  1. Slide 1: Industrial Conservation Initiative

    Industrial Conservation Initiative Class A Methodology of Global Adjustment

  2. Slide 2: Contents

    Contents • Intro to Global Adjustment and methodologies for billing • What is the Industrial Conservation Initiative (ICI) - Class A • Eligibility • What is the Peak Demand Factor? • Annual Opt In Process: • Timeline of ICI • How To Opt In or Out • Requirements • Class A vs Class B Global Adjustment

  3. Slide 3: Section 1: Global Adjustment

    Section 1: Global Adjustment

  4. Slide 4: What is Global Adjustment?

    What is Global Adjustment? • The Global Adjustment is designed to reflect the difference between the Hourly Ontario Energy Price (HOEP) for electricity and the guaranteed rates paid for regulated and contracted generation • This includes the cost to deliver conservation and demand management program

  5. Slide 5: What is Global Adjustment?

    What is Global Adjustment? • Global Adjustment varies from month to month, responding to changes in the HOEP compared to contract prices • When HOEP is high, GA is lower, and vice versa • GA can also increase as new generation projects come into service, contract payments take effect, or as a result

  6. Slide 6: What is Global Adjustment?

    What is Global Adjustment? • Components of Total GA Cost: The three values below represent the main components of global adjustment used by the IESO to calculate the monthly global adjustment rate: 1. Contracts administered by the Ontario Electricity Financial Corporation with existing generation fa

  7. Slide 7: Billing for GA – Class B

    Billing for GA – Class B • Class B Methodology: Total adjusted for loss consumption (kWh) for the billing period x 1 st Estimate of Global Adjustment = $ Amount showing on your invoice The 1st Estimate is comprised of three components: 1. Estimate of the GA costs based on the preceding month 2. Esti

  8. Slide 8: Billing for GA – Class B

    Billing for GA – Class B Example: Billing Period is February 11 to March 14 and total usage is 497,094.65 kWh • 10.559 ¢/kWh – 1st Estimate February • 8.409 ¢/kWh – 1st Estimate March

  9. Slide 9: Section 2: What is ICI and Class A Eligibility

    Section 2: What is ICI and Class A Eligibility

  10. Slide 10: What is ICI – Class A?

    What is ICI – Class A? • The ICI is designed to help large energy users manage their Global Adjustment costs through reducing demand during peak hours • Class A customers are assessed and billed based on their % contribution to the five highest system peaks • The more accurately that a Class A custo

  11. Slide 11: How the top system peaks are determined

    How the top 5 system peaks are determined O.Reg 429/04 Amendments Current: • For the 2021/2022 base period the measurement used to determine the top 5 peak hours is the adjusted allocated quantity of energy withdrawn (AQEW). The AQEW represents the actual quantity of electricity withdrawn from the g

  12. Slide 12: Eligibility

    Eligibility Eligibility Assessment: 1. Average of your monthly adjusted for loss peaks during the Base Period of May 1 to April 30 2. By Calendar Month, not billing periods 3. By adjusted for loss peak kW, not kVA (which takes power factor into consideration) 4. Facility must be in service by start

  13. Slide 13: Eligibility

    Eligibility NAICS code must be self-declared by the customer https://www.statcan.gc.ca/eng/subjects/standard/naics/2017/v3/index

  14. Slide 14: Eligibility

    Eligibility Assessment: Assessment: >1000kW No >500kW <1000kW Industry Industry Classification Classification Restrictions Restrictions Apply

  15. Slide 15: Eligibility

    Eligibility Load Facility Aggregation: • Peak demand is determined at the aggregate of all interval meters at the load facility level. A load facility may comprise multiple meter points and buildings as long as they are located on the same property and associated to the same consumer. • A single loa

  16. Slide 16: Eligibility

    Eligibility Load Facility Aggregation - Additional Ancillary Services: • Additional ancillary services (<50kW) which are supplied separately from the main service(s) at the load facility can be included as part of an aggregation however the existing meter(s) are required to be replaced/upgraded to I

  17. Slide 17: Eligibility

    Eligibility Continued Status: • Existing Class A customers that participated in one or more of the programs specified in Section 6.2 of O. Reg 257/22 (adjustments under Section 25.33 of Ontario Regulation 429/04) and dropped below the peak demand threshold during a base period for an adjustment peri

  18. Slide 18: Section 3: Peak Demand Factor

    Section 3: Peak Demand Factor

  19. Slide 19: Peak Demand Factor

    Peak Demand Factor • Sum of Customer’s five coincident peaks divided by sum of five Ontario system peaks • Please visit the IESO website to view the current Ontario System Peaks • https:// www.ieso.ca/sector-participants/settlements/global-adjustment-and-p eak-demand-factor

  20. Slide 20: Section 4: Opting in to ICI

    Section 4: Opting in to ICI

  21. Slide 21: ICI Key Dates

    ICI Key Dates • April 1 – April 19: LDCs submit their embedded generation and energy storage injection volumes through the Coincident Peak form in Online IESO • April 30: Current base period ends • May 3: The IESO will post the total volume of electricity withdrawn from the IESO controlled grid for

  22. Slide 22: Timeline of ICI

    Timeline of ICI • On an annual basis, eligible customers will be presented the option of Opting in to the ICI

  23. Slide 23: ICI Eligibility Notice

    ICI Eligibility Notice By the end of May, all eligible customers will be sent an email containing their eligibility assessment and calculated Peak Demand Factor. Notice Contents: • How Eligibility Is Determined • Peak Demand Factor Calculation • Estimated Class A vs B Comparison • How to Opt In or O

  24. Slide 24: Opting In to Class A

    Opting In to Class A • Eligibility notice contains a link to the Online Opt In Form • Form must be completed online no later than June 15 • Customers with an average peak demand of above 5 MW are automatically considered Class A and must opt-out if they choose not to participate • Authorization will

  25. Slide 25: Amended Information Disclosure

    Amended Information Disclosure Additional reporting requirements for Class A participants to the Ministry & Independent Electricity System Operator (IESO): • Customers are no longer required to provide the address and GPS coordinates for their company head office • All eligible customers that opt-in

  26. Slide 26: Class A vs Class B Methodologies

    Class A vs Class B Methodologies • Class A vs B comparison – based on historical data • Class B: kWh x 1st Estimate GA Rate • Class A: PDF x GA $ Total

  27. Slide 27: Important Items for Consideration

    Important Items for Consideration • Reminder: you will be billed on your assessed PDF for the entirety of the adjustment period July 1 – June 30 • Are you expecting your load requirements to decline over the adjustment period? For example: • as a result of implementing efficiency measures at the fac

  28. Slide 28: Section 5: Getting the most out of ICI

    Section 5: Getting the most out of ICI

  29. Slide 29: Getting the most out of the ICI

    Getting the most out of the ICI • The more accurately that a Class A customer can predict and reduce their consumption during the top five Ontario peak demand hours, the more they will be able to reduce their overall electricity charges. • There are certain factors that drive the possibility of syst

  30. Slide 30: Forecasting Tools

    Forecasting Tools • IESO Peak Tracking Tool - Demand Forecast from July 13, 2016 (May 2016 – April 2017 base period)

  31. Slide 31: Forecasting Tools

    Forecasting Tools • IESO Peak Tracking Tool - Demand Forecast from May 6, 2022 (May 2022 – April 2023 base period)

  32. Slide 32: Forecasting Tools

    Forecasting Tools • For Current Base Period, IESO posts: • Forecasted Demand for next 24 hours • Forecasted Demand for next 6 days (highest hour of each day) • Top 10 Demand Peaks to Date • New: ICI Ontario Demand Peak Tracker • Provides a real-time snapshot of the top 10 peak hours and ICI Ontario

  33. Slide 33: Forecasting Impacts

    Forecasting Impacts hyerg Date Hour (EST) Coincident Peak (kW) Coincident Peak peaks Ontario System (MW) High re vee ee Hour Ending cd the Highest Gree SnD ww) “August 24, 2021 17 475.874 0476 23,409 718 ‘August 26,2021 14 429-913 0.430 24,020 817 August 23,2021 47 389.027, 0.389 23,068.991 “August

  34. Slide 34: Forecasting Impacts

    Forecasting Impacts • Load Curtailment – 15%

  35. Slide 35: Section 6: Transferring a Class A load facility

    Section 6: Transferring a Class A load facility

  36. Slide 36: Transferring Class A Load Facility

    Transferring Class A Load Facility • Transfer of a Class A load facility process: • Hydro One requires formal written notice of the Class A change of ownership using a template form. The form includes the following information: • The transferor • The transferee • Date of transfer • Address of Class

  37. Slide 37: Transferring Class A Load Facility

    Transferring Class A Load Facility • New: Section 8 of O. Reg 257/22 (adjustments under Section 25.33 of Ontario Regulation 429/04) was amended to allow Class A consumers the ability to transfer a portion of a Class A load facility • Must apply to a separately metered portion of an existing Class A

  38. Slide 38: Additional Notes

    Additional Notes • Customers that move to Class A, will also be moved to Calendar Month Billing (if not already) • Regulatory Charges – how you bill on Capacity Based Recovery changes from per kWh rate to PDF x Total:

  39. Slide 39: QUESTIONS?

    QUESTIONS? 1.866.922.2466 BCC@HydroOne.com