Mclaren Minerals Limited · ASX:MML

Mclaren Minerals — Investor Presentation (November 2025)

16 slides from Mclaren Minerals's investor presentation, Nov 4, 2025

  1. Slide 1: McLaren Titanium Project Capital Raising Presentation

    For personal use only McLaren Minerals (ASX:MML) McLaren Titanium Project Capital Raising Presentation November 2025

  2. Slide 2: Disclaimer & Important Notices

    Disclaimer & Important Notices DISCLAIMER outside the control of McLaren Minerals. A number of important factors could cause the Company's actual results to differ materially from the plans, objectives, expectations, estimates and intentions expressed in such forward looking statements. Actual resul

  3. Slide 3: Corporate Snapshot – Experienced Board & Management Team

    Corporate Snapshot – Experienced Board & Management Team Michael Arnett Capital Structure For personal use only Chairman Cash (30 September 2025) A$0.3M Mr. Arnett has 20+ years of expertise in the resources industry. He has been Chairperson of NRW Holdings (ASX: NWH), a leading Australian mining an

  4. Slide 4: Offer Overview

    Offer Overview • McLaren Minerals Limited (“McLaren” or the “Company”) is seeking to undertake a fully underwritten non-renounceable entitlement offer, issuing approximately 198.7 million new fully paid ordinary shares in the Company (“New Shares”) to raise approximately $3.6 For personal use only m

  5. Slide 5: Indicative Timetable, Sources & Uses of Funds

    Indicative Timetable, Sources & Uses of Funds (A$m) (subject to Sources of Funds Event Date rounding) For personal use only Offer Proceeds 3.60 Announcement of Offer and Lodgement pf Appendix Cash Balance (30 September 2025) 0.26 Tuesday, 4 November 2025 3B Total 3.86 Lodgement of Prospectus with AS

  6. Slide 6: Mineral Sands Project, WA - Highlights

    McLaren Mineral Sands Project, WA - Highlights Large Heavy Mineral Sands Deposit: • Inferred and Indicated Resource of 280 Mt @ 4.8% Heavy Mineral Resource For personal use only • Topsoil/subsoil <1m then mineralisation - 15 to 35m thickness • Deposit compatible with high tonnage mining strategy, me

  7. Slide 7: Project: Significant Resource Already Defined

    McLaren Project: Significant Resource Already Defined For personal use only 280 Mt @ 4.8% Heavy Mineral Indicated and Inferred JORC Resource (CSA Global), 2% cutoff Key minerals are Ilmenite, with lesser amounts of Rutile, Leucoxene and Zircon Mineralisation from surface - 15 to 35m thickness ▪ Exce

  8. Slide 8: Deposit - Scorecard

    McLaren Deposit - Scorecard Jurisdiction Final Products • Mining Friendly • Specification ✓ For personal use only • Value • Approvals processes ✓ • Saleability✓ • By products ✓ Deposit Characteristics Location and Infrastructure • Size of Resource • Roads and access ✓ • Overburden (less is more) • C

  9. Slide 9: Project: Phase Drilling Outcomes

    McLaren Project: Phase 1 Drilling Outcomes High-grade results – Assays reinforce growth potential north and south of the Indicated Resource boundary, including: For personal use only • 1m @ 24.11% HM in drillhole MAC 061 from 13m (north) • 1m @14.79% HM in drillhole MAC 061 from 12m (north) • 1m @7.

  10. Slide 10: Development Strategy

    McLaren Development Strategy Pre-Feasibility Study: Key Focus Areas: For personal use only Company target* to define a Resource of ▪ Test Work: Slimes test work to 200Mt in the JORC Indicated category, with following characteristics: develop a conceptual management system. ✓ ▪ Simple dozer and trap

  11. Slide 11: Project: PFS Bearing Fruit

    McLaren Project: PFS Bearing Fruit For personal use only Slimes Testwork Implications for Status Complete Project Design • Process plant design complete; • Detailed metallurgical test work program • Confirmation of the desliming circuit • Further test work to confirm completed by IHC Mining and SciD

  12. Slide 12: Fast-Tracking McLaren: Key Milestones to Unlock Titanium Production

    Fast-Tracking McLaren: Key Milestones to Unlock Titanium Production For personal use only EARLY Q4 CY2024 CY2025 CY2025 • Offtake • Drilling at • Metallurgical • Receipt of Completion of PFS • Commence Discussions McLaren and Slimes Test Drilling Assays Studies Bankable • New Heritage • New bulk sam

  13. Slide 13: Ilmenite: A Key Driver in TiO2 Production

    Ilmenite: A Key Driver in TiO2 Production What is Ilmenite? For personal use only Primary Source of TiO2: Ilmenite is a titanium-iron oxide mineral and the main source of titanium dioxide (TiO2), essential for many industrial applications. Key Applications : Global Market Overview: Market Outlook: •

  14. Slide 14: Global mineral sands market: Growth and Price appreciation underway

    Global mineral sands market: Growth and Price appreciation underway Tonnes of Chinese TiO2 Pigment Production Ilmenite Concentrate and TiO2 Pigment Price For personal use only (2016 – 2024 YTD, RMB/t, VAT Incl) 4.50 3,500 28,000 4.00 3,000 24,000 3.50 2,500 20,000 3.00 2,000 16,000 MILLIONS 2.50 1,5

  15. Slide 15: Investment Summary

    Investment Summary Low-Cost Mining Clear Development Path Efficient bulk Dozer Trap PFS on track for Q2 2025, For personal use only mining method ensures with BFS to follow, and strong cost-effective, high-volume potential for early offtake production. agreements. High-Quality Resource Large, high-g

  16. Slide 16: Contact us

    For personal use only Contact us Simon Finnis Registered Office Managing Director C/- Argus Corporate Partners Pty Ltd t: +61 418 695 138 Level 4, 225 St Georges Terrace Perth WA e: simon.finnis@mclarenminerals.com.au 6000 e: team@mclarenminerals.com.au Investor Relations Paul Berson – Corporate Sto

McLaren Minerals — Investor Presentation (November 2025) on 6ix