Eldorado Gold Corporation · TSX:ELD

Eldorado Gold — 2010 Whistler Institutional Investor Conference

17 slides from Eldorado Gold's conference presentation, Jan 20, 2010

  1. Slide 1: Eldorado Gold Corporation

    Eld r d Gold Eldorado G ld Corporation C r r ti 2010 Whistler Institutional Investor Conference January 20-22 20 22, 2010 www.eldoradogold.com 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. The

  3. Slide 3: Global Presence

    Global Presence www.eldoradogold.com 3

  4. Slide 4: Growing Production

    Growing Production 2009 production of ~ 360,000 oz of gold from 450,000 4 mines 342,820 308 802 308,802 300,000 281,135 Ounces Gold O 135,653 150,000 0 2006 2007 2008 2009 Annual Gold Production www.eldoradogold.com 4

  5. Slide 5: Expanding Margins

    Expanding Margins 1,000 $934 $876 800 $674 $609 600 $613 $587 $279 $411 400 200 $330 $289 $321 $263 0 2006 2007 2008 First 9M 2009 Total Cash Cost Margins Realized Gold Price www.eldoradogold.com 5

  6. Slide 6: Production Forecast

    Production Forecast 2013 production of ~ 1 million oz 2011 of gold from production of 1,200,000 7 mines 800,000 to 850,000 oz of gold from Column 2 1,000,000 6 mines es 2009 ction in Ounce production of Total Gold ~ 360,000 oz Production 800,000 of gold from 4 mines From: 600,000 Kişladağ Gold Produ

  7. Slide 7: Lowest Quartile of Production Cost

    Lowest Quartile of Production Cost www.eldoradogold.com 7

  8. Slide 8: Kişladağ mine

    Kişladağ mine ƒ Kişladağ is an open pit heap leach gold mine that began commercial production in July y 2006 and converted to owner operated p mining in Q3 2008 ƒ Ore production in 2009 was ~ 10 million tonnes at 1.11 g/t with a strip ratio of ~ 1.22 : 1 ƒ Measured and indicated resources Kişladağ m

  9. Slide 9: Jinfeng mine

    Jinfeng mine ƒ Jinfeng in Guizhou province is an open pit and underground gold mine, the second largest g g gold mine in China ƒ It began commercial production in September 2007 ƒ Eldorado owns an 82% interest with local jjoint-venture p partner Guizhou Lannigou g Gold Mine Limited holding the remai

  10. Slide 10: Tanjianshan mine

    Tanjianshan mine ƒ Tanjianshan in Qinghai province is an open pit, float-roast-CIL operation that began commercial p production in February y 2007. It consists of 2 separate deposits: Qinlongtan (QLT) and Jinlonggou (JLG) ƒ Partners in Tanjianshan are Qinghai Number One Geological Brigade (5%) and t

  11. Slide 11: Tanjianshan exploration

    Tanjianshan exploration QLT South RC Drilling Program www.eldoradogold.com 11

  12. Slide 12: White Mountain mine

    White Mountain mine ƒ White Mountain in Jilin province is an underground mine using a sub-level and cut- and-fill stoping p g mining g method ƒ Eldorado owns a 95% interest in White Mountain, with the remainder held by local joint-venture partner Jilin Tonghua Institute of Geology and Minerals Explo

  13. Slide 13: Efemçukuru project

    Efemçukuru project ƒ Efemçukuru is a high grade epithermal gold deposit, suited for underground mechanized mining ƒ Feasibility study completed in 2007 based on a mine throughput of 406,000 tonnes per year ƒ Construction ongoing with commissioning and production planned for late 2010 ƒ Operating and

  14. Slide 14: Eastern Dragon project

    Eastern Dragon project ƒ Eastern Dragon is a high-grade, low- sulphidation, epithermal, gold-silver vein deposit ƒ Eldorado has a 95% equity interest in the Lode 5 Exploration Licence. Eldorado also holds a 90% contractual interest in the surrounding g exploration p p potention ƒ Feasibility study w

  15. Slide 15: Perama Hill project

    Perama Hill project ƒ Perama Hill is a shallow, low sulphidation, non-refractory oxide gold deposit with a low strip p ratio in northern Greece ƒ Pre-Environmental Impact Assessment (PEIA) has been submitted in October 2009 ƒ Environmental Impact Assessment (EIA) to be submitted Q2 2010 for reviews

  16. Slide 16: Strategy

    Strategy ƒ Long life, low cost assets ƒ Lowest quartile of production cost ƒ Strong balance sheet ƒ No hedge positions ƒ Regional exploration with excellent development projects for internal growth ƒ Explore, develop and operate to high standards www.eldoradogold.com 16

  17. Slide 17: Thank you

    Thank you Eldorado Gold Corporation TSX: ELD NYSE: EGO ASX: EAU Shares Outstanding (as of December 15, 2009): 537.1 M Investor Relations: Nancy Woo (604) 601-6650 nancyw@eldoradogold com nancyw@eldoradogold.com www.eldoradogold.com 17

Eldorado Gold — 2010 Whistler Institutional Investor Conference on 6ix