Wesdome Gold Mines Ltd. · TSX:WDO

Wesdome Gold Mines — Investor Presentation (January 2018)

49 slides from Wesdome Gold Mines's investor presentation, January 2018

  1. Slide 1: A Solid Foundation for a Promising Future

    January 2018 A Solid Foundation for a Promising Future

  2. Slide 2: Cautionary Statements

    Cautionary Statements Forward-Looking Information This presentation contains statements or information concerning the business, operations and financial performance and condition of Wesdome Gold Mines Ltd. (“Wesdome” or the “Company”) which constitute forward-looking statements or information (colle

  3. Slide 3: Wesdome Gold Mines Ltd.

    Wesdome Gold Mines Ltd. Proven building blocks to New high-grade gold increase shareholder value discovery in permitted, de-watered former producing mine Low risk expansion of existing mines in proven mining camps Assets in top rated jurisdictions – Ontario and Quebec TSX:WDO | 3

  4. Slide 4: Corporate Structure

    Corporate Structure Symbol 52 Week High/Low Analyst Coverage TSX:WDO $4.40/$1.64 (Average daily Clarus Securities volume 900,000 shares) Desjardins Capital Markets Shares Outstanding Echelon Wealth Partners 133.9 M Market Capitalization Eight Capital Partners $281M Options Industrial Alliance ($2.10

  5. Slide 5: Two Year Share Price Performance

    Two Year Share Price Performance GDXJ methodology change WDO added to GDXJ (18 M shares) announced, rebalance results in 12 M shares liquidated from index Eagle River 303 E Lens discovery announced; Kiena Resolute Funds reduces Deep potential expands position from 20% to 550 m laterally announced 9.

  6. Slide 6: Canadian Gold Company with Three 100% Owned Projects

    Canadian Gold Company with Three 100% Owned Projects • 30 years of continuous gold production • 2017 9-month operating cash flow $15 M • 2017 Eagle River Complex production: 58,980 ozs from 2 high grade mines 1 • 2017 Eagle River head grades 10.6 g/t (2016: 7.8 1 2 g/t) • Reserve and resource update

  7. Slide 7: Corporate Strategy

    Corporate Strategy Near Term: Long Term: Objective: STRENGTHEN EXPLORE DEVELOP Eagle River • 7 and 300 zones remain open Become a • Near mine diversified exploration ongoing producer with Eagle River Kiena exciting organic • Development of • Kiena deep discovery production growth high grade zones Au

  8. Slide 8: Operating Two of Canada's High Grade Gold Mines

    Operating Two of Canada’s High Grade Gold Mines Eagle River Underground Ranks 2nd Mishi Open Pit Ranks 3rd 6 5 Reserve Grade (g/t) Reserve Grade (g/t) 4 3 2.0 2 1 0 Meliadine Meadowbank Mishi Canadian Malartic Detour Lake Rainy River Young-Davidson Source: National Bank Financial TSX:WDO | 8

  9. Slide 9: 2017 Gold Production Guidance Exceeded

    2017 Gold Production Guidance Exceeded Q1 2017 Q2 2017 Q3 2017 Q4 2017 Guidance 2017 Gold Produced 15,162 12,529 15,493 15,797 58,980 52,000 – (ounces) 58,000 Cash cost per 1,099 1,237 982 1,021* 1,078* 1,030 – ounce sold 1,130 (CAD$/ounce) AISC per ounce 1,446 1,718 1,446 1,322* 1,519* 1,450 – (CAD

  10. Slide 10: Gold Production Improvements 2017 vs 2016

    Gold Production Improvements 2017 vs 2016 Amounts are denominated in Canadian dollars Q1 Q2 Q3 Q4 Full Year 2017 2016 2017 2016 2017 2016 2017 2016 2017 2016 Ore milled (tonnes) Eagle River 38,578 39,839 34,960 45,305 44,421 42,617 39,291 42,607 157,250 170,369 Mishi 36,641 36,287 39,117 34,006 38,6

  11. Slide 11: 2018 Guidance – Production Up 10%

    2018 Guidance – Production Up 10% Amounts are denominated in Canadian Guidance dollars Gold production Eagle River 55,000 – 59,000 ounces Mishi 7,000 - 9,000 ounces 62,000 – 68,000 ounces Head grade (g/t) Eagle River 10.1 – 10.5 Mishi 2.4 – 2.8 Operating cost per ounce 1 $950 - $1,025 US$750-US$800

  12. Slide 12: Eagle River Mine: 1.1 M oz of Production

    Eagle River Mine: 1.1 M oz of Production • Quartz diorite stock (2 km x 0.5 km) hosts 1.1 M oz of past production at Eagle River from 8, 6 and 2 Zone structures (1995 to 2017) • Parallel 7 and 300 Zones to north offer new potential throughout the mine • 2017 Production January - September: 37,500 ou

  13. Slide 13: Eagle River Parallel Gold Zones Remain Open

    Eagle River Parallel Gold Zones Remain Open open open 4200 elev 4200 elev open Section 9400E (looking west) Section 9400E (looking west) 100 m open • Discovery of two new parallel gold zones in 2013 • Exploration in 2014 - 2017 leads to reserve growth with expanding potential within mine footprint •

  14. Slide 14: Eagle Drilling to Diversify Production Locations

    Eagle Drilling to Diversify Production Locations Longitudinal Section Looking North 300 Zone West Eu-778: 121.3 g/t over 2.0 m CL EU-779: 1115.7 g/t over 2.4 m CL EU-780L 79.1 g/t over 3.5 m CL EU-781: 65.2 g/t over 4.0 m CL EU-782: 230.2 g/t over 2.5 m CL 300 Zone East – North Lens (New) 670-125: 8

  15. Slide 15: 2017 Drilling 303 E Lens Returns Wide, High Grade Intersections

    2017 Drilling 303 E Lens Returns Wide, High Grade Intersections Highlights January 26, 2017 • Hole 844-E-26: 7.08 gAu/t uncut (5.86 gAu/t cut) over 8.88 m true width • Hole 844-E-27: 28.72 gAu/t uncut (19.03 gAu/t cut) over 20.67 m true width • Hole 844-E-28: 20.75 gAu/t uncut (13.36 gAu/t cut) over

  16. Slide 16: 2017 Drifting and Production Planning 300 Lens

    2017 Drifting and Production Planning 300 Lens 173.7m of strike length / 2.85m average width / 22.62 g/t Au cut / 34.70 g/t Au uncut TSX:WDO | 16

  17. Slide 17: 303 E Lens Extended Up-Plunge

    303 E Lens Extended Up-Plunge TSX:WDO | 17

  18. Slide 18: 2017 7 Zone Drifting Results – Strike Increasing with Depth

    2017 7 Zone Drifting Results – Strike Increasing with Depth Drill Highlights – 2017 • 7 Zone adjacent to existing mine infrastructure • Zone remains open to depth and to surface • On strike potential of over 100 metres • 975 m level: Combined 20.66 g/t Au uncut (19.23 g/t Au Cut) over an average wid

  19. Slide 19: 2017 Mishi Exploration: Drilling Extends Zone to West

    2017 Mishi Exploration: Drilling Extends Zone to West Exploration Highlights • 2016 reconnaissance drilling program • 2017 Exploration: 28,000 m of drilling following up on two targets, 600 m and 1700 m West of pit - resource delineation 600 m West of Pit 1,700 m West of Pit 1.95 g/t over 29.8 m TW

  20. Slide 20: Kiena Complex, Val d'Or, Quebec

    Kiena Complex, Val d’Or, Quebec • Mine on care and maintenance since mid- 2013 • 2,000 TPD permitted mill • 930 Metre shaft • Ramp system to 1000 m • Underground de-watered • Past production 1981 – 2013 12,500,00 mt @ 4.5 g/t = 1.75 M ounces produced TSX:WDO | 20

  21. Slide 21: Kiena Complex Property Ramp

    Kiena Complex Property Ramp TSX:WDO | 21

  22. Slide 22: Kiena Complex – Regional Potential

    Kiena Complex – Regional Potential Wesdome Deposit 0.4 M oz Resource Siscoe Mine 0.9 M oz prod Presqu’ile Deposit 0.1 M oz Resource Kiena Deep Kiena Mine 1.8 M oz TSX:WDO | 22

  23. Slide 23: Kiena Deep Discovery and Geology

    Kiena Deep Discovery and Geology Why Kiena Deep: • Large Regional Upper Quartz Zone Structures • Multiple zones of ductile and brittle deformation Kiena Deep A Zone for “openings” for Au • Ultramafic contact tends 500m to “pool” liquids Kiena Deep B Zone TSX:WDO | 23

  24. Slide 24: Kiena Exploration Ramp and Current Drill Targets

    Kiena Exploration Ramp and Current Drill Targets • Kiena Ramp Construction announced May 3, 2017 • Estimated cost $7.6 M and completion Q1 2018 • 500 metres of ramping and additional 500 metres of exploration drifting • Drilling underway: 25 x 25 metre spacing Kiena • 40,000 metres Deep • Goal to es

  25. Slide 25: New Discovery Located Near Existing Infrastructure

    New Discovery Located Near Existing Infrastructure Existing Indicated Resources Zone Cut Grade Tonnes Ounces (cut to 34.28 g/t) S50 Deep A 10.87 173,111 60,511 S50 Deep AH 8.53 68,722 18,885 S50 Deep B 3.21 514,100 53,100 TOTAL 132,466 OUNCES TSX:WDO | 25

  26. Slide 26: VC Zone – Near-Term Production Potential

    VC Zone – Near-Term Production Potential Highlights include: •262.13 g/t or (17.70 g/t cut to 34.28 g/t) over 5.6 m true width in hole 6205 •10.28 g/t or (8.56 g/t cut to 34.28 g/t) over 3.0 m true width in hole 6201 •9.26 g/t (9.26 g/t cut) over 3.0 m true width in hole 6208 VC Zones – Important As

  27. Slide 27: VC Zone North Extension

    VC Zone North Extension TSX:WDO | 27

  28. Slide 28: S50 South Zone Extension

    S50 South Zone Extension TSX:WDO | 28

  29. Slide 29: Kiena Deep and S50 Extension

    Kiena Deep and S50 Extension TSX:WDO | 29

  30. Slide 30: Moss Lake - Coldstream Acquisition April 2016

    Moss Lake - Coldstream Acquisition April 2016 • Dominant land holdings, 36 km along Shebandowan Gold Belt containing four deposits open for expansion • Moss Lake Deposit remains open Pit and Mineral Resource constrained by property boundary • 2017 drilling extends strike length mineralization from 2

  31. Slide 31: 2018 Exploration Summary

    2018 Exploration Summary Eagle: Kiena: 3 - 4 Underground $10.8 M Exploration 3 Underground Drills 1 Surface Drill (Summer) Drilling Budget 1 Surface Drill (Summer) Property 2018 Metres 2017 Metres 2016 Metres 2015 Metres Eagle Underground Exploration 25,000 24,000 27,000 22,000 Drilling Eagle River

  32. Slide 32: Summary

    Summary Kiena: Eagle River: New gold discovery in Low risk expansion of Discovering new high- existing, permitted, de- existing mines in proven grade parallel zones close watered former producing mining camp to infrastructure mine Aggressive Exploration Pipeline of development Operations in safe Pro

  33. Slide 33: Appendix

    Appendix TSX:WDO WESDOME wesdome.co m

  34. Slide 34: Executive Management Team

    Executive Management Team - Professional engineer with over 25 years experience in operational management, mine rehabilitation, development and gold production Duncan Middlemiss, P. Eng - Over 10 years of executive management experience Chief Executive Officer - Most recently Chief Executive Officer

  35. Slide 35: Board of Directors

    Board of Directors - Over 40 years experience in the mineral exploration and mining industry Charles Page, P.Geo - Most recently President and CEO of Queenston Mining, leading the discovery and Chairman development of the Upper Beaver deposit in the Kirkland Lake gold camp, until its acquisition by

  36. Slide 36: Q3 2017 Operating Results

    Q3 2017 Operating Results Operational Results – Three and Nine Months 2017 and 2016 Three Months ended September 30 Nine Months ended September 30 2017 2016 2017 2016 Eagle tonnes milled 44,421 42,617 117,959 127,761 Mishi tonnes milled 38,638 37,660 114,396 107,953 Total tonnes milled 83,058 80,277

  37. Slide 37: Notes to Technical Disclosure

    Notes to Technical Disclosure Technical Disclosure Mineral Resources This presentation contains information regarding mineral resources estimated at the Company’s projects. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Further, the quantity and grade of

  38. Slide 38: S-50 Zone Isometric View North

    S-50 Zone Isometric View North S-50 Zone - Conceptual Isometric 3D View • S-50 Zone depleted portion (red wireframe) •Majority of Kiena’s production (10M tons or 1.6 M oz Au) was mined from the S-50 zone where widths range from ~15 to 50 metres wide •Thicker gold mineralized breccia zones interprete

  39. Slide 39: Drilling Expands Kiena Deep Potential to 550 m Laterally

    Drilling Expands Kiena Deep Potential to 550 m Laterally Feb 8 step out hole: 6.63 g/t over 11 m uncut (6.63 m cut) Feb 8 step out hole: 7.67 g/t over 8.2 m uncut (5.53 m cut) TSX:WDO | 39

  40. Slide 40: Kiena Deep Drilling Constrained

    Kiena Deep Drilling Constrained TSX:WDO | 40

  41. Slide 41: Mishi Operations: Strike and Depth Potential

    Mishi Operations: Strike and Depth Potential M6 Zone open West Extension MISHI MINE Current Operations M2 Zone open M2 Zone East Extension Plan View Section 3550 E Section 3750 E Section 3550 E (looking W) Section 3750 E (looking W) TSX:WDO | 41

  42. Slide 42: Mineral Reserves (2016 Year End)

    Mineral Reserves (2016 Year End) 15% increase at Eagle River net of depletion Category Tonnes Grade (gAu/Tonne) Contained Ounces Eagle River Underground Reserves Proven 208,000 10.2 68,000 Probable 949,000 9.0 276,000 Eagle Proven + Probable 1,157,000 9.2 344,000 Mishi Open Pit Reserves Proven 259,0

  43. Slide 43: Eagle River Parallel Structure Reserve Breakdown

    Eagle River Parallel Structure Reserve Breakdown Percentage of P + P Structure Tonnage Grade (gAu/tonne) Contained Ounces Reserve Ounces Proven and Probable Reserves No. 8 255,000 10.6 87,000 25% No. 300 456,000 9.0 132,000 38% No. 7 310,000 9.2 91,000 27% Other 136,000 7.8 34,000 10% Total 1,157,00

  44. Slide 44: Mineral Resources (2016 Year End) Operating Assets

    Mineral Resources (2016 Year End) Operating Assets Category Tonnes Grade (gAu/Tonne) Contained Ounces Eagle River Underground Resources Inferred 327,000 8.1 85,000 Mishi Open Pit Resources Indicated 3,679,000 2.1 248,000 Inferred 764,000 2.4 59,000 Mishi Underground Resources Indicated 567,000 4.5 8

  45. Slide 45: Mineral Resources (2016 Year End) Development & Exploration Assets

    Mineral Resources (2016 Year End) Development & Exploration Assets Category Tonnes Grade (gAu/Tonne) Contained Ounces Kiena Complex Resources Measured 63,700 4.06 8,300 Indicated 2,439,800 5.62 441,000 Total M + I Resources 2,500,600 5.59 449,300 Total Inferred Resources 1,563,300 7.97 400,400 Moss

  46. Slide 46: Moss Lake Project Optionality

    Moss Lake Project Optionality Original Property Moss Lake Stock Boundary open Moss Lake Deposit Central Intermediate to Felsic 1.4 M oz (Indicated @ 1.1 g/t) Metavolcanic Belt 1.7 M oz (Inferred @ 1.1 g/t) Head Lake Stock Shebandowan Greenstone Belt • Moss Lake Deposit remains open • Pit and Mineral

  47. Slide 47: 2013 Moss Lake – PEA (2.5 M oz. study)

    2013 Moss Lake – PEA (2.5 M oz. study) open NE SW NE open 300 m 2.5 km SW General View of Mineralized Zones Longitudinal and Plan View of Moss Lake Pit Highlights • Open pit mine and CIL Processing at 40,000 tpd • Pre-production Capital: $543 M CDN • Life of mine strip ratio of 2.5 : 1 • Operating c

  48. Slide 48: Eagle River/Mishi Complex Central Ontario

    Eagle River/Mishi Complex Central Ontario • Located in Hemlo/Wawa Gold Camp • Celebrating 20 years of production • 1,000,000+ oz @ 9.1 g/t Au • Current operations ~800 tpd Mill located adjacent to Mishi open pit deposit (permitted to 1,200 tpd) • Eagle River underground mine located 15 kms to south

  49. Slide 49: Kiena Complex Drill Core August 2016

    Kiena Complex Drill Core August 2016 TSX:WDO | 49

Wesdome Gold Mines — Investor Presentation (January 2018) on 6ix