Northam Platinum Holdings Limited · JSE:NPH
Northam Platinum — Deutsche Bank conference June 2010
9 slides from Northam Platinum's conference presentation, June 2010
Slide 1: Disclaimer
Disclaimer Certain statements in this presentation (other than the statements of historical fact) may contain forward-looking statements regarding Northam Northam’ss operation, operation economic performance or financial condition, condition including, including without limitation, limitation those
Slide 2: Consistent delivery, sound track record; Healthy diversified asset portfolio
Consistent delivery, sound track record Reliable single-asset 300koz PGM producer 20 year track record Innovation and technological prowess Cash balances (ZAR) Cash generative and profitable 1 600 000 1 499 748 1 400 000 Lean, focused management 1 209 912 1 200 000 974 879 1 000 000 920 90
Slide 3: Geographic diversification; In the midst of transition
Geographic diversification Polokwane PP Rust WF Mokopane Lebowa North Dwaalkop Limpopo Twickenham CRF Marula Thabazimbi Modikwa Amandelbult Zondereinde Union Two Rivers Pilanesberg Bela Bela Mototolo Groblersdal Der Brochen Sedibelo Everest Booysendal BRPM Pandora Zeerust Impala Brits SF Rustenburg
Slide 4: Zondereinde – a story of delivery; Booysendal – the best address
Zondereinde – a story of delivery First production 1993 Produced to date 5 Moz (3PGM+Au) Sales volumes 333 159oz (3PGM+Au) On-mine cash costs R199 680/kg Capex F09 R370 million Reserves 8.1 Moz* Resources 25.7 Moz* LOM 18 years* *Financial year 2009 7 Booysendal – the best address 1A 1B 14.5km 1D 1C
Slide 5: Feasibility study optimisation objectives; Timeline to steady-state operations
Feasibility study optimisation objectives Mining increase production throughput accelerate production build-up reduction of shaft head cost Optimised Feasibility footprint footprint Concentrator align plant throughput with increased mining production align construction schedule for con
Slide 6: Project capital and production build-up
Stockpile build up and mill start Additional 1 065 000t milled by Feb 2014 11 Project capital and production buildup 2 000 2 500 1 800 1 600 2 000 1 400 R m illion 1 200 1 500 Ktpm 1 000 800 1 000 600 400 500 200 0 0 2010 2011 2012 2013 2014 2015 Production build-up (ktpm) Initial capex (Rm) 12 12
Slide 7: Projected cash flow; Other optimisation results
Projected cash flow Annual cash flow 2 500 000 2 000 000 1 500 000 1 000 000 500 000 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 -500 000 -1 000 000 -1 500 000 -2 000 000 -2 500 000 Sales Sales Opex Opex State StateRoyal royalty Mining Tax Mining tax Capital Capital Witholding WithholdingTaxtax 1
Slide 8: Investment case
Investment case Only mid-tier, independent, intergrated mine-to-market producer Cash generative and profitable Prospect of growing production by more than one third Potential for corporate activity Consensus recommendation - BUY 100% 8% 90% 20% 80% 40% % recommendations 38% 33% 70% 20% 60% 6
Slide 9: Registered office
Registered office 1st Floor 1A Albury Park Magalieszicht Avenue Dunkeld West 2196 Johannesburg South Africa PO Box 412694 Craighall 2024 South Africa Telephone +27 11 759 6000 Facsimile +27 11 325 4795 Email Rene.Rautenbach@norplats.co.za marion@rair.co.za Website www.northam.co.za NORTHAM PLATINUM