Slide 1: Pure European Oil and Gas
“Pure European Oil and Gas” September 2011
Slide 2: Overview
Overview • Balanced Portfolio with a number of near term, high impact opportunities – prioritising on-shore European gas production, appraisal and exploration Netherlands Switzerland • Primary Objective to Increase Cash Flow by ramping up production & increase value across the portfolio through deve
Slide 3: Slovenia / Hungary
Slovenia / Hungary Petišovci Lovászi Introduction Block Block • 200 km2 project area straddling Slovenia/Hungary border • Contains three former oil and gas fields: • Petišovci - SLOVENIA • Lovászi - HUNGARY • Ujfalu - HUNGARY • Full 3-D seismic acquired across the complete Pannonian Basin Project ar
Slide 4: Petišovci Closure & Reservoirs
Petišovci Closure & Reservoirs • Primary Proven/Producing Middle Miocene •Stacked A – F sands A •Primary E sand producer • Pg-11A & Pg-10 wells •Confirmed gas pay in Middle Miocene reservoirs Pg-11A well •Encountered deeper Middle/Lower Miocene with extra reserve potential •‘K’ sand produced 0.9 Mcf
Slide 5: Petišovci Project
Participation 16% 100% 50% 50% 25% 75% Petišovci Project 48.25% 5
Slide 6: Petišovci – Historical Production
Petišovci – Historical Production 2000 100 1800 90 1600 80 1400 70 1200 60 1000 50 16% 800 40 600 30 400 20 200 10 0 0 1940 1950 1960 1970 1980 1990 2000 2010 5.0 4 4.5 3 y) 4.0 3 3.5 3.0 2 ( 2.5 2 2.0 1.5 1.0 0.5 5 0.0 0 Pontian Production 5.6 MMbbl; 34.3 Bcf Badanian Production 8.7 Bcf 6
Slide 7: Wells
Wells Positioned to exploit a significant opportunity • Pg-1, 5 and 7 historical wells produced total 8 Bcf from Middle Miocene RPS Audit (P90) E1 Sand with minor production from Pg- Pg-11A well Mid Miocene 250m net Mid Miocene 3,6,and 9 114m net Lwr Miocene Reserve Area ~ Est. 400 GIP • Pg-11A test
Slide 8: Pg-11,11A Well results
Pg-11,11A Well results Increasing pressure with depth means lowest sands should flow more easily but not all can I be frac’ed at the same time N C R 'A' Sands tested dry gas to surface E A S Pg-11A I well N 'B' Sands gas bearing G Original (RPS) Mid Miocene Pay P Lwr Miocene 'C' Sands gas bearing Se
Slide 9: Comparison of Pg-11A & Pg-5 Reservoirs
Comparison of Pg-11A & Pg-5 Reservoirs Pg-11A ‘K’ Sand (+ Example Pay Section) Pg-5 ‘E1’ sand log comparison Pg-11A well Example of one net K sand pay section equivalent to the 25m pay interval that flowed gas from the E1 sand in the Pg-5 well Pg-5 well Produced c.4 Bcf with an initial rate of Pg-11
Slide 10: Pg-11,11A Results on Seismic
Pg-11,11A Results on Seismic Pg-11A well Pg-11 & Pg-11A Middle Miocene Independent RPS W 400+ Bcf in place E 1.5 Sec Top A sand Lower Miocene Undefined pre- Top D sand Unconformity Reserve potential ??? Top E sand Mapped spill point at top 2 ‘K’ Sand Sec Top K sand Middle / Lower Miocene Potential t
Slide 11: Forward Plan
Forward Plan Drilling, detailed engineering & assessment work in progress Work Programme • Preparation of a new Appraisal & Development plan incorporating results from the Middle and Lower Miocene pay defined by Pg-11A & Pg-10 wells. • Both wells will be fracture stimulated before production testing
Slide 12: Fracture stimulation design
Fracture stimulation design • Xf = 135 m (propped length) • FCD = 10 (@90% damage) • Average prop. Conc. = 0.7 lb/ft2 • Payzone coverage = 100 % • 74 tonnes in formation • Perforations: – Assuming 21 open holes, Ø 0.5 in ‐> total open area: 26.6 cm2 Production Forecast
Slide 13: European Gas Opportunity
European Gas Opportunity European oil and gas exploration and production EU27 Import Dependency to 2030 The Opportunity 80% • Leveraging strong European gas prices 70% • Geographically spread portfolio across on-shore Europe - 71% 74% 68% operating in stable fiscal and legislative regimes 60% 60% •
Slide 14: Slovenian Gas Pricing
Slovenian Gas Pricing One of the highest gas price environments in Europe Source: eurogas 14
Slide 15: Switzerland
Switzerland Low risk, high upside participation • Substantial resources with low risk participation: • Hermrigen & Linden estimated at over 360 Bcf, both undeveloped discoveries Hermrigen SEELAND- Field FRIENISBERG made by Elf Aquitane & Amoco in PERMIT 1972/1982 • FinnCap risked NAV of 1.4p per sha
Slide 16: Italy
Italy Onshore Italy in highly prospective regions • Four key assets, all with low cost, high upside potential Bastiglia & Cento Licences • Key focus in 2011/12 on Ripi Fiume, Frosinone Development & Frosinone Exploration: & Strangolagalli Licences Strangolagalli Licence • Redevelopment in proven Rip
Slide 17: Netherlands
Netherlands Shallow off-shore southern north sea. M10 & M11 Licences • Large 135 Bcf appraisal project in two blocks, M10/M11 • 3 Gas Discovery wells drilled in 1985 and 1992 by Nederlandse Aardolie Maatschappik (NAM) • Application made for licence extension formal reply from authorities pending 17
Slide 18: Shareholder value creation
Shareholder value creation • finnCap project risked NAV of core projects of 25.5p 30 offering significant near term upside Project risked value per share Petisovci – SLO/HU 23.3p 25 Ripi - Latina Valley 0.8p Hermrigen – Switzerland 1.4p Share Price (pence) 20 • Prudently managed to maximise sharehol
Slide 19: Ascent is well funded
Ascent is well funded • Recent £17m fund raising in March 2011 • Designed to cover a three well programme • Two redevelopment wells in Petišovci, Slovenia • One exploration/appraisal well on other side of the border in Ujfalu, Hungary • With our current thinking around simple vertical fracs in the n
Slide 20: Current detailed work programme
Current detailed work programme Significant newsflow in 2011 & 2012 20
Slide 21: Commerciality report
Commerciality report Confirmation of substantial potential • PDC undertook a commerciality review of the Petišovci Gas Field Assumptions: Modelled four scenarios • Case 1: 3 K-sand wells and no further field development • Case 2: 15 K-sand wells only • Case 3: 15 K-sand wells, subsequent E1 and D2 r
Slide 22: Petišovci production profiles
Petišovci production profiles
Slide 23: Economic Summary
Economic Summary Strong projected returns for shareholder • Each scenario modelled by PDC offers a strong rate of return for shareholders, with Cases 2, 3 and 4 offering very high shareholder value creation: • Fracture stimulation work being carried out on Pg-11A and Pg-10 later this and next month
Slide 24: Plenty of future optionality
Plenty of future optionality Optimising our field development plan Project Free Cashflow Financing/Debt Equity Farm-out 24
Slide 25: Summary and Conclusion
Summary and Conclusion • Exciting results with data from Pg-11A and Pg-10 increasing our confidence of commercial exploitation of the Petišovci asset. • Resources appears to be substantially bigger than first thought. • Aggressive exploitation and development programmes planned for 2012, commerciali