Slide 1: HVAC Know-how on the road
HVAC Know-how on the road ___________________ Training Belimo Austria
Slide 2: Presentations Belimo training van
Presentations Belimo training van Part 1 (page 2): Company presentation Part 2 (pages 4-16): Standards (taxonomy, CSRD, EPBD, etc.) Part 3 (pages 17-41): RetroFIT+ Part 4 (pages 42-66): Plant manufacturer concept Part 5 (page 67-79): VAV ZoneEase
Slide 3: Field devices for the energy-efficient control of HVAC systems
Field devices for the energy-efficient Room control of HVAC Room comfort systems Water Cooling Tower Founded in 1975 Headquarters: Hinwil, Switzerland Cooling Plant Listed on the Swiss Stock Exchange (SIX) since 1995 Heating system More than 2,400 employees in 80+ countries on all continents Global
Slide 4: Standards, guidelines, etc.
Standards, guidelines, etc. EU taxonomy ESG EPBD etc.
Slide 5: EU regulations – Why?
EU regulations – Subsidy programmes Why? Laws Refurbishment rate Market solutions as the key to success 5
Slide 6: EU Climate Protection Act
Targets not e.g., European Climate Law, EU EU taxonomy specific to the Carbon Border Adjustment Definition of ecologically sector Mechanism sustainable economic activities e.g., Renewable Energy Directive Energy (RED II), Energy Efficiency Sustainable Directive (EED) finance Corporate Sustainability
Slide 7: EU taxonomy
Regulation governing the economic activity of companies with regard to sustainability through six environmental targets; including: Adaptation to climate Climate protection change Environmental target 1: significant Sustainable utilisation Transition to a circular of water resources economy cont
Slide 8: EU taxonomy: substantial contribution to climate change mitigation
New Building Refurbishment Acquisition and ownership The primary energy Two variants: Built after 31. December 2020: the Substantial contribution to requirement (PED) is at least a) The building refurbishment building fulfils the requirements for climate change mitigation 10% below the threshold ful
Slide 9: CSRD
Is the guideline for the reporting standard, linked to the EU taxonomy The CSRD is intended to ensure that investors and other interest groups have access to information on the impact of companies subject to reporting requirements on people and the environment Mandatory / date: Starting 2025 (
Slide 10: ESG
As a reporting instrument, part of the CSRD Three categories: Environmental Social Governance (corporate governance) ESG reporting ≠ Sustainability report ESG reporting is more detailed Controlled by CSRD obligations PLEASE NOTE: There may also be an "indirect" reporting obligati
Slide 11: EPBD Directive
EPBD Directive = Energy Performance of Buildings Directive Measure from the Green Deal: Building sector to be decarbonised by 2050 Improving the energy efficiency of buildings through refurbishment: MEPS = Minimum Energy Performance Standards Financing: the EU Commission must present a s
Slide 12: EN ISO 52120-1
Target: complete decarbonisation for existing buildings (rapid refurbishment) and new buildings (zero-emission buildings) by 2025 Planning Inventory New Building Other • National refurbishment • Effective date: 2020 • Specification of the • Mobility plan • Refurbishment rate zero-emission building -
Slide 13: Energy demand and supply model
Complete system view Energy demand and supply model Energy flow Measurements for correct power control Consumer Energy-efficient system behaviour Distribution Generation Consumer Consumer Closed-loop Consumer control EPBD Consumer Via EN ISO52120-1 Energy requirement EN ISO52120-1 = Building a
Slide 14: Question 07: Hydronic balancing
Hydronic balancing (heat distribution) Class How is hydronic balancing carried out in the heat distribution system? If there Functional description are more than ten heat exchangers, then this question also includes (text for tender/specification) WG NWG balancing between groups of ten heat exchange
Slide 15: Question 06: Control of circulation pumps
Control of circulation pumps Class Functional description How are the circulation pumps operated (with respect to the "on" and "off" (text for tender/specification) WG NWG states or the speed)? [ISO 52120-1:2021; 1.4] As Tar is get O O a) No automatic control (e.g., pumps in The circulation pumps ar
Slide 16: Great savings potential through building automation
Hotel Educational building Hospitals 32% 20% 14% Restaurants Shopping Centres Office Building EN ISO 52120-1 Great savings 32% 40% 30% potential through Source: FH Aachen DE building automation Savings potential through the use of an A-class system in comparison with the C-class reference. 16
Slide 17: RetroFIT+
RetroFIT+
Slide 18: Is your building one of the 90% with inefficient operation?
Is your building one of the 90% with inefficient operation? Harald Kreuter 0664 8585924 Belimo Austria
Slide 19: Why operate buildings properly?
Why operate buildings properly? Statutory Economic Technological Market demand Social and requirements incentives innovation and environmental competitiveness responsibility RetroFIT+ Presentation 2025 19
Slide 20: Limiting global warming – Climate-neutral!
Limiting global warming – Climate-neutral! Paris Climate Agreement (2015) EU environmental policy Austrian climate targets 55% 0% CO₂ 2015 2030 2040 Refurbishment rate 3x more - NECESSARY RetroFIT+ Presentation 2025 20
Slide 21: The huge potential in the building stock
The huge potential in the building stock 2,400,000 buildings (Austria) 16% (Co2) HVAC systems not optimally operated 90% of the time (global) RetroFIT+ Presentation 2025 21
Slide 22: Why this potential?
Why this potential? Comfort not Energy consumption CO2 load too high guaranteed too high Incorrect dimensions Not very efficient Regulation too Maintenance of the Valves Pumps simple systems Pipes Fans Air/water circuits Awareness Air heaters / air coolers … Pump/fan control Skil
Slide 23: Investment options for energy optimisation
Investment options for energy optimisation Improvement of building Optimisation via intelligent Replacement for plants envelope field devices and automation Savings potential Savings potential Potential savings from 10-60% up to 50% up to 30% Return on Investment Return on Investment Return on Inves
Slide 24: RetroFIT+ the quick wins in building optimisation
RetroFIT+ the quick wins in building optimisation RetroFIT+ HVAC system 100% Automation Optimisation 10% Upgrade Improve Field devices ~4% RetroFIT+ Presentation 2025 24
Slide 25: HVAC field devices and automation
HVAC field devices and automation Optimisation via intelligent field devices and automation Energy Electricity ? Savings potential up to 30% Return on Investment CO₂ Money 2 to 10 years RetroFIT+ Presentation 2025 25
Slide 26: HVAC assessment
HVAC assessment EN ISO 52120-1 A Demand-controlled Effects on energy B Presence-controlled efficiency C Time-controlled Building automation DManually controlled Building control Building management, etc. RetroFIT+ Presentation 2025 26
Slide 27: EN ISO 52120-1: Energy efficiency of building automation
EN ISO 52120-1: Energy efficiency of building automation Building automation Highly efficient A Demand-controlled Higher quality Default B Presence- controlled Office School Hotel None Variable Variable pump Occupancy Trades occupancy control detection Heating C Time-controlled Variable Adaptive Var
Slide 28: Question 07: Hydronic balancing
EN ISO 52120-1: Energy efficiency of building automation Hydronic balancing (heat distribution) Class How is hydronic balancing carried out in the heat distribution system? If there are more Functional description than ten heat exchangers, then this question also includes balancing between groups of
Slide 29: BA Efficiency ISO 52.120
EN ISO 52120-1: Energy efficiency of building automation Trades Heating Ventilation Cooling Light and more… Office School Hotel Office School Hotel Reduction potential Reduction potential thermal energy electrical energy Completely A+ Addl. Prog. + + + + + + optimised A Demand-controlled 0.70 0.80 0
Slide 30: EN ISO 52120-1: Savings potential by building type
EN ISO 52120-1: Energy efficiency of building automation Hotel Educational building Hospitals Savings potential through the use of an A- class system in comparison with the C- class reference. 32% 20% 14% Restaurants Shopping Centres Office Building 32% 40% 30% Source: FH Aachen DE RetroFIT+ Present
Slide 31: HVAC assessment
HVAC assessment RetroFIT+ Presentation 2025 31
Slide 32: Innovation project for early replacement of heating groups
Innovation project for early replacement of heating groups Research and development Lemon Consult RetroFIT+ Presentation 2025 32
Slide 33: Innovation project: participants and initial situation
Innovation project for early replacement of heating groups Project participants Innovation project Federal Office of Energy Initial situation Lemon Consult AG – Engineering office The current state of research shows that heat pumps are oversized, i.e. larger than necessary, when Allgemeine Baugenoss
Slide 34: Project hypothesis
Project hypothesis Existing system New system Heat pumps are based on incorrect assumptions Inefficient settings and are therefore often oversized Hydronic balancing not observed, because of sufficient burner output Thesis For properties with multiple heating groups, it makes economic and ecological
Slide 35: Evaluation of the objects
Evaluation of the objects Allgemeine Baugenossenschaft Zürich (ABZ) Baugenossenschaft Rotach Zürich Zweierstrasse Rotach District 1 x 250 kW condensing gas boiler 2 x 1.2 MW condensing oil boilers 3 valves (heating groups) and a measuring 10 valves (heating groups) and three point for domestic hot w
Slide 36: Procedure
Procedure September 2023 Heating distribution Conversion work on heating manifolds Zweierstrasse 1. Part heating period 23/24 Measurement unregulated state January 2024 Optimisation with Belimo Energy ValveTM 2. Part heating period 23/24 Measurement in optimised state May 2024 Results Before After r
Slide 37: Result savings in heating capacity
Result savings in heating capacity Savings in heating capacity Savings in heating capacity Rotach ABZ Zweierstrasse District 250 2.400 -25.3 % -29.5 % 75 729 56 514 Installierte Leistung vor eBO Leistung nach Installierte Leistung vor eBO Leistung nach Leistung [kW] [kW] eBO [kW] Leistung [kW] [kW]
Slide 38: Investment costs, Zweierstrasse
Investment costs, Zweierstrasse Replacement with air-to-water heat Replacement with geothermal probes pump heat pump 2'500'000 2.500.000 2'500'000 2.500.000 2’348’619 Investment costs in CHF Investment costs in CHF 2'500'000 2.000.000 2'500'000 2.000.000 Investitionskosten [CHF] 1'500'000 1.500.000
Slide 39: Key takeaways
Key takeaways RetroFIT+ Presentation 2025 39
Slide 40: Key takeaways
Key takeaways HVAC components and regulation • Quick wins in energy and CO2 reduction Evaluate/correct hydronics first • Tackle how heat is generated in the second step Collaboration with RetroFIT+ specialists • Specialist companies, Belimo, Belimo-RetroFIT+ Partners Is your building (park) still on
Slide 41: Energy-efficient hydronics
Energy-efficient hydronics
Slide 42: Das Konzept «Anlagebau» von Belimo
Das Konzept «Anlagebau» von Belimo BELIMO
Slide 43: How can the "Plant manufacturer" concept support our customers?
How can the "Plant manufacturer" concept support our customers? We need simple and clear solutions that take the pressure off skilled workers The Belimo application library replaces the hydronic concept Ready-made draft plans with part lists and bills of material items reduce the planning effo
Slide 44: "Plant manufacturer" concept: value chain
"Plant manufacturer" concept Value chain "Belimo hydronics configurator" (database-based) Investors Consulting Plant Operators Project developer Systemintegrator FM engineers manufacturer Concept "Plant Increase order quality Obtain tender texts, Templates for SW-based Templates for SW- Ke
Slide 45: Applications
Applications Possible applications for pressure-independent valves
Slide 46: Hydronic systems: partial load operation and efficiency potential
Over 90% partial load operation – designed for full load! Statically balanced hydronic systems Oversupply or undersupply to systems Suitable regulating devices and fittings Demand-controlled pump performance Hydronic Integration into building automation system Great potential with respec
Slide 47: Hydronics application (pressurised, 2-way)
Heating and cooling groups Supply temperature control Air heater or air cooler Applications with risk of freezing Glycol monitoring Hydronics application (pressurised, 2-way) Throttle and injection circuit with Energy Valve / EPIV Operation independent of temperature and differential pressur
Slide 48: Hydronics application (depressurised, 3-way)
Heating groups Weather-compensated supply temperature control Supply air temperature control with heating coil Hydronics application (depressurised, 3- way) Mixing circuit with the Energy Valve
Slide 49: Hydronics application (closed control loop)
Benefits of the combination flow measurements on the valves Valve opening defines effective pump operation Permanent pump speed optimisation while maintaining a constant water volume Desired water volume > Heating or cooling output Hydronics thus ensured at all times application (closed cont
Slide 50: Belimo hydronics configurator
Belimo hydronics configurator
Slide 51: "Plant manufacturer" concept (plant manufacturer)
"Plant manufacturer" concept (plant manufacturer) e.g., Plancal data set Energy monitoring Continuous pressure- independent
Slide 52: "Plant manufacturer" concept (System integrator)
"Plant manufacturer" concept (System integrator) e.g., RR dataset Basis for, e.g., switch cabinet construction
Slide 53: "Plant manufacturer" concept in the mini-van
Single room control EZR CQ1,2,3, changeover switch of the water volume between heating/cooling Calculation of the water volume based on the positions of the CQ actuators CQ1 CQ2 CQ3 T1 EV1 P2 "Plant manufacturer" 1. RT/AT (simulation), guided supply temperature concept 2. P2 Pump optimisation functi
Slide 54: Energy manifold
Energy manifold Digital commissioning Pressure-independent 54
Slide 55: Air handling unit in a mini-van
M1 SUP-VAV ETA-VAV ZoneEase control changeover Application 8 = CO2 control Application 9 = VAV control T2 P1 RT setpoint / actual value EV3 CO2 setpoint / actual value Air handling unit in a 1. RT control with cascade supply temperature mini-van 2. P3 Pump optimisation function, evaluation of EV2 an
Slide 56: Ventilation (in the zone)
Frequency converter (Speed control) Demand FC VAV units 50% CO2 °C Fan Optimiser System 80% VOC °C Ventilation (in the zone) °C 0% Fan Optimiser Rooms Poor point control by Field bus means of feedback of the damper position (VAV)
Slide 57: Creating transparency
Creating transparency Electronic pressure-independent characterised control valve with energy monitoring – Belimo Energy Valve
Slide 58: Use of heating and cooling energy
M Q=? M Q=? How much energy is actually M Q=? needed? M Q=? Use of heating Does every consumer get the amount of energy they need? and cooling energy Energy manifold essential for energy efficiency and user comfort 58
Slide 59: Belimo Energy Valve
Energy-efficient operation Data collection Belimo Energy Valve Energy Valve Optimisation/maintenance Evaluation/monitoring All-in-one solution 59
Slide 60: Low delta T syndrome – The problem
Power output Power output Q' Delta T No increase in power output Saturation of the heat exchanger • Reduced delta T Pump delivers more water Reduced efficiency Low delta T syndrome – The problem Flow rate NO increase in power output Excessive volumetric flow reduces the Temperature spread decreases
Slide 61: Avoidance of "Low delta-T syndrome"
Avoidance of "Low delta-T syndrome" Power output Q' Delta T No low delta T syndrome Saturation No operationof in the saturation heat exchanger Securing differential temperature Reduced pump work Low delta T syndrome Lower delta T Increase in efficiency – The solution! limit value Flow rate The delta
Slide 62: Monitoring
Monitoring "What cannot be measured cannot be • Energy valve DN32 heating coil ventilation controlled!" • Data range: 2016-11-01 - 2017-04-01 • Setting: Vmax: 4.4 m3/h (Peter Drucker) • Flow Control 62
Slide 63: Delta T management
Saturation range Vmax: 2.15 m3/h Differential temperature: Approx. 30 K Delta T management • Energy valve DN32 heating coil ventilation Integrated energy • Data range: 2016-11-01 - 2017-04-01 monitoring on the • Setting: Vmax: 4,4 m3/h Energy Valve • Flow control 63
Slide 64: Pressure-independent solutions from Belimo
Pressure-independent solutions from Belimo 64
Slide 65: Pressure-independent valves
Pressure-independent flow limiter valve The ideal application for pure open/close applications. PIFLV Pressure-independent limitation even without actuator Pressure-independent quick compact valve The ideal solution for an energy-saving, malfunction-free zone control PIQCV Pressure-independent 6-way
Slide 66: ZoneEase (VAV)
ZoneEase (VAV) Belimo ZoneEaseTM VAV – the facts Application overview Typical applications Ecosystem overview / Technical data Workflow description / Cloud interface and Excel Q&A
Slide 67: The simplest zone solution – ZoneEase
The simplest zone solution – ZoneEase full integration of: VAV (master), room operating unit, zone valve (QVC), etc.
Slide 68: ZoneEase – the Ecosystem
ZoneEase VAV controller Room operating units and Duct sensors 5/10 Nm display app (temp. / CO2) ZoneEaseTM – the Additional VAV controller Zone valve actuator Ecosystem 5/10 Nm (2P or modulating) Actuators and sensors for self-sufficient single room control
Slide 69: ZoneEase – the Ecosystem: principle structure
Tool BMS Project Change Management CBA Site Editor OEM Data Protection MSTP RTU Parameter export/import by Excel (Roundtrip) GDPR Compliance MP address No.8 T HVAC application: ZoneEaseTM – the Temperature and/or CO2 control L/NMV-D3-MP Ecosystem T • 10 Nm torque actuator ZoneEase VAV as s
Slide 70: ZoneEase Ecosystem: actuators and sensors in detail
LMV/NMV-BAC-001 CQ24A-MPL-A8 5/10 Nm VAV control actuator Valve actuator for reheaters BACnet MS/TP or Modbus RTU Application-specific MP-Bus Integrated dp sensor communication Pluggable terminals NFC unpowered/electrically powered 22DC11 – CO2 duct AI for external sensor (temp
Slide 71: ZoneEase Ecosystem: room operating units in detail
ZoneEase VAV room operating ZoneEase VAV room operating units with ePaper touch display units with virtual display Variants: Variants: P-22RT-1T00D-1 – Room P-22RT-1T-1 – Room temperature temperature P-22RTH-1T-1 – Room temperature P-22RTH-1T00D-1 – Room + relative humidity temperature +
Slide 72: ZoneEase application overview
Air quality (CO2) and volumetric flow Room comfort with parallel fan control [10] Cooling only [08] Indoor air quality control (CO2) [11] Cooling + 1-stage electric reheater [09] Volumetric flow control (VAV) [12] Cooling + 2-stage electric reheater [13] Cooling + on/off hot water reheater [14] Cool
Slide 73: ZoneEase Application overview (ID08)
ZoneEaseTM °C Application overview (ID08) CO2 Air quality control/CO2 measurement with room operating unit
Slide 74: ZoneEase Application overview (ID08)
CO2 ZoneEaseTM °C Application overview (ID08) Air quality control/CO2 measurement with duct sensor
Slide 75: ZoneEase Application overview (ID18)
+ °C ZoneEaseTM Application overview °C (ID18) CO2 Cooling/heating and modulating water reheater
Slide 76: ZoneEase IoT features
ZoneEaseTM IoT features Cloud front end Project and documentation management
Slide 77: ZoneEase IoT features: planning and commissioning
1 XLS directly in the Cloud or through XLS template Project export 2 Upload into the Belimo ZoneEase app 3 VAV unit manufacturing and calibration at the OEM factory Commissioning 4 Download into the ZoneEase controllers ZoneEaseTM via NFC through room units or directly IoT features Progress tracking
Slide 78: Slide 78
Slide 79: BELIMO