Angle Energy Inc

Angle Energy — Investor Presentation (April 2013)

47 slides from Angle Energy's investor presentation, April 2013

  1. Slide 1: Corporate Presentation April 2013

    CORPORATE PRESENTATION April 2013 More reach. From every angle. More growth. More value. TSX: NGL

  2. Slide 2: Disclaimer

    DISCLAIMER Certain information set forth in this presentation contains forward-looking statements. By their nature, forward-looking statements are subject to numerous risks & uncertainties, some of which are beyond Angle Energy Inc.’s control, including the impact of general economic conditions, ind

  3. Slide 3: Strategy: Create Value Through Light Oil

    STRATEGY: CREATE VALUE THROUGH LIGHT OIL  The transition to light oil is on track with a 113% increase in _2012 light oil reserves  Reserve additions in 2012 are substantially all from Cardium _projects  Cardium 2P F&D costs: $18.00/boe  Cardium light oil recycle ratio is greater than 2x  Highe

  4. Slide 4: Strategy: Create Value Through Light Oil

    STRATEGY: CREATE VALUE THROUGH LIGHT OIL 3,500 Innovation Harmattan Cardium Development Ferrier Cardium Development = Total Corporate Oil Production (bbl/d) 3,000 Harmattan Cardium Opportunity 2,500 Technology & Delineation 2,000 Ferrier 1,500 Initial Ferrier Angle Drills First HZ Halo Cardium Drill

  5. Slide 5: Angle Energy Profile

    ANGLE ENERGY PROFILE TSX: NGL SHARES OUTSTANDING (BASIC) 81.1 MM INSIDER OWNERSHIP = 8.1% B.C. ALBERTA SASK. MARKET CAP @ $2.77/share $225 MM DEBT (DEC 2012)(1) / BANK LINE $117MM / $215MM Edson $60 MM DEBENTURE @ $12.55 STRIKE EDMONTON H1 2013 AVERAGE PRODUCTION (EST.) Ferrier 11,400 BOE/D (~54% OI

  6. Slide 6: 2013 Guidance

    2013 GUIDANCE H1 2013 Cardium Business Angle Corporate Gross / Net Wells 15.0 / 11.9 20.0 / 16.9 Capital Expenditures $52 – $57 MM $75 ‐ $85 MM Cash Flow $21.5 ‐ $24.5 MM $43 – $49 MM 3,700 – 3,900 boe/d 11,300 – 11,500 boe/d H1 2013 Average Production (69% Oil & Liquids) (54% Oil & Liquids) 4,100 –

  7. Slide 7: Cardium Growth in H1 2013

    CARDIUM GROWTH IN H1 2013 4,000 H1 2013 Production (est.) H1 2013 Average 3,700 ‐ 3900 boe/d 3,700 ‐ 3,900 boe/d 3,500 3,000 Cardium Production (boe/d) 2,500 2,000 1,500 Cardium 1,000 Production 500 boe/d 0 April 2013 l 7

  8. Slide 8: 113% Light Oil Growth: Year End 2012 Reserves

    113% LIGHT OIL GROWTH YEAR END 2012 RESERVES Net Oil Total NPV 10% Undeveloped (MMbbl) (MMboe) (MM$) FDC (MM$) Wells Booked Corporate Reserves Total Proved 5.2 32.7 $358.6 $190.1 53.8 Total 2P 11.1 60.9 $584.3 $379.0 107.1 Cardium Reserves Total Proved 4.5 8.7 $129.0 $95.0 29.5 Total 2P 9.6 17.1 $21

  9. Slide 9: Angle Cardium Reserve Growth

    ANGLE CARDIUM H1 2013 AVG 3,800 BOE/D (70% OIL & LIQUIDS) Cardium Reserve Growth $150 MM 18 17.1 Capital Investment to Date Gas 16 Oil & Liquids 5.2 $45 MM 14 Cardium Reserves (MMBOE) 12 Q4 2012 Annualized CF 10 8.7 $30k/boepd 8 6 6.1 2.9 11.9 2.4 3 Year Capital Efficiency 4 3.7 3.7 2.3 2.1 1.6 5.8

  10. Slide 10: Significant Cardium Base

    SIGNIFICANT CARDIUM BASE 1,039→ 400 350 5th LARGEST 300 300 CARDIUM LANDHOLDER 265 209 250 219 Net Sections (1) 204 200 149 132 124 150 120 118 110 102 100 91 100 81 80 75 71 67 60 57 52 51 50 49 48 47 40 38 50 27 25 20 17 13 0 (1) 1 section = 640 acres (2) Denotes Private Company. Land positions ar

  11. Slide 11: Angle's Cardium Assets

    ANGLE’S CARDIUM ASSETS H1 2013 AVG 3,800 BOE/D (70% OIL & LIQUIDS) EDSON H1 2013 Avg 300 200 boe/d Net Locations (>80% Unbooked) EDMONTON 88% Average Working Interest FERRIER H1 2013 Avg 1,700 boe/d 17 mmboe 2P Reserves (70% Oil & Liquids) HARMATTAN H1 2013 1,900 boe/d $6.40/boe LEGEND Vertical Card

  12. Slide 12: Harmattan Cardium Operations and Reserves

    HARMATTAN CARDIUM OPERATIONS AND RESERVES Cardium Resource Per Section 13-10 IP30 377 bbl/d 3-3 IP30 458 bbl/d OOIP 4 – 6 MMbbl Recoverable 0.6 – 0.9 MMbbl (15% RF) 15-27 IP30 274 bbl/d Unbooked Inventory Q1 4-3 Forward Booked 2P Locations 38 (4 wells/section density) Test 565 bbl/d Total 2P FDC (MM

  13. Slide 13: Harmattan Cardium: Technology Drives the Play

    HARMATTAN CARDIUM TECHNOLOGY DRIVES THE PLAY Garrington/Harmattan Area 80 SLICKWATER FRACS 600 PAYOUT in 1.5 to 2 Years 70 Highly Economic Profile 500  Slickwater Fracs Daily Average Production (bbl/d) 60  Profitability $ ↑ Cumulative Production (Mbbl) 400 50 40 300 30 OIL‐GEL & OTHER FRACS 200 PA

  14. Slide 14: Harmattan Cardium Type Curve & Economics

    HARMATTAN CARDIUM TYPE CURVE & ECONOMICS – ANGLE’S DRILLING 700 EUR NPV 10% IRR GOR Range 500 – 2,000 scf/STB 393 mboe $7.0 MM 89% Top Well (300 mbbl) Deep Cut NGL Yield 200 bbl/mmcf 230 mboe $3.6 MM 61% 600 P50 (175 mbbl) Budget Curve (140 mbbl) 183 mboe $2.0 MM 32% Q1 Results Expected to Break Eve

  15. Slide 15: Harmattan Cardium Capital Efficiency Track Record

    HARMATTAN CARDIUM ANGLE’S CAPITAL EFFICIENCY TRACK RECORD Cost Efficiency Capital Efficiency $5,500 50 45 IP 90 Day Capital $5,000 Efficiency Average 40 $22,000/boe/d $4,500 35 30 DCE ($M) M$/boepd $4,000 25 Budget $3,500 $3.2MM 20 15 $3,000 Target 10 $2.9MM $2,500 Sweet Spot 5 $2,000 0 1 3 5 7 9 11

  16. Slide 16: Ferrier Cardium Operations and Reserves

    FERRIER CARDIUM OPERATIONS AND RESERVES Cardium Resource Per Section ANGLE 13-26 HZ OOIP 3 – 6 MMbbl IP30 990 boe/d, 35% Gas Recoverable 0.3 – 0.6 MMbbl (10% RF) Unbooked Inventory Forward Booked 2P Locations 15 (4 wells/section density) Total 2P FDC (MM$) $49.5 MM Unbooked Locations 35 (4 wells/sec

  17. Slide 17: Ferrier Cardium Type Curve

    FERRIER CARDIUM TYPE CURVE 800 EUR NPV 10% IRR Recent 6 ‐ 7 Day Tests Angle 16‐14: 1,600 boe/d (76% oil) P50 425 mboe (58% Gas) $3.0 MM 57% 700 Angle 01‐15: 1,400 boe/d (85% oil) Budget Curve 340 mboe (58% Gas) $1.7 MM 30% Angle 01‐10: 775 boe/d (59% oil) Break Even 225 mboe (58% Gas) ‐ 10% 600 500

  18. Slide 18: Cardium Projects

    CARDIUM PROJECTS 77% BUDGET ALLOCATION 2013 DRILLING BUDGET ALLOCATION 49% 13% 9% 23% 6% Project Harmattan Ferrier Edson Mannville Ferrier Cardium Oil Cardium Oil Cardium Oil & Other Cardium Gas D/C/E/T Capital Cost (MM$) $2.9 $4.0 $4.0 $4.0 $4.0 IP 1 Month (boe/d) 250 500 235 700 500 IP 12 Month (b

  19. Slide 19: Duvernay Shale: Latent Option Value

    DUVERNAY SHALE LATENT OPTION VALUE KAYBOB Vermilion 18 Section Block $30.7MM; $2,665/ac 110.5 Net Sections ANGLE Vermilion 02/15-22 4‐36‐52‐17W5 R.R. Apr 6, 2012 EDSON OIL >70,000 CNRL 1-3 HZ R.R. Apr 22, 2012 Net Acres CONDENSATE GAS $10,000/ac Angle Duvernay Rights Vermillion Duvernay Rights FERRI

  20. Slide 20: Why Angle?

    WHY ANGLE?  Low risk oil inventory; Angle is a large undeveloped Cardium land holder with 80% of undrilled inventory unbooked  Adept drillers and low cost operators with top tier capital efficiencies  Risk appropriate leverage; 2013 D/CF not to exceed 2X on Q4 annualized basis  Shareholders and

  21. Slide 21: Appendix

    APPENDIX More reach. From every angle. More growth. More value. TSX: NGL

  22. Slide 22: H1 2013 Guidance

    H1 2013 GUIDANCE H1 2013 Cardium H1 2013 Production (est.) Gross / Net Wells 15.0 / 11.9 11,300 – 11,500 boe/d Capital Expenditures $52 – $57 MM Cash Flow $21.5 – 24.5 MM H1 2013 Average Production 3,700 – 3,900 boe/d NGL H1 2013 Production Mix (70% Oil & Liquids) 26% Gas H1 2013 Corporate 46% C5+ G

  23. Slide 23: Net Asset Value

    NET ASSET VALUE BASED ON GLJ DEC 31, 2012 EVALUATION Cardium Project December 31, 2012 GLJ 2P NPV 10%(1) $584.3 MM 36% of 2P Value Value of Undeveloped Land(2) $82.1 MM 242 Unbooked Locations 238,000 ac @ $345/ac 180% Growth over 2011 Value of Seismic $7.0 MM 2.3x Recycle in 2012 Net Debt(3) ($177.0

  24. Slide 24: Angle's Current Hedges

    ANGLE’S CURRENT HEDGES Gas ‐ Jan. 1 ‐ Dec. 31/13 AECO ‐ Cdn $3.04/GJ 10,000 GJ/d AECO ‐ Cdn $3.135/GJ 5,000 GJ/d AECO ‐ Cdn $3.2125/GJ 5,000 GJ/d Average ‐ AECO Cdn $3.11/GJ 20,000 GJ/d approx. 61% of forecast 2013 gas production Oil ‐ Jan. 1 ‐ Jun 30/13 Nymex US $98.00/bbl 500 bbls/d Nymex US $80.0

  25. Slide 25: Lease Operating Detail

    LEASE OPERATING DETAIL NETBACKS BY PROJECT – NOV. 2012 ACTUALS Harmattan Cardium Ferrier Cardium Edson Cardium Angle Corporate(1) Production 1,828 boe/d 1,288 boe/d 88 boe/d 11,176 boe/d Production % Oil 82% 25% 91% 18% WTI Benchmark $86.73/bbl $86.73/bbl $86.73/bbl $86.73/bbl Fieldgate Price $81.13

  26. Slide 26: Price Deck Comparison

    PRICE DECK COMPARISON Edmonton Light Oil AECO Natural Gas C2 Ethane 120.00 10.00 20 9.00 18 100.00 8.00 16 7.00 14 80.00 $/bbl $/mmbtu 6.00 12 $/bbl 60.00 5.00 10 4.00 8 40.00 3.00 6 2.00 4 20.00 1.00 2 0.00 0.00 0 C3 Propane C4 Butane C5 Pentane 70.00 90.00 120.00 80.00 60.00 100.00 70.00 50.00 60.

  27. Slide 27: Angle Current Project Inventory

    ANGLE CURRENT PROJECT INVENTORY Budgeted Unbooked Unbooked Cost/Well NPV10% Upside Area Project Locations Locations IP EUR/Well (MM$) (M$) (MM$) Harmattan Viking Gas 60 60 260 450 4.3 800 48 Viking Oil 60 65 360 280 4.3 2,700 162 Mannville NGL 55 100 700 750 4.0 2,300 127 Mannville OIL 37 40 280 275

  28. Slide 28: Angle Unrisked Oil Inventory

    ANGLE UNRISKED OIL INVENTORY # TARGET LOCATIONS AT PRICE VARIABILITY First 3 Year Average Gas Price $3.00/GJ 400 Harmattan Viking 350 65 Ferrier Cardium Total Company Inventory Locations 300 35 Harmattan Mannville 40 250 Edson Cardium 75 200 150 100 Harmattan Cardium 175 50 0 50.00 60.00 70.00 Flat

  29. Slide 29: Angle Unrisked Gas Inventory

    ANGLE UNRISKED GAS INVENTORY # TARGET LOCATIONS AT PRICE VARIABILITY 500 First 3 Year Average Price $/bbl Condensate 94.50 450 Butane 55.80 Propane 27.90 Duvernay 250 400 Ethane 8.50 Total Company Inventory Locations 350 300 250 Harmattan Viking Gas 60 200 Lone Pine Wabamun 15 150 Ferrier Cardium 15

  30. Slide 30: Angle's Cardium Position

    ANGLE’S CARDIUM POSITION >82,000 NET UNDEVELOPED ACRES, 300 LOCATIONS Harmattan Area Ferrier Area Edson Area H1 2013 Avg 1,900 boe/d H1 2013 Avg 1,700 boe/d H1 2013 Avg 200 boe/d Legend Angle Lands – Other PNG Angle Cardium Lands Cardium Trend Industry Cardium HZ Angle Cardium HZ Cardium Vertical We

  31. Slide 31: Harmattan Cardium Type Curve & Economics

    HARMATTAN CARDIUM TYPE CURVE & ECONOMICS – ANGLE’S DRILLING 700 EUR NPV 10% IRR GOR Range 500 – 2,000 scf/STB Top Well (300 mbbl) 393 mboe $7.0 MM 89% Deep Cut NGL 600 P50 (175 mbbl) 230 mboe $3.3 MM 52% Yield 200 bbl/mmcf Budget Curve (140 mbbl) 183 mboe $2.0 MM 32% Break Even (82 mbbl) 107 mboe ‐

  32. Slide 32: Harmattan Cardium Drilling & Completions

    HARMATTAN CARDIUM DRILLING & COMPLETIONS Harmattan Cardium Vertical Depth 1,950 m – 2,200 m Horizontal Lateral Length 1,300 m Drilling Time 14 days Budget Drill Cost $1.5MM 1,950 m Budget Completion Cost $1.0MM to 2,200 m Budget Equip/Tie Cost $0.4MM Frac Fluid System Slickwater Number of Stages 20

  33. Slide 33: Harmattan Cardium P50 Economics: Crown vs. Freehold

    HARMATTAN CARDIUM P50 ECONOMICS – CROWN VS. FREEHOLD 100% Crown 60% Crown/40% FH 100% Freehold Economics Economics Economics D/C/E/T Capital Cost (MM$) $2.9 $2.9 $2.9 IP 1 Month (boe/d) 250 250 250 IP 12 Month (boe/d) 106 106 106 IP 12 Month Capital Eff. ($/boepd) $27,350 $27,350 $27,350 NPV BT 10%

  34. Slide 34: Ferrier Cardium Drilling & Completions

    FERRIER CARDIUM DRILLING & COMPLETIONS Ferrier Cardium Vertical Depth 2,250 m – 2,450 m Horizontal Lateral Length 1,100 m Drilling Time 18 days Budget Drill Cost $2.2MM 2,250 m Budget Completion Cost $1.2MM to 2,450 m Budget Equip/Tie Cost $0.6MM Frac Fluid System Gelled Oil Number of Stages 14 ‐ 20

  35. Slide 35: Ferrier Cardium: Q1 Tests Materially Exceed Type Curve

    FERRIER CARDIUM Q1 TESTS MATERIALLY EXCEED TYPE CURVE 800 EUR NPV 10% IRR P50 425 mboe (58% Gas) $3.0 MM 57% 700 Q1 6 ‐ 7 Day Tests Angle 16‐14: 1,600 boe/d (76% oil) Budget Curve 340 mboe (58% Gas) $1.7 MM 30% Angle 01‐15: 1,400 boe/d (85% oil) Break Even 225 mboe (58% Gas) ‐ 10% 600 Angle 01‐10: 7

  36. Slide 36: Ferrier Cardium Type Curve & Economics

    FERRIER CARDIUM TYPE CURVE & ECONOMICS 800 Ferrier Cardium Oil 800 Ferrier Cardium Liquids Rich Gas 700 Recent 6 - 7 Day Tests Liquids Yields Angle 16-14: 1,600 boe/d (76% oil) C3 28 bbl/mmcf Angle 01-15: 1,400 boe/d (85% oil) C4 15 bbl/mmcf 600 Angle 01-10: 775 boe/d (59% oil) C5+ 15 bbl/mmcf 600 5

  37. Slide 37: Edson Cardium Operations and Reserves

    EDSON CARDIUM OPERATIONS AND RESERVES Cardium Resource Per Section 4-35 Non-op IP30 147 bbl/d OOIP 4 – 7 MMbbl Recoverable 0.6 – 1.0 MMbbl (15% RF) Industry 4-26 8-31 Non-op Pad IP30 > 200 bbl/d Avg IP 30 30 bbl/d 12 month cum 55 mbbls Unbooked Inventory Forward Booked 2P Locations 5 (4 wells/sectio

  38. Slide 38: Edson Cardium Drilling & Completions

    EDSON CARDIUM DRILLING & COMPLETIONS Edson Cardium Vertical Depth 1,650 m Horizontal Lateral Length 1,100 m Drilling Time 13 days Budget Drill Cost $2.0MM 1,650 m Budget Completion Cost $1.5MM Budget Equip/Tie Cost $0.5MM Frac Fluid System Modified Slickwater Number of Stages 15 ‐ 30 Frac Size 20 To

  39. Slide 39: Edson Cardium Type Curve

    EDSON CARDIUM TYPE CURVE EUR NPV 10% IRR 300 P50 (175 mbbl) 300 mboe (32% Gas) $3.4 MM 43% Budget Curve (140 mbbl) 240 mboe (32% Gas) $1.9 MM 26% Break Even (85 mbbl) 145 mboe (32% Gas) ‐ 10% 250 P50 – SLICKWATER COMPLETION 200 Budget Curve – Oil Rate (bbl/d) SLICKWATER COMPLETION 150 Break Even – 1

  40. Slide 40: Edson Cardium Type Curve & Economics

    EDSON CARDIUM TYPE CURVE & ECONOMICS Edson Cardium Results and Typecurve Edson Cardium GOR Profile 300 100,000 Suspected Wellbore Plugging Drillout Candidate P50: EUR 175 Mbbl NPV10% = $3.4MM; IRR = 43% 250 Budget Curve: EUR 140 Mbbl 10,000 200 NPV10% = $1.9MM; IRR = 26% 4,500 scf/STB Oil Rate (bbl/

  41. Slide 41: Angle Mannville: Gas & NGL Option

    ANGLE MANNVILLE GAS & NGL OPTION HZ Project (23 Wells) FERRIER 8,000 CAPEX $100 MM 68% Paid Out to Date 7,000 6,000 Project Production (boe/d) 5,000 4,000 3,000 HZ Wells 2,000 HARMATTAN 1,000 Vertical Wells 0 LEGEND Vertical Mannville Producers HZ Mannville Wells CALGARY Mannville HZ Aggregate Produ

  42. Slide 42: Harmattan Mannville Drilling & Completions

    HARMATTAN MANNVILLE DRILLING & COMPLETIONS Harmattan Mannville Vertical Depth 2,450 m Horizontal Lateral Length 1,100 m Drilling Time 20 days Budget Drill Cost $2.2MM 2,450 m Budget Completion Cost $1.4MM Budget Equip/Tie Cost $0.4MM Frac Fluid System Gelled Oil Number of Stages 14 Frac Size 25 ‐ 40

  43. Slide 43: Harmattan Mannville: Track Record of Value Creation

    HARMATTAN MANNVILLE TRACK RECORD OF VALUE CREATION 50/50 Crown 10,000 Crown & Freehold Freehold Economics Economics Economics D/C/E/T Capital Cost 03‐11 IP30 $4.0 $4.0 $4.0 420 boe/d (MM$) IP 1 Month (boe/d) 700 700 700 IP 12 Month (boe/d) 282 282 282 1,000 Gas Condensate Wells IP 12 Month Capital $

  44. Slide 44: Financial Highlights

    FINANCIAL HIGHLIGHTS 2012 2011 2010 2009 Average production (boe/d) 14,639 13,163 9,243 7,528 Cash flow ($000s) 84,494 95,686 49,834 40,154 Cash flow per share ($) ‐ diluted 1.05 1.30 1.00 0.90 Cash flow netback ($/boe) 15.77 19.92 17.37 14.63 Operating netback($/boe) 20.25 24.09 22.14 17.03 Earning

  45. Slide 45: Management

    MANAGEMENT Directors Noralee Bradley LLB Edward Muchowski P. Eng Partner, Osler, Hoskin & Harcourt LLP Chair of Reserve and EH&S Committee Chair of Board of Directors and on Compensation Committee Scott Bratt CA, CFA Jacob Roorda P. Eng Former Managing Director, FirstEnergy Capital Corp. Vice Chair,

  46. Slide 46: Analyst Coverage

    ANALYST COVERAGE AltaCorp Capital Inc. FirstEnergy Capital Corp. Don Rawson Cody R. Kwong BMO Capital Markets GMP Securities Jim Byrne Grant Daunheimer CIBC World Markets Haywood Securities Adam Gill Clarus Securities National Bank Daniel Choi Dan Payne Cormark Securities Paradigm Capital Jonathan F

  47. Slide 47: For More Information Contact

    FOR MORE INFORMATION CONTACT: Heather Christie-Burns 403-263-4534 President & COO invest@angleenergy.com More reach. From every angle. More growth. More value. TSX: NGL

Angle Energy — Investor Presentation (April 2013) on 6ix