Slide 1: Caroona Coal Project
Caroona Coal Project Gunnedah Coal Conference
Slide 2: Disclaimer
Disclaimer The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation ha
Slide 3: Caroona Coal Project
TO STAKEHOLDERS scus: ae eat eal bhpbilliton bhpbilli CAROONA COAL PROJECT Biri the fuse pbilliton Slide 3 sourcing the future
Slide 4: Exploration Licence History
Exploration Licence History • Authorisation 216 was originally granted on 9 May 1980. • Expressions of Interest sought for a portion of A216 on 1 August 2005 • EL6505 formally granted to Coal Mines Australia Limited, 100% owned by BHP Billiton. – On 12 April 2006. – Area = 344 sq. km • The Explorati
Slide 5: Caroona Exploration Area
Caroona Exploration Area Slide 5
Slide 6: Summary Exploration and Assessment Program
Summary Exploration and Assessment Program FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 Concept Pre-Feasibility Feasibility Environmental Baseline Studies Engineering Management Plan Regional Exploration Targeted Exploration Project Assessment Baseline Environmental Studies Studies specific to proposal
Slide 7: Georges Island Doona State Forest Nicholas Ridge
Georges Island Doona State Forest Nicholas Ridge Slide 7
Slide 8: DPI Drilling | Caroona Coal Project
DPI Drilling 7 | Caroona Coal Project bhpbilliton él bhpbilliton resourcing the future
Slide 9: DPI Drilling + Completed Bores to August 2008
DPI Drilling + Completed Bores to August 2008 bhpbilliton ve future
Slide 10: Coal Seams within the area
Coal Seams within the area • There is generally between 8 to 10 coal seams in the exploration area. • Some seams merge together and split in different locations. Slide 10
Slide 11: East-West cross section of coal seams
East-West cross section of coal seams Doona Pt ~325m Slide 11
Slide 12: Slide 12
Slide 12
Slide 13: Types of Water Monitoring Bores
Types of Water Monitoring Bores Slide 13
Slide 14: Typical Ground Water Monitor sites
Typical Ground Water Monitor sites Standpipe & VWP Multiple Standpipe at different RL’s 915 groundwater monitoring bores installed 911 standpipe & 24 vibrating wire piezometers 9Monitoring 13 DWE standpipe piezometers 9Also 62+ private landholder water samples collected & analysed Slide 14
Slide 15: DPI Drilling + Completed Bores + Monitoring Sites
DPI Drilling + Completed Bores to August 2008 + BHPB + DWE Monitoring Sites ©) Completed Carcona Project Groundwater monitoring site © OWE Groundwater monitoring site 2" Proposed Caroona Project Groundwater monitoring site J bhpbilliton ve future
Slide 16: Progressively building up Base Line Data
Progressively building up Base Line Data Dust Deposition Gauge High Volume Air Sampler Slide 16 Weather Station
Slide 17: In 2006 BHP Billiton said…
In 2006 BHP Billiton said… • We will not proceed with a mining proposal that would have a negative impact on the deep alluvial irrigation aquifers. • We do not expect it to be feasible to mine the whole of the exploration area. Slide 17
Slide 18: Mining methods not being considered
¾Not considering Longwall mining under deep alluvial irrigation aquifer ¾Not considering Longwall mining under the flood plains ¾Not considering Open Cut mining anywhere on the Caroona ELA Slide 18
Slide 19: Targeted Exploration
Targeted Exploration • The Mooki River and Quirindi Creek are outside the area to be targeted for further exploration. • These areas are generally located under the ridge country of Doona Point (including Doona State Forest), Nicholas Ridge and George’s Island. • Exploration drilling to date, and ot
Slide 20: What next?
What next? • Community Consultation • Further slim core drilling • Environmental monitoring – Surface and Groundwater – Air quality – Meterological conditions – Noise – Flora & fauna – Cultural heritage – Soils • Pre-Feasibility (Selection) Phase Study Slide 20
Slide 21: Slide 21
je él ohpobilliton resourcing the future bhpbilliton resourcing the fu