Goldsource Mines — Investor Presentation (December 2022)
33 slides from Goldsource Mines's investor presentation, December 2022
Slide 1: Resource Scale, Strategic Scalability
Resource Scale Strategic Scalability Eagle Mountain Gold Project Guyana, South America December 2022 TSX.V: GXS | OTCQX: GXSFF
Slide 2: Cautionary Statements
Cautionary Statements Forward-Looking Statements Certain statements contained in this presentation constitute “forward-looking statements” and “forward- Forward-looking statements are based on the expectations and opinions of the Company's management looking information” (collectively “forward-looki
Slide 3: Management and Board
Goldsource Mines Inc. (GXS-TXS.V) Management and Board Steve Parsons, P.Eng., Chief Executive Officer (25 yrs experience) Kevin Pickett, M.Sc., Chief Geologist (16 yrs experience) Capital markets professional, senior executive and mine operations engineer Exploration geologist with expertise in the
Slide 4: Resource Scale, Strategic Scalability
Resource Scale Strategic Scalability Formula for Project Execution Resource Scale • Eagle Mtn Prospecting License, Guyana • 2022 MRE1 – 1.2 mln oz in Indicated and 582,000 oz gold in Inferred Resources • Targeting shallow multi-mln oz potential Distinctly Scalable and Shallow • Shallow resource (sur
Slide 5: Eagle Mountain Project: Growing Resource Scale
Eagle Mountain Project Growing Resource Scale – Demonstrating Scalability Discovery MRE Update (x2) and Exploration The Bigger Picture - PFS 2018 to 2021 2021 and 2022 2023 and Beyond Two key structural trends (NE & NS) Q1/21 MRE demonstrated significant With clearer definition on scale, with resour
Slide 6: Eagle Mountain Project (100%)
Eagle Mountain Georgetown Project (100%) Eagle Mtn Stands Out in Under-Explored Guyana 230 km SW of Georgetown, Guyana 100% interest in the Eagle Mountain Prospecting License (PL) covers an Highway access from Georgetown area of 5,000 hectares(2) with commercial airport in Mahdia, 7 km from the Eagl
Slide 7: Infrastructure Projects - Planned: Road Upgrade
Infrastructure Projects - Planned Road Upgrade Project Moving Ahead Upgrade 121 km of gravel road to asphaltic concrete (Linden to Mabura) To improve transport efficiency, climate resilience and road safety Grant from the UK Caribbean Infrastructure Fund (UKCIF) and Paved Road (existing) Gravel Road
Slide 8: Infrastructure Projects - Hydropower and Gas-to-Shore
Gas-to-Shore Power Generation and Integrated Natural Gas Liquid Plant Infrastructure Projects - Planned (300 MW) Hydropower and Gas-to-Shore Projects Amaila Hydropower Project (165 MW) China Railway Group Ltd selected for construction (announced November 2/21) Build-Own-Operate-Transfer model, to su
Slide 9: Widespread Gold Mineralization
Widespread Gold Mineralization Regionally and at Eagle Mountain Zion N Eagle Mountain TSX.V: GXS | OTCQX: GXSFF 9
Slide 10: Regional Mining Areas near Eagle Mountain
St Elizabeth Mahdia – St. Elizabeth Paleochannel (north of Eagle Mtn) Mahdia Valley Eagle Mtn Breakfast Creek and Konawaruk River Salbora Mahdia – Tiger Creek Eagle Mountain Paleochannel Deposit (northeast of Eagle Mtn) Minnehaha River Wineaperu Mowasi Minnehaha Creek Mahdia – Tiger Creek Mine (nort
Slide 11: April 2022 MRE Update
Apr 2022 MRE Update Confirming Scale… …Indicated Resources up 40% to 1.2mln oz gold Drilling MRE defined by 772 core holes 75,430 m with avg depth of 98 m Eagle Mountain and Salbora Deposits Au Price Assumption at US$1,600/oz CATEGORY OXIDATION CUT-OFF TONNES GOLD GOLD OUNCES TYPE GRADE MT GRADE Sha
Slide 12: Eagle Mtn Project Geology
Eagle Mtn Project Geology Prominent NE and NS Structural Trends Eagle Mountain Deposit • Series of tabular, shallow, dip-slope shear zones developed within a granodioritic host rock. Covers an area of ~ 2.5 km by 1.5 km • At least three discrete zones of alteration and mineralization. Zone 1 is shal
Slide 13: Eagle Mountain Deposit
Eagle Mountain Deposit Sub-Horizontal Zones in Granodiorite Schematic of Mineralized Zones at Eagle Mountain Deposit • Sub-horizontal mineralized zones starting at surface. • Shallow, west-dipping thrust faults in granodiorite range from narrow mylonite zones to broader zones of pervasive deformatio
Slide 14: Eagle Mtn – Example Cross Section
Eagle Mtn – Example Cross Section Bottle Bank and Ounce Hill Continuity being confirmed within the central area EMM21-108 20 m (ETW) at 2.61 g/t (Bottle) EMM21-111 10 m (ETW) at 2.71 g/t (Bottle) EMD21-007 34 m (ETW) at 20.38 g/t (Ounce Hill) 1) Refer to Company news release dated June 17, EMM21-008
Slide 15: Eagle Mountain Deposit - April 2022 MRE
Eagle Mountain Deposit - April 2022 MRE Eagle Mountain Deposit Sub-Horizontal Zones Starting at Surface Oxidation Domains (looking South-East) Eagle Mountain Deposit Resource Category (looking South-East) April 2022 MRE Update Indicated Res. Extends from surface to max depth of 150 m Average depth o
Slide 16: Salbora Deposit
Salbora Deposit Mineral Resource Category Salbora Deposit Breccia Style with Higher Grades Schematic Cross-section of Mineralization in Salbora April 2022 MRE Update Indicated Res. Extends from surface to max depth of 156 m Average depth of 49 m 58% of Indicated Resource within 50 m of TSX.V: GXS |
Slide 17: MRE April 2022 Sensitivity
Pit Constrained MRE - $1,600/oz Au Price MRE April 2022 Sensitivity Analysis (Gold Price) Looking North Salbora Toucan-Powis Eagle Mountain View Point Plunge: -6o Azimuth: 008o Pit Constrained MRE - $1,800/oz Au Price TSX.V: GXS | OTCQX: GXSFF 18
Slide 18: 2022 Objectives
2022 Objectives (1) Exploration (2) Engineering (3) Technical Studies Initial 11,000 m drill program following Additional metallurgical testwork MRE Update in Q1/22 focused on up on Toucan, Soca and Eagle Mtn focused on grind optimization (17 resource conversion (complete) targets (H2) fresh rock +
Slide 19: Greenfields Exploration
East Side of PL Under Explored Greenfields Exploration …Salbora-Powis Trend and East Side of the PL Exploration Drilling Initial 11,000 m drill program following up on NE Extensions of Toucan, Soca and Eagle Mtn targets (Saddle) Eagle Mtn deposit Generative Exploration Re-initiation of systematic ge
Slide 20: Toucan – 2021 Prospect
Toucan – 2021 Prospect EME21-197 hits 41.4 m (ETW) at 4.3 g/t From Surface EMM21-108 20 m (ETW) at 2.61 g/t EMM21-110 14 m (ETW) at 1.96 g/t EMM21-111 10 m (ETW) at 2.71 g/t TSX.V: GXS | OTCQX: GXSFF 1) Refer to Company news release dated December 2, 2021. 21
Slide 21: Soca – 2022 Prospect
Soca – 2022 Prospect EMX21-010 hits 18.31 g/t over 6.0 m at 130 m vertical depth EMM21-108 20 m (ETW) at 2.61 g/t EMM21-110 14 m (ETW) at 1.96 g/t EMM21-111 10 m (ETW) at 2.71 g/t TSX.V: GXS | OTCQX: GXSFF 22 1) Refer to Company news release dated March 11, 2022 22
Slide 22: Generative Exploration
Generative Exploration North Zion– High-Grade Trench 40 m grading 5.16 g/t in saprolite Fly Camp NZTR22-005 excavated to follow up on 600m auger anomaly 600m north of MRE limits TSX.V: GXS | OTCQX: GXSFF
Slide 23: Generative Exploration: North Zion
Generative Exploration North Zion –Low-Angle Eagle-Like Structures Located 600 m north of the Eagle Mtn MRE Outline Fly Camp Highlights: • 40.0 m at 5.16 g/t, including 16.0 m at 11.13 g/t (trench) • 4.5 m at 8.22 g/t (auger), 5.5 m at 2.21 g/t (auger) • 9.20 m (ETW) at 2.04 g/t from 15.0 m in sapro
Slide 24: Engineering
Engineering 2021 PFS Gap Analysis for 2022/23 PFS Work Mining Studies Metallurgical Studies Enviro - Hydrology – Infrastructure Hydrogeology & geotech - key factors Saprolite and fresh rock samples (total Wet and dry season work for mine waste for saprolite operations (slope stability, of 850 kg) sh
Slide 25: Metallurgy Also Caters to Scalability
Metallurgy Also Caters to Scalability High Au Recoveries, Coarse Grind & By-Pass Opportunities 2018 Met Results1 (SGS Canada) • 22 saprolite samples (500 kg) from different areas of the Eagle Mountain deposit. • Average gold recovery of 96.5%, via gravity and conventional leaching. • Favorable coars
Slide 26: Biodiversity Studies at Eagle Mountain Project
Biodiversity Studies at Eagle Mountain Project Environmental Baseline Studies 2021 Activities (EMC - Guyana) • Survey Data. Plants and animals wet and dry season surveys completed in Q2 and Q3 2021 • Consolidated Report completed. Results will supersede those of the prior study (completed in 2014)1
Slide 27: Projected Timeline for Eagle Mountain Gold Project
Projected Timeline for Eagle Mountain Gold Project Phased development plan to drive staged permitting and engineering activities * Current project position 2011 - 2022 2023 2023-24 ~2025 Discovery Hole to Exploration Feasibility Permitting Development Exploration Resource Outline Studies Project Fin
Slide 28: Capital Structure
Capital Structure Twelve-Month Price Chart Positioned to Unlock Value 1.20 500,000 1.10 450,000 400,000 1.00 IN MILLIONS 350,000 Shares outstanding 52.3 0.90 Share Price (C$) Fully diluted (1) 60.7 300,000 0.80 Volume Market capitalization (Dec 15, 2022) C$20.1 250,000 Cash position, no debt (Nov 1,
Slide 29: Scale and Scalability
Scale and Scalability Formula for Project Execution E info@goldsourcemines.com T 1-866-691-1760 D 604-694-1760 TSX-V: GXS | OTCQX: GXSFF GOLDSOURCEMINES.COM
Slide 30: Appendix
Appendix
Slide 31: Evolution of the Contained Oz and Grade
Appendix Evolution of the Contained Oz and Grade Indicated Resource Inferred Resource 1,000 1.70 1,000 1.70 1.52 900 1.45 900 1.50 1.50 800 1.32 1.28 800 1.32 700 1.30 700 1.30 Au (000 oz) 1.13 1.16 1.12 Grade (gpt) 600 1.04 600 2022 1.10 1.10 0.95 2021 500 500 2021 0.90 0.82 2014 0.90 400 400 2022
Slide 32: April 2022 MRE Update - Sensitivity to Gold Price
Appendix April 2022 MRE Update - Sensitivity to Gold Price GOLD PRICE TONNES GOLD OUNCES AU CLASSIFICATION (US$/OZ) (000 T) (GPT) (000 OZ) 1,500 12,400 1.05 416 1,600 12,500 1.04 417 INDICATED 1,700 12,500 1.04 418 SAPROLITE & 1,800 12,500 1.04 418 TRANSITION 1,500 6,000 0.72 138 1,600 6,100 0.71 13
Slide 33: Grade is King, Strip Ratio is Queen
Grade is King, Strip Ratio is Queen Illustrative Gross Margins – Sensitivity to Grade and Strip Ratio (Example) -5% 0% Sensitivity 5%of Gross10% Margin (US$/t) 15% to Strip20% Ratio and 25% Grade (Illustrative) 30% 35% 40% 45% Grade (g/t) (+5%) Example 34.77 1.09 1.15 1.21 1.27 1.32 1.38 1.44 1.50 1