  1. Slide 1: Caroona Coal Project

    Caroona Coal Project Gunnedah Coal Conference

  2. Slide 2: Disclaimer

    Disclaimer The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation ha

  3. Slide 3: Caroona Coal Project

    TO STAKEHOLDERS scus: ae eat eal bhpbilliton bhpbilli CAROONA COAL PROJECT Biri the fuse pbilliton Slide 3 sourcing the future

  4. Slide 4: Exploration Licence History

    Exploration Licence History • Authorisation 216 was originally granted on 9 May 1980. • Expressions of Interest sought for a portion of A216 on 1 August 2005 • EL6505 formally granted to Coal Mines Australia Limited, 100% owned by BHP Billiton. – On 12 April 2006. – Area = 344 sq. km • The Explorati

  5. Slide 5: Caroona Exploration Area

    Caroona Exploration Area Slide 5

  6. Slide 6: Summary Exploration and Assessment Program

    Summary Exploration and Assessment Program FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 Concept Pre-Feasibility Feasibility Environmental Baseline Studies Engineering Management Plan Regional Exploration Targeted Exploration Project Assessment Baseline Environmental Studies Studies specific to proposal

  7. Slide 7: Georges Island Doona State Forest Nicholas Ridge

    Georges Island Doona State Forest Nicholas Ridge Slide 7

  8. Slide 8: DPI Drilling | Caroona Coal Project

    DPI Drilling 7 | Caroona Coal Project bhpbilliton él bhpbilliton resourcing the future

  9. Slide 9: DPI Drilling + Completed Bores to August 2008

    DPI Drilling + Completed Bores to August 2008 bhpbilliton ve future

  10. Slide 10: Coal Seams within the area

    Coal Seams within the area • There is generally between 8 to 10 coal seams in the exploration area. • Some seams merge together and split in different locations. Slide 10

  11. Slide 11: East-West cross section of coal seams

    East-West cross section of coal seams Doona Pt ~325m Slide 11

  12. Slide 12: Slide 12

    Slide 12

  13. Slide 13: Types of Water Monitoring Bores

    Types of Water Monitoring Bores Slide 13

  14. Slide 14: Typical Ground Water Monitor sites

    Typical Ground Water Monitor sites Standpipe & VWP Multiple Standpipe at different RL’s 915 groundwater monitoring bores installed 911 standpipe & 24 vibrating wire piezometers 9Monitoring 13 DWE standpipe piezometers 9Also 62+ private landholder water samples collected & analysed Slide 14

  15. Slide 15: DPI Drilling + Completed Bores + Monitoring Sites

    DPI Drilling + Completed Bores to August 2008 + BHPB + DWE Monitoring Sites ©) Completed Carcona Project Groundwater monitoring site © OWE Groundwater monitoring site 2" Proposed Caroona Project Groundwater monitoring site J bhpbilliton ve future

  16. Slide 16: Progressively building up Base Line Data

    Progressively building up Base Line Data Dust Deposition Gauge High Volume Air Sampler Slide 16 Weather Station

  17. Slide 17: In 2006 BHP Billiton said…

    In 2006 BHP Billiton said… • We will not proceed with a mining proposal that would have a negative impact on the deep alluvial irrigation aquifers. • We do not expect it to be feasible to mine the whole of the exploration area. Slide 17

  18. Slide 18: Mining methods not being considered

    ¾Not considering Longwall mining under deep alluvial irrigation aquifer ¾Not considering Longwall mining under the flood plains ¾Not considering Open Cut mining anywhere on the Caroona ELA Slide 18

  19. Slide 19: Targeted Exploration

    Targeted Exploration • The Mooki River and Quirindi Creek are outside the area to be targeted for further exploration. • These areas are generally located under the ridge country of Doona Point (including Doona State Forest), Nicholas Ridge and George’s Island. • Exploration drilling to date, and ot

  20. Slide 20: What next?

    What next? • Community Consultation • Further slim core drilling • Environmental monitoring – Surface and Groundwater – Air quality – Meterological conditions – Noise – Flora & fauna – Cultural heritage – Soils • Pre-Feasibility (Selection) Phase Study Slide 20

  21. Slide 21: Slide 21

    je él ohpobilliton resourcing the future bhpbilliton resourcing the fu