  1. Slide 1: Briefing on the Financial Results for Q2 of FY2026

    Slide 1: Briefing on the Financial Results for Q2 of FY2026

    Briefing on the Financial Results for Q2 of FY2026 (the Six Months Ended September 30, 2026) November 17, 2026 Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved

  2. Slide 2: Table of Contents

    Slide 2: Table of Contents

    Table of Contents 1 Company Overview 2 Financial Results Overview Q2 of FY2026 (Consolidated) 3 Financial Results Forecast FY2026 (Consolidated) 4 Efforts under NIPPON DENSETSU Three-year Management Plan 2024 5 Policy on Efforts for the Next Medium-Term Management Plan 6 Implementing Management That

  3. Slide 3: Company Overview

    Slide 3: Company Overview

    1 Company Overview Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 2

  4. Slide 4: Company Overview

    Slide 4: Company Overview

    1 Company Overview Covers a wide range of construction, including Leading company in the field of construction of electrical facilities for buildings construction of electrified railway (Buildings), construction of information and Nationwide business operations equipment (Railways) communication sys

  5. Slide 5: Financial Results Overview (Consolidated)

    Slide 5: Financial Results Overview (Consolidated)

    Financial Results Overview Q2 of FY2026 2 (Consolidated) Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 4

  6. Slide 6: Key Points in the Financial Results

    Slide 6: Key Points in the Financial Results

    2 Financial Results Overview Q2 of FY2026 (Consolidated) Key Points in the Financial Results ⚫ Orders increased significantly year on year, driven by orders for data centers, large-scale redevelopment projects around stations, and other projects. ⚫ Net sales also increased owing to steady progress i

  7. Slide 7: Orders, Net Sales, Operating Profit, Backlog

    Slide 7: Orders, Net Sales, Operating Profit, Backlog

    2 Financial Results Overview Q2 of FY2026 (Consolidated) (Unit: million yen) Orders Compared to Q2 of FY2025: +¥46.2 bn Net sales Compared to Q2 of FY2025: +¥11.6 bn 180,000 100,000 90,067 142,673 75,625 78,419 71,039 120,000 60,889 93,678 96,473 88,637 68,644 50,000 60,000 0 0 Q2 of FY2022 Q2 of FY

  8. Slide 8: Factors for Changes in Operating Profit

    Slide 8: Factors for Changes in Operating Profit

    2 Financial Results Overview Q2 of FY2026 (Consolidated) (Unit: million yen) Factors for Changes in Operating Profit (Year on year) Improvement in construction profitability Increase in personnel expenses New building relocation expenses Increase in other costs ▲720 ▲408 7,480 ▲489 Increase in compl

  9. Slide 9: Trends in Quarterly Financial Results

    Slide 9: Trends in Quarterly Financial Results

    2 Financial Results Overview Q2 of FY2026 (Consolidated) Net sales (Unit: million yen) Trends in Quarterly Financial Results Operating profit (Net sales) (Operating profit) 250,000 242,310 30,000 229,207 216,922 26,000 200,000 194,031 23,890 23,560 22,000 172,100 17,934 18,000 150,000 135,291 125,01

  10. Slide 10: Summary by Business Segment

    Slide 10: Summary by Business Segment

    2 Financial Results Overview Q2 of FY2026 (Consolidated) Summary by Business Segment Construction of Electrified Railway Equipment Construction of Electrical Facilities for Buildings ⚫ Although orders from private railway ⚫ Orders increased significantly year on year, companies were strong, orders f

  11. Slide 11: Summary by Business Segment

    Slide 11: Summary by Business Segment

    2 Financial Results Overview Q2 of FY2026 (Consolidated) Summary by Business Segment Construction of Information and Construction for Environmental Energy Communication Systems ⚫ Orders for railway communication construction ⚫ Orders increased year on year, as orders remained strong, increasing year

  12. Slide 12: Electrified Railway Equipment Segment Results

    Slide 12: Electrified Railway Equipment Segment Results

    Financial Results for 2 Construction of Electrified Railway Equipment Segment (Unit: million yen) Orders Compared to Q2 of FY2025: +¥0.03bn Net sales Compared to Q2 of FY2025: +¥4.9bn 60,000 52,630 52,661 60,000 49,326 45,764 44,134 44,370 41,024 39,768 37,659 40,000 34,282 40,000 20,000 20,000 0 0

  13. Slide 13: Railway Segment Orders and Net Sales (Disaggregated)

    Slide 13: Railway Segment Orders and Net Sales (Disaggregated)

    Financial Results for 2 Construction of Electrified Railway Equipment Segment Orders and Net Sales (Disaggregated) (Unit: billion yen) 2Q of 2Q of FY2023 FY2024 FY2025 FY2023 FY2024 FY2025 FY2026 FY2026 Public railway JR East 25.3 24.4 29.8 companies 1.0 0.4 1.7 Orders 26.2 JRTT Orders 1.4 62.2 64.6

  14. Slide 14: Electrical Facilities for Buildings Segment Results

    Slide 14: Electrical Facilities for Buildings Segment Results

    Financial Results for 2 Construction of Electrical Facilities for Buildings Segment (Unit: million yen) Orders Compared to Q2 of FY2025 +¥42.4bn Net sales Compared to Q2 of FY2025 +¥4.7bn 100,000 30,000 25,076 23,391 80,000 71,408 20,310 20,000 16,495 60,000 13,486 40,000 28,351 28,939 27,195 10,000

  15. Slide 15: Orders by Facility Type

    Slide 15: Orders by Facility Type

    Financial Results for 2 Construction of Electrical Facilities for Buildings Segment Orders by facility type (non-consolidated) (Unit: million yen) FY2022 FY2023 FY2024 FY2025 FY2026 2Q Facility type Orders Share Orders Share Orders Share Orders Share Orders Share Data centers 1,962 3.7% 980 1.7% 998

  16. Slide 16: Information and Communication Systems Segment Results

    Slide 16: Information and Communication Systems Segment Results

    Financial Results for Construction of 2 Information and Communication Systems Segment (Unit: million yen) Orders Compared to Q2 of FY2025: +¥2.5bn Net sales Compared to Q2 of FY2025: +¥1.1bn 20,000 12,000 16,879 10,479 9,323 14,211 8,425 8,791 8,499 11,679 11,699 10,685 10,000 6,000 0 0 Q2 of FY2022

  17. Slide 17: Environmental Energy Segment Results

    Slide 17: Environmental Energy Segment Results

    Financial Results for 2 Construction for Environmental Energy Segment (Unit: million yen) Orders Compared to Q2 of FY2025: +¥ 0.3 bn Net sales Compared to Q2 of FY2025: -¥0.04 bn 4,000 4,000 3,462 3,000 2,190 1,991 1,951 2,000 1,607 2,000 1,735 1,240 914 1,000 0 0 Q2 of FY2023 Q2 of FY2024 Q2 of FY2

  18. Slide 18: Associated Business Segment Results

    Slide 18: Associated Business Segment Results

    Financial Results for * Associated Business includes real estate business, total building management, 2 maintenance and inspection of electrical facilities, sale of materials, software development, and design of electrical facilities. Associated Business Segment Figures for real estate leasing, mana

  19. Slide 19: Major Railway-Related Construction Projects

    Slide 19: Major Railway-Related Construction Projects

    2 Major Railway-Related Construction Projects FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 Name of the construction Haneda Airport Access Lines Works to relocate obstructions/Work to install New Electrical Scheduled to start operation in (East Yamanote Route and New Access Lines) Facilities for Substat

  20. Slide 20: Major Orders Received (First Half of FY2026)

    Slide 20: Major Orders Received (First Half of FY2026)

    2 Major Orders Received (First Half of FY2026) Name of the construction FY2025 FY2026 FY2027 Repair of Railway Tracks in Funabashi Station Yard and Two Other Locations Scheduled for JR East on the Sobu Main Line completion in FY2029 Relocation of Obstructing Signal Equipment and Other Works for Sche

  21. Slide 21: Financial Results Forecast FY2026 (Consolidated)

    Slide 21: Financial Results Forecast FY2026 (Consolidated)

    3 Financial Results Forecast FY2026 (Consolidated) Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 20

  22. Slide 22: Key Points in the Financial Results Forecast

    Slide 22: Key Points in the Financial Results Forecast

    3 Financial Results Forecast FY2026 (Consolidated) Key Points in the Financial Results Forecast ⚫ The financial results forecast remains unchanged, as the future outlook is highly uncertain at this point. ➢ Projects are growing larger, and it is necessary to carefully assess factors such as construc

  23. Slide 23: Financial Results Forecast FY2026 (Consolidated)

    Slide 23: Financial Results Forecast FY2026 (Consolidated)

    3 Financial Results Forecast FY2026 (Consolidated) (Unit: million yen) Backlog Compared to FY2025: +¥41.1bn Orders Compared to FY2025: -¥13.5bn 250,000 224,253 300,000 267,369 253,860 183,075 223,718 200,000 173,719 208,036 156,811 200,000 150,000 142,673 100,000 88,637 93,678 96,473 100,000 50,000

  24. Slide 24: Forecast: Electrified Railway Equipment Segment

    Slide 24: Forecast: Electrified Railway Equipment Segment

    Financial Results Forecast for 3 Construction of Electrified Railway Equipment Segment (Unit: million yen) Backlog Compared to FY2025: +¥16.8bn Orders Compared to FY2025: -¥10.9bn 150,000 150,000 137,016 120,114 126,030 115,832 102,603 100,000 82,760 85,714 100,000 75,638 52,630 52,661 45,764 44,134

  25. Slide 25: Forecast: Electrical Facilities for Buildings Segment

    Slide 25: Forecast: Electrical Facilities for Buildings Segment

    Financial Results Forecast for 3 Construction of Electrical Facilities for Buildings Segment (Unit: million yen) Backlog Compared to FY2025: +¥24.6bn Orders Compared to FY2025: -¥2.7bn 120,000 120,000 93,231 89,219 86,490 80,000 69,818 68,534 80,000 63,467 59,247 58,808 71,408 40,000 40,000 28,351 2

  26. Slide 26: Forecast: Information and Communication Systems Segment

    Slide 26: Forecast: Information and Communication Systems Segment

    Financial Results Forecast for Construction of Information 3 and Communication Systems Segment (Unit: million yen) Backlog Compared to FY2025: +¥0.7bn Orders Compared to FY2025: +¥0.1bn 40,000 40,000 33,885 31,915 32,100 26,697 22,396 23,162 20,000 17,263 16,666 20,000 16,879 14,211 11,679 11,699 0

  27. Slide 27: Forecast: Environmental Energy Segment

    Slide 27: Forecast: Environmental Energy Segment

    Financial Results Forecast for 3 Construction for Environmental Energy Segment (Unit: million yen) Backlog Compared to FY2025: -¥1.7bn Orders Compared to FY2025: +¥1.2bn 6,000 8,000 6,771 4,539 6,000 5,410 4,000 3,146 4,184 2,761 3,462 4,000 2,983 2,000 1,607 2,000 1,240 914 0 0 FY2024 FY2025 FY2026

  28. Slide 28: Forecast: Associated Business Segment

    Slide 28: Forecast: Associated Business Segment

    Financial Results Forecast for 3 Associated Business Segment (Unit: million yen) Backlog Compared to FY2025: +¥0.6bn Orders Compared to FY2025: -¥1.2bn 3,000 8,000 2,493 1,890 6,000 5,033 2,000 4,137 3,830 1,327 4,000 3,274 2,785 1,000 1,927 2,006 1,962 443 2,000 0 0 FY2023 FY2024 FY2025 FY2026 FY20

  29. Slide 29: Efforts under Three-year Management Plan 2024

    Slide 29: Efforts under Three-year Management Plan 2024

    Efforts under 4 NIPPON DENSETSU Three-year Management Plan 2024 Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 28

  30. Slide 30: Direction toward Sustainable Growth

    Slide 30: Direction toward Sustainable Growth

    4 Direction toward Sustainable Growth Major Strengthening New railway station-front Infrastructure track projects redevelopment Railways Increase in Increase in demand for data demand centers and related to the semiconductors environment I&C Increase Buildings Securing and systems in developing corp

  31. Slide 31: NDK Vision90

    Slide 31: NDK Vision90

    4 NDK Vision90 Vision for FY2031 (the 90th Term) With pride and responsibility as a leading company in the field of construction of electrified railway equipment, we aim to become a comprehensive infrastructure facilities construction company NDK Vision90 by expanding our business in construction se

  32. Slide 32: Business Strategies

    Slide 32: Business Strategies

    4 Business Strategies Strengthen the revenue base: Assessment of the current status Increase orders from JR East and other JR companies Progress Issues Expand the business domain: • Completed construction volume in the first half • Need to prepare for the concentration of Strengthen relationships wi

  33. Slide 33: Business Strategies

    Slide 33: Business Strategies

    4 Business Strategies Assessment of the current status Strengthen the revenue base: Progress Issues Increase orders for new and renovated ZEBs, increase orders for construction for energy generation projects • Made progress in efforts to secure orders for grid-scale storage battery stations, includi

  34. Slide 34: Strategies to Solidify the Management Foundation: Human Resources

    Slide 34: Strategies to Solidify the Management Foundation: Human Resources

    4 Strategies to Solidify the Management Foundation Secure Human Resources Targets for FY2031: Increase the number of construction workers by 20% compared to FY2023 Number of construction workers (*) * Construction workers refer to those directly involved in supervising construction works on-site FY2

  35. Slide 35: Strategies to Solidify the Management Foundation: Productivity

    Slide 35: Strategies to Solidify the Management Foundation: Productivity

    4 Strategies to Solidify the Management Foundation Improve Productivity Promotion of DX Efforts in FY2026 Assessment of the current status ⚫ Use of generative AI • Expand operational use of generative Generative AI usage (at least once a • Begin operational use from January 2025 AI (Microsoft Copilo

  36. Slide 36: NIPPON DENSETSU Three-year Management Plans

    Slide 36: NIPPON DENSETSU Three-year Management Plans

    4 NIPPON DENSETSU Three-year Management Plans Expand net sales and secure operating profit To grow sustainably Net sales Three-year management Three-year management Three-year management Three-year management Three-year management Three-year management Operating (billion yen) plan 2009 plan 2012 pla

  37. Slide 37: Policy on Efforts for the Next Medium-Term Management Plan

    Slide 37: Policy on Efforts for the Next Medium-Term Management Plan

    Policy on Efforts for 5 the Next Medium-Term Management Plan Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 36

  38. Slide 38: Policy on Efforts for the Next Medium-Term Management Plan

    Slide 38: Policy on Efforts for the Next Medium-Term Management Plan

    5 Policy on Efforts for the Next Medium-Term Management Plan ⚫ Maintain the unchanging recognition that safety is the top management priority ⚫ Pursue sustainable growth by strengthening the competitiveness of existing businesses and expanding growth areas, leveraging the Group’s strengths and chara

  39. Slide 39: Management Conscious of Cost of Capital and Stock Price

    Slide 39: Management Conscious of Cost of Capital and Stock Price

    Implementing Management That Is Conscious of 6 Cost of Capital and Stock Price Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 38

  40. Slide 40: Efforts toward enhancing capital efficiency

    Slide 40: Efforts toward enhancing capital efficiency

    Implementing Management That Is Conscious of Cost of 6 Capital and Stock Price Efforts toward enhancing capital efficiency Analysis of price book-value ratio (PBR) (x) (x) Price earnings ratio (PER) (%) Return on equity (ROE) Price book-value ratio (PBR) (billion yen) 10.00 1.60 350 20.0 1.40 300 18

  41. Slide 41: Toward further enhancing capital efficiency

    Slide 41: Toward further enhancing capital efficiency

    Implementing Management That Is Conscious of Cost of 6 Capital and Stock Price Toward further enhancing capital efficiency Analysis of return on equity (ROE) (DuPont analysis) (%) Profitability (profit margin) (Times) Efficiency (Asset turnover ratio) (Times) Stability (Financial leverage) 7.88 0.8

  42. Slide 42: Dividend policy

    Slide 42: Dividend policy

    Implementing Management That Is Conscious of Cost of 6 Capital and Stock Price Toward Further Enhancing Capital Efficiency Dividend policy ⚫ From FY2024, we have introduced a dividend payout ratio (aiming for 40%) as a new metric to clarify our commitment to returning profit. ⚫ We expect the total a

  43. Slide 43: Appendix

    Slide 43: Appendix

    Appendix Ⅰ Company Overview Ⅱ Consolidated Financial Results Overview Financial Results Overview and Forecasts for NIPPON DENSETSU Ⅲ KOGYO (Non-consolidated) Ⅳ Financial Results Overview for Total Electric Management Service Copyright(C)2026 NIPPON DENSETSU KOGYO CO.,LTD. All Rights Reserved 42

  44. Slide 44: Company Overview

    Slide 44: Company Overview

    Ⅰ Company Overview NDK Group (consists of 17 subsidiaries and five affiliates) Affiliates are marked with ◯. (As of September 30, 2026) Company name NIPPON DENSETSU KOGYO CO.,LTD. Company name Description of primary businesses Sell electrical equipment and materials, lease, broker, and manage real e

  45. Slide 45: Balance Sheet (Consolidated)

    Slide 45: Balance Sheet (Consolidated)

    Consolidated Financial Results Overview Ⅱ Balance Sheet (Consolidated) (Unit: million yen) As of As of As of As of Account Change Account Mar. 31, 2026 Sep. 30, 2026 Change Mar. 31, 2026 Sep. 30, 2026 Assets Liabilities Current assets 202,513 160,729 -41,784 Current liabilities 87,225 51,375 -35,849

  46. Slide 46: Statement of Income (Consolidated)

    Slide 46: Statement of Income (Consolidated)

    Consolidated Financial Results Overview Ⅱ Statement of Income (Consolidated) (Unit: million yen) Q2 of FY2025 Q2 of FY2026 YoY change Q2 of FY2025 Q2 of FY2026 YoY change Net sales of completed Ordinary profit 3,607 8,527 4,920 construction contracts 78,419 90,067 11,648 (3.7%) (14.9%) (Ordinary pro

  47. Slide 47: Key Management Indicators (Consolidated)

    Slide 47: Key Management Indicators (Consolidated)

    Ⅱ Key Management Indicators (Consolidated) Assets, etc. Capital expenditures / Depreciation / R&D expenses (Unit: million yen) As of As of As of FY2025 Q2 of FY2026 FY2026 Forecast Sep. 30, 2025 Mar. 31, 2026 Sep. 30, 2026 Capital Net assets (million yen) 211,077 230,726 221,965 5,541 2,871 11,343 e

  48. Slide 48: Trends in Net Sales and Operating Profit (Non-consolidated)

    Slide 48: Trends in Net Sales and Operating Profit (Non-consolidated)

    Financial Results Overview for Ⅲ NIPPON DENSETSU KOGYO (Non-consolidated) Trends in Net Sales and Operating Profit (Non-consolidated) Three-year management Three-year management Three-year management Three-year management Three-year management Three-year management plan 2009 plan 2012 plan 2015 plan

  49. Slide 49: Balance Sheet (Non-consolidated)

    Slide 49: Balance Sheet (Non-consolidated)

    Ⅲ Balance Sheet (Non-consolidated) (Unit: million yen) As of As of As of As of Account Change Account Sep. 30, 2026 Change Mar. 31, 2026 Sep. 30, 2026 Mar. 31, 2026 Assets Liabilities Current assets 177,525 139,717 -37,808 Current liabilities 82,104 49,288 -32,815 Cash and deposits 10,231 8,629 -1,6

  50. Slide 50: Statement of Income (Non-consolidated)

    Slide 50: Statement of Income (Non-consolidated)

    Ⅲ Statement of Income (Non-consolidated) (Unit: million yen) Q2 of FY2025 Q2 of FY2026 YoY change Q2 of FY2025 Q2 of FY2026 YoY change Net sales of completed Ordinary profit 8,274 61,243 70,446 9,203 4,168 4,105 construction contracts (4.1%) (15.0%) (Ordinary profit margin) (6.8%) (11.7%) (YoY chang

  51. Slide 51: Key Management Indicators (Non-consolidated)

    Slide 51: Key Management Indicators (Non-consolidated)

    Ⅲ Key Management Indicators (Non-consolidated) Assets, etc. Capital expenditures / Depreciation / R&D expenses (Unit: million yen) As of As of As of Sep. 30, 2025 Mar. 31, 2026 Sep. 30, 2026 FY2025 Q2 of FY2026 FY2026 Forecast Share capital (millions of yen) 8,494 8,494 8,494 Capital 2,782 687 5,852

  52. Slide 52: Operating Results (Non-consolidated)

    Slide 52: Operating Results (Non-consolidated)

    Ⅲ Operating Results (Non-consolidated) (Figures in parentheses are ratios to net sales. Unit: million yen) Q2 of FY2025 Q2 of FY2026 YoY change Net sales 61,243 70,446 9,203 15.0% Cost of sales 54,006 (88.2%) 58,497 (83.0%) 4,491 8.3% Gross profit 7,236 (11.8%) 11,948 (17.0%) 4,711 65.1% Selling, ge

  53. Slide 53: Results by Segment (Non-consolidated)

    Slide 53: Results by Segment (Non-consolidated)

    Ⅲ Financial Results Overview by Segment (Non-consolidated) Construction of Electrified (Figures in parentheses are ratios to net sales. Unit: million yen) Railway Equipment Q2 of FY2025 Q2 of FY2026 YoY change Construction contract backlog carried over 67,164 78,656 11,491 17.1% from previous year O

  54. Slide 54: Results by Segment (Non-consolidated)

    Slide 54: Results by Segment (Non-consolidated)

    Ⅲ Financial Results Overview by Segment (Non-consolidated) Construction of Information (Figures in parentheses are ratios to net sales. Unit: million yen) and Communication Systems Q2 of FY2025 Q2 of FY2026 YoY change Construction contract backlog carried over 20,548 21,489 941 4.6% from previous ye

  55. Slide 55: Results by Segment (Non-consolidated)

    Slide 55: Results by Segment (Non-consolidated)

    Ⅲ Financial Results Overview by Segment (Non-consolidated) Associated business (Figures in parentheses are ratios to net sales. Unit: million yen) Q2 of FY2025 Q2 of FY2026 YoY change Construction contract backlog carried over 1,692 2,259 567 33.5% from previous year Orders 878 960 82 9.4% Net sales

  56. Slide 56: Forecasts for FY2026 (Non-consolidated)

    Slide 56: Forecasts for FY2026 (Non-consolidated)

    Ⅲ Forecasts for FY2026 (Non-consolidated) Business Performance (Figures in parentheses are ratios to net sales. Unit: million yen) FY2025 Results FY2026 Forecast Year on year Construction contract backlog carried over 161,646 197,841 36,195 22.4% from previous year Orders 216,781 207,720 ▲9,061 ▲4.2

  57. Slide 57: Forecasts by Segment (Non-consolidated)

    Slide 57: Forecasts by Segment (Non-consolidated)

    Ⅲ Forecasts by Segment (Non-consolidated) Construction of Electrified (Figures in parentheses are ratios to net sales. Unit: million yen) Railway Equipment FY2025 Results FY2026 Forecast Year on year Construction contract backlog carried over 67,164 78,656 11,491 17.1% from previous year Orders 94,6

  58. Slide 58: Forecasts by Segment (Non-consolidated)

    Slide 58: Forecasts by Segment (Non-consolidated)

    Ⅲ Forecasts by Segment (Non-consolidated) Construction of Information (Figures in parentheses are ratios to net sales. Unit: million yen) and Communication Systems FY2025 Results FY2026 Forecast Year on year Construction contract backlog carried over 20,548 21,489 941 4.6% from previous year Orders

  59. Slide 59: Forecasts by Segment (Non-consolidated)

    Slide 59: Forecasts by Segment (Non-consolidated)

    Ⅲ Forecasts by Segment (Non-consolidated) (Figures in parentheses are ratios to net sales. Unit: million yen) Associated business FY2025 Results FY2026 Forecast Year on year Construction contract backlog carried over 1,692 2,259 567 33.5% from previous year Orders 3,119 1,660 ▲1,459 ▲46.8% Net sales

  60. Slide 60: Financial Results Overview for Total Electric Management Service

    Slide 60: Financial Results Overview for Total Electric Management Service

    Ⅳ Financial Results Overview for Total Electric Management Service (Figures in parentheses are ratios to net sales. Unit: million yen) Q2 of FY2025 Q2 of FY2026 YoY change Net sales 16,471 18,903 2,431 14.8% Cost of sales 13,905 (84.4%) 15,258 (80.7%) 1,352 9.7% Gross profit 2,565 (15.6%) 3,644 (19.

  61. Slide 61: Results by Segment (Total Electric Management Service)

    Slide 61: Results by Segment (Total Electric Management Service)

    Financial Results Overview by Segment Ⅳ (Total Electric Management Service) (Figures in parentheses are ratios to net sales. Unit: million yen) Construction of Electrified Railway Equipment Q2 of FY2025 Q2 of FY2026 YoY change Construction contract backlog carried over 18,550 23,929 5,379 29.0% from

  62. Slide 62: Results by Segment (Total Electric Management Service)

    Slide 62: Results by Segment (Total Electric Management Service)

    Financial Results Overview by Segment Ⅳ (Total Electric Management Service) (Figures in parentheses are ratios to net sales. Unit: million yen) Construction of Information and Communication Systems Q2 of FY2025 Q2 of FY2026 YoY change Construction contract backlog carried over 1,869 1,962 93 4.9% fr

  63. Slide 63: Results by Segment (Total Electric Management Service)

    Slide 63: Results by Segment (Total Electric Management Service)

    Financial Results Overview by Segment Ⅳ (Total Electric Management Service) Associated business (Figures in parentheses are ratios to net sales. Unit: million yen) Q2 of FY2025 Q2 of FY2026 YoY change Construction contract backlog carried over 90 63 ▲27 ▲30.0% from previous year Orders 263 431 167 6

  64. Slide 64: Forecast Note and Inquiries

    Slide 64: Forecast Note and Inquiries

    Please note that the forecast figures presented in this document were prepared based on the information available to the Company at the time they were prepared, and actual results may differ from the forecasts in the document due to fluctuation of the levels of various risks and uncertainties and ch