Mayfair Gold Corp. · TSXV:MFG

Mayfair Gold — Investor Presentation (May 2026)

29 slides from Mayfair Gold's investor presentation, May 2026

  1. Slide 1: Creating Optionality Through Disciplined Gold Development

    Creating Optionality Through Disciplined Gold Development May 2026

  2. Slide 2: Cautionary Note Regarding Forward Looking Statement

    Cautionary Note Regarding Forward Looking Statement This presentation contains "forward looking information" for purposes of applicable securities laws ("forward-looking statements"). Forward-looking statements are neither historical facts nor assurances of future performance. Instead, they are base

  3. Slide 3: Why Mayfair Gold?

    Why Mayfair Gold? Unlocking the Value of Fenn-Gib – 4.3 Moz Indicated Gold Resource Strategic Path to Management: Ideal Location to Build with Production Exploration Upside Proven & Aligned  Accelerated Provincial permitting  Prolific Timmins gold district  A management team with a track record o

  4. Slide 4: Located in the Timmins Gold District

    Located in the Timmins Gold District  Timmins region has produced more than 100 Million ounces of gold historically  Excellent access, infrastructure, labour pool and services 4 NYSE AM: MAYFAIR MINE GOLD TAGLINE CANMFG | TSXV: BE PLACED HERE MAYFAIRGOLD.CA

  5. Slide 5: Accelerated Path to Unlock Free Cash Flow

    Accelerated Path to Unlock Free Cash Flow Strategic Path = Accelerated Big, But Slow Path Provincial Permitting (2-3 years) Federal Permitting (7-9 years) Permitting ‘One Project One Process’ framework to streamline mining No greenfield project approved since Impact Assessment Act project approval P

  6. Slide 6: Strategic Path Shortens Development Timeline

    Strategic Path Shortens Development Timeline Exploration Discovery Feasibility Permitting and Financing Construction/Ramp up Production Big, But Slow 8 years 3 years Strategic 2 to 3 years 2 years 6 NYSE AM: MAYFAIR MINE GOLD TAGLINE CANMFG | TSXV: BE PLACED HERE MAYFAIRGOLD.CA

  7. Slide 7: 2026 Pre-Feasibility Study Highlights

    2026 Pre-Feasibility Study1 Highlights PFS1 has 1Moz Reserve at US$3,100 gold. Leaves optionality on 3.3Moz Indicated Resource not mined in PFS 64,096 koz 1.29 g/t Gold US$1,292/Oz $114M $1,707M LOM Average Annual LOM Avg Gold Grade LOM Average AISC2 LOM Average Cumulative FCF2 Gold Production Annua

  8. Slide 8: 2026 PFS Study Summary Tables

    2026 PFS1 Study Summary Tables Fenn-Gib 2026 PFS1 Summary General Units LOM Operating Metrics LOM Total/Avg. Y1-Y6 Gold Price US$ / oz Gold 3,100 Mine Life yr 14.3 F/X C$:US$1 1.35 Daily Throughput tpd 4,800 4,800 Strip Ratio w:o 6.0:1 7.7:1 Operating Costs per Ounce LOM Y1-Y6 Avg. Gold Grade g/t 1.

  9. Slide 9: Grade and Production Profile

    Grade and Production Profile • The Fenn-Gib PFS1 focuses on a high-grade core with average grade of 1.3 g/t Au over the 14.3 year projected mine life • First six years of steady operations expected to produce on average 71,336 oz/year with 1.47 g/t feed grade Fenn-Gib 2026 Production and Grade Profi

  10. Slide 10: Free Cash Flow Profile

    Free Cash Flow2 Profile Post-Tax Economics at $3,100 Gold 250 1,500 C$ 652M 24% 200 1,200 NPV (5%) IRR (%) 150 900 Cumulative After-Tax Cash Flow ($ M) 100 600 2.7 Years 1.4x After-Tax Cash Flow ($ M) Payback Period NPV/ Initial 50 300 Capex – – Y-3 Y-2 Y-1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13

  11. Slide 11: Capex & Opex Breakdown

    Capex & Opex Breakdown Initial Capex (C$ M) Initial Capex Cost Breakdown Mining $31.4 Mining Crushing $21.6 7% Contingency Crushing Process Plant $114.7 5% 15% On-Site Infrastructure $72.4 Other Infrastructure $15.6 Project Preliminaries $35.9 Project Indirects $30.7 Owner’s Owner’s Cost $61.7 Cost

  12. Slide 12: Integrated Site Layout

    Integrated Site Layout 12 NYSE AM: MAYFAIR MINE GOLD TAGLINE CANMFG | TSXV: BE PLACED HERE MAYFAIRGOLD.CA

  13. Slide 13: Proposed Fenn-Gib Process Flow Sheet

    Proposed Fenn-Gib Process Flow Sheet  Conventional metallurgical flowsheet  Similar to Alamos Gold's Young Davidson mine  Metallurgical recovery of 90% Au for a head grade of 1.5 g/t Source: Ausenco, 2025. 13 NYSE AM: UNLOCKING MAYFAIR MINE THE GOLD | TSXV: VALUE TAGLINE OF CAN MFG FENN-GIB BE PL

  14. Slide 14: Predictable Schedule Project to Production

    Predictable Schedule Project designs and impacts stay within the Ontario environmental to Production approval threshold  Production Profile < 5,000 tonnes per day plant and ore mined  No significant impacts to areas of federal jurisdiction DEFINING THE SMALL-SCALE PROJECT TO DERISK Adheres to a ro

  15. Slide 15: High Grade Pit - Grade Control Drilling Program

    High Grade Pit - Grade Control Drilling Program Preliminary* results show potential for a positive reconciliation on high grade zone 56 drill tight-spaced holes completed in Dec 2025; final results expected Q1 2026 PFS Open Pit Phase I Pit Targeting high grade mineralization in Phase 1 Pit Encouragi

  16. Slide 16: Perfectly Located Land Position

    Perfectly Located Land Position Mayfair is located on one of the most prolific structures in the region and surrounded by past producers  The Abitibi Greenstone belt has produced over 190 million ounces and has a gold endowment of over 300 Moz  The two main controlling features are the Destor- Por

  17. Slide 17: Exploration Potential

    Exploration Potential The Fenn-Gib deposit is proof of substantial exploration potential in our land package  The South Block is largely unexplored and sits along the Porcupine-Destor Fault North Block  New Plato ground is very attractive and perfectly situated  North Block is open at depth and a

  18. Slide 18: Re-Rating Opportunity: Catch Up Trade

    Re-Rating Opportunity: Catch Up Trade  2025 = untold story: transition year as management refined the Fenn-Gib development strategy  2026 = visibility and awareness of robust economics and strategic path related to Mayfair investment opportunity GDXJ Mayfair Comparables 4.5 4 Comps 3.5 +207% 3 2.5

  19. Slide 19: Comps and Rerating Potential

    Comps and Rerating Potential Current Trading Value vs. Net Asset Value (C$ mm) NPV* Sensitivity to Gold Price $3,000 $22.65/share ** $ per share value ** $16.95 Spot Gold $2,500 $14.92 $16.14/share ** $12.89 $2,000 $10.87 Base $8.85 $11.22/share ** $1,500 Case $6.81 $5.18 $1,000 $5.33/share ** $788

  20. Slide 20: The Team – 34% Insider Ownership

    The Team – 34% Insider Ownership MANAGEMENT TEAM Drew Anwyll, P.Eng. Kevin Annett, CPA Zayem Lakhani, CFA JF Métail, P.Geo. Adree DeLazzer, P. Geo. VICE PRESIDENT, VP, MINERAL RESOURCE VICE PRESIDENT, CHIEF EXECUTIVE OFFICER CHIEF FINANCIAL OFFICER CAPITAL MARKETS MANAGEMENT EXPLORATION  Profession

  21. Slide 21: The Team – 34% Insider Ownership

    The Team – 34% Insider Ownership BOARD OF DIRECTORS & STRATEGIC ADVISOR Darren McLean Sean Pi, CFA Carson Block Zach Allwright Christine Hsieh Pierre Beaudoin CHAIR OF THE BOARD DIRECTOR DIRECTOR DIRECTOR DIRECTOR STRATEGIC ADVISOR  Director of Research  Partner at Heeney Capital  Founder and Chi

  22. Slide 22: Capitalization Structure

    Capitalization Structure MANAGEMENT & INSIDERS 35% INSTITUTIONAL Issued and Outstanding on List 67.1 M 18% Options & Warrants 2.6 M HNW Fully Diluted Shares 69.7 M RETAIL Share Price (as at Apr 28, 2026) $3.95 Market Capitalization (C$ M) $265 19% C$32 M $7.0 800,000 Cash Position 28% $6.0 34% 600,0

  23. Slide 23: Mayfair Checks ALL the Boxes

    Mayfair Checks ALL the Boxes Great Mines are Built, Not found Mayfair on the path to developing a Great Mine Geology  Jurisdiction  Management  Market Conditions  and Board Drives revenues Drives execution Drives execution Drives cost and and margin timeline and probability availability of capit

  24. Slide 24: Appendix

    ow my MAYFAIR GOLD TSX-V : MFG | NYSE AM: MINE | mayfairgold.ca A

  25. Slide 25: Fenn-Gib Gold Project: 4.3 Million Ounce Indicated Gold Resource

    Fenn-Gib Gold Project: 4.3 Million Ounce Indicated Gold Resource Indicated Cutoff (Au g/t) Tonnes Au (g/t) Au(ounces) 300,000+ 97% >0.7 64,563,000 1.26 2,615,000 Metres drilled Indicated resource category >0.6 82,125,000 1.13 2,984,000 >0.5 105,644,000 1.00 3,397,000 Indicated Gold Resource Estimate

  26. Slide 26: Metallurgical Testwork: De-Risked Plant Design

    Metallurgical Testwork: Quality Metallurgical Testing De-Risked Plant Design  4 Phases of met testing completed since 2010 to define:  mineral characterization and rock properties Quality Metallurgical Testing  Defined Plant Flow Sheet  metallurgical performance (for processing option evaluation

  27. Slide 27: 2025 Fenn-Gib Metallurgical Test Results

    2025 Fenn-Gib Metallurgical Test Results 2025 Metallurgical Testwork Program Targets to support the 2025 PFS: • Ball Mill grind size of 80% passing 106 µm • 23 to 29% concentrate mass pull • Fine grinding size of 80% passing 13 µm • 30-hr cyanidation period (rate kinetic samples taken at 6, 12, 18,

  28. Slide 28: Thank You

    THANK YOU Drew Anwyll CEO Drew@mayfairgold.ca Zayem Lakhani VP Capital Markets Zayem@mayfairgold.ca

  29. Slide 29: Endnotes

    Endnotes 1. References in this presentation to PFS or Pre-Feasibility Study refers to the company’s NI-43-101 Technical Report and Pre-Feasibility Study for Fenn-Gib dated January 14, 2026 with an effective date of December 19, 2025. 2. This presentation and certain documents incorporated by referen

Mayfair Gold — Investor Presentation (May 2026) on 6ix