13 slides from Southern Hemisphere Mining's investor presentation, June 2021
Slide 1: The future for the Los Pumas Manganese Project-Chile
SOUTHERN HEMISPHERE MINING Manganese Battery Metals The future for the Los Pumas Manganese Project-Chile Page 1
Slide 2: Focus on the EV Battery Market
FOCUS ON THE EV BATTERY MARKET SUH is engaging technical specialists to guide process and development option studies for the use of Los Pumas ore in Nickel Cobalt Manganese (NCM) batteries or similar, aimed at the EV market SUH target is to provide manganese ores to produce High Purity Manganese
Slide 3: The Los Pumas Manganese Project
THE LOS PUMAS MANGANESE PROJECT Project 100% owned located Northern Chile Mineral Resource Estimate - 23.7Mt @ 7.81% Mn (4% Mn COG) - (ASX release 25 March 2011 - Resources & ASX 2 February 2011 - PEA) 38% Mn concentrate from initial metallurgical Test work Low Iron & Phosphorous, High Silic
Slide 4: Location
LOCATION Los Pumas located in northern Chile 175km from Arica (Port city) Major port for Bolivia Exports & Imports Tin, Steel, Lead concentrate & Soya Location is close to USA west coast and China for optimal end user supply Page 4
Slide 5: Manganese – A Growing Demand
MANGANESE – A GROWING DEMAND Manganese (Mn) is the fourth most used metal on earth in terms of tonnage Used in steel, specialty alloys and aluminium products Traditionally the market has been dominated by the steel and alkaline battery industries The electrification of the global vehicle fle
Slide 6: High Purity Manganese
HIGH PURITY MANGANESE Nickel and cobalt supply constraints to meet the demand for projected EV growth Tesla and VW plan to mass produce a new battery with a high proportion of manganese and no cobalt - Tesla ~ 33% Mn & VW >50% Mn The new cathode designs are expected to reduce costs without com
Slide 7: Simple Geology – Good Mining Parameters
SIMPLE GEOLOGY – GOOD MINING PARAMETERS Sub-horizontal mineralization (in top 20 meters) with negligible stripping in early years Excellent potential to increase resources laterally and deeper Resource limited to drilling Drilled on average to 27 meters depth Vertical feeder zones have not
Slide 8: PEA/Scoping Study Overview
PEA/SCOPING STUDY OVERVIEW Geology & Drilling Deposit hosted by the Huaylas Formation (Upper Miocene age) and the Lauca Ignimbrite (Upper Pliocene) Lauca Ignimbrite hosts most of the manganese mineralisation at Los Pumas Sub-horizontal mineralization (in top 20 meters) 487 holes of RC comple
Slide 9: Logistics
LOGISTICS 175km by sealed road and railway to the Arica port Arica – La Paz railway line re-opened May 21 Opportunities for lower transport costs Page 9
Slide 10: Pathway to Carbon Neutrality
PATHWAY TO CARBON NEUTRALITY Emissions impact will be an integral part of our project plan and possible future mine design, not an add-on or an afterthought Minimise transportation of consumables and people to/from site Energy efficiency key consideration for all mine processing equipment Wa
Slide 11: Next Steps
NEXT STEPS SUH engaging technical specialists to guide process and development option studies for the use of Los Pumas ore in NCM batteries and EV markets Capex from historic PEA study (ASX Release 2 Feb 2011) was US$74.2m and engineering studies underway to revise and reduce Bring in a JV end
Slide 12: Los Pumas Manganese Resource
LOS PUMAS MANGANESE RESOURCE Page 12
Slide 13: Disclaimer
Disclaimer Disclaimer Notice This presentation has been prepared by Southern Hemisphere Mining Limited a.c.n 140 494 784 (“SUH”, “Southern Hemisphere” or the “Company”). This presentation contains certain forward – looking information and forecasts. Such forecasts, projections and information are no
Source: Internet Archive copy of shmining.com.au
More decks from Southern Hemisphere Mining Limited