PILAR • Advanced Stage, 22,700m drilled to date • Road accessible • Fully Permitted for drilling and trenching • EL PICACHO • Brownfields exploration • 18 km SW of San Francisco Mine • Road accessible,140 km NW of Hermosillo • 6 km of prospective trends • Fully per

  7. Slide 7: Sonora – A Mine Friendly State

    Sonora – A Mine Friendly State Established Mining Jurisdiction Probable Reserves: 375k oz Au @ 0.59 g/t • Sonora produces a third of 5.5 Moz Ag @ 8.75 g/t 50 k ounces per year Mexico’s gold +500k oz Au Resources • 50 km west of Minera Argonaut – La Colorada Bulk test mining: 50k tonnes, avg Alamos’

  8. Slide 8: Pilar – Prior to TOC

    PILAR – Prior to TOC • 17,700m of historic drilling • 2,650m of channel sampling • 614 Rock Samples • 446 Soil Samples Growth through exploration November, 2019 – Pilar Acquisition TOC- MC (CAD) Share Price (CAD) 2MM $0.15

  9. Slide 9: Phase I – Drilling

    Phase I – Drilling Phase I - Highlights JES20-36: 24.4m @ 2.5 g/t Au and 73 g/t Ag JES20-033 incl. 1.5 m @ 33.4 g/t Au and 1,090 g/t Ag JES20-036 JES20-032 JES20-32: 94.6m @ 1.6 g/t Au incl. 9.2 m @ 10.8 g/t Au and 38 g/t Ag JES20-33: 41.2m @ 1.1 g/t Au incl. 3.1 m @ 6.0 g/t Au and 12 g/t Ag Februar

  10. Slide 10: Phase I – Drilling

    Phase I – Drilling Table of JES20-32 results From (m) To (m) Interval (m) Au (g/t) Ag (g/t) 57.95 59.48 1.53 3.64 14 59.475 61 1.53 16.50 29 61 62.53 1.53 10.25 70 62.525 64.05 1.53 25.00 62 64.05 65.58 1.53 7.04 42 65.575 67.1 1.52 2.18 10 67.1 68.63 1.53 0.81 7 68.625 70.15 1.53 1.11 5 70.15 71.68

  11. Slide 11: Phase II – Drilling

    Phase II – Drilling Expansion Drill Program • Expanded MZ to NW, SE & E • Hit on NEW 4-Trench Extension • NEW Target Areas Tested July 30, 2021 – Completion of Phase II TOC - MC (CAD) Share Price (CAD) 42MM $1.50

  12. Slide 12: 2022 Trench Results

    2022 Trench Results All 4 Trenches Mineralized • T-21-2: Entire length has grade – 19.5m @ 0.61 g/t Au • T-21-3: Entire length has grade 19.5m @ 0.73 g/t Au • Bulk material from T-21-2 to T-21-4 submitted for column leach studies

  13. Slide 13: 2022 Surface Results

    2022 Surface Results 4 Priority Target Areas Expand Trends to Southeast • 9.2 g/t Au and 279 g/t Ag • 6.6 g/t Au and 433 g/t Ag • 524 g/t Ag and 1.3 g/t Au • 3.1 g/t Au and 27 g/t Ag

  14. Slide 14: El Picacho

    EL PICACHO •Road accessible •140 km NW of Hermosillo •Railroad on eastern edge of Project •18 km SW of San Francisco Mine •Five Orogenic Gold Targets – 6km of prospective trend defined by: •Underground workings •Recon drilling •2,650 rock samples •3,548 soil samples •17.8 line-km of IP •Fully permit

  15. Slide 15: Picacho Project - San Ramon Target

    PICACHO PROJECT - SAN RAMON TARGET SAN FRANCISCO MINE 4-Lane Highway National Railroad Low angle fault/ contact with Jurassic sediments Underground Working: 10 samples from 0.41 to 8.2 280m g/t Au DRILL TARGET Underground Drive 70m long: 28 samples from 0.29 to 21.8 g/t Au

  16. Slide 16: Development Timeline

    DEVELOPMENT TIMELINE EXPANSION ESTABLISHMENT Phase III Drilling Phase I Drilling Advance MET Studies RESOURCE DEFINITION Maiden Resource Calculation 2021 Q2-Q3 2022 2020 Q4 2022 Q1 EXPANSION ENGINEERING STUDIES Phase II Drilling BULK TEST MINING Prelim MET Studies PICACHO AQUISITION DRILL TARGETING

  17. Slide 17: Contact Us

    CONTACT US CSE: TOC | OTCQB: TCVNF | FSE: TV3 TOCVAN VENTURES CORP. Brodie A. Sutherland, P.Geo. Telephone: 403-829-9877 Email: bsutherland@tocvan.ca

Tocvan Ventures — Investor Presentation (February 2022) on 6ix