Green River Gold Corp · CSE:CCR
Green River Gold — Investor Presentation (June 2023)
31 slides from Green River Gold's investor presentation, June 2023
Slide 1: Green River Gold Corp.
GREEN RIVER GOLD CORP. CSE: CCR June 2023 OTC PINK: CCRRF
Slide 2: Disclaimer
Disclaimer Some of the statements contained in this presentation may be deemed “forward-looking statements.” These include estimates and statements that describe the Company’s future plans, objectives or goals, and expectations of a stated condition or occurrence. Forward-looking statements may be i
Slide 3: Property Location
Property Location British Columbia has the world's largest concentration of exploration companies and mining professionals for excellent reason: Mining-Friendly Regulations Stable Political Environment Carbon Neutral Hydro Electricity Eco-Friendly Rail Lines Top-Ranked Mining Jurisdiction Respect fo
Slide 4: Investment Highlights
Fontaine Gold Project Leadership Track Record Leadership combined of over 60 years technical experience and over 30 years Capital Market Highly Prospective Gold Project experience. located in renowned mining district Close proximity to all major infrastructure. 50km east of Quesnel, BC accessible by
Slide 5: Quesnel is a city located in the Cariboo Regional District of British Columbia
Quesnel is a city located in the Cariboo Regional District of British Columbia, Canada. It is situated midway between the cities of Prince George and Williams Lake and is on Highway 97, the main route to northern British Columbia and the Yukon. Quesnel sits at the confluence of the Fraser River and
Slide 6: Property Location
Property Location The Fontaine Gold Project can be reached in 45 minutes from Green River Gold Corp's Operations building and is only 42.5 kilometers from the city of Quesnel. The Property is easily accessible along highway #26 and a well- maintained forest service road. PROPERTY FEATURES Rail Airpo
Slide 7: Property Map
Property Map Green River Gold Corp. recently doubled it's land package in the Historic Cariboo Gold district. The Fontaine Gold project now covers 20,438.19 hectares (over 200 sq. km) of land and is made up of 36 claims. Which includes the recently staked additional 110 sq. km of land to expand expl
Slide 8: Adjacent Properties
Adjacent Properties •Osisko Development •Omineca Mining •Imperial Metals •Spanish Mountain Gold •Karus Gold •Taseko Mines (Gibraltar Mine) 8
Slide 9: Fontaine Gold Project
Fontaine Gold Project The Fontaine Gold Project ("The Project") Strike Length 30 km x width 13 km The Project has similar structures, lithology and alteration to Osisko ’s Cariboo Gold Project (5.3 Moz) Bedrock on trend with Omineca’s Wingdam Gold Project. Omineca conducted a test bulk sample extrac
Slide 10: Geological Setting
Geological Setting The Fontaine Gold Project is located in the Quesnellia Terrane; part of the Intermontane Belt. Quesnellia (QN on the map), is part of the Canadian Cordillera and formed a volcanic arc during the Mesozoic era (Triassic to Jurassic periods). Quesnellia contains numerous alkalic copp
Slide 11: Investment Highlights
Quesnel Nickel Project Highly Prospective Nickel Cobalt Project located in renowned mining district Leadership Track Record Close proximity to all major infrastructure. Leadership combined of over 60 years technical 50km east of Quesnel, BC accessible by paved experience and over 30 years Capital Ma
Slide 12: Property Location
Property Location The Nickel Cobalt Project can be reached in 45 minutes from Green River Gold Corp's Operations building and is only 42.5 kilometers from the city of Quesnel. The Property is easily accessible along highway #26 and a well- maintained forest service road. PROPERTY FEATURES Rail Airpo
Slide 13: Nickel Projects in North America
Nickel Projects in North America To date, most other large projects are based on supply to stainless steel markets. 13
Slide 14: Geophysics Survey
Geophysics Survey In 2021 and 2022, drone- based UAV magnetic surveys were conducted. The surveys outlined a strong magnetic anomaly in the Project area. The anomaly is shown as the color purple on the adjacent map. We are calling this the Deep Purple Target. 14
Slide 15: Zone 1 Outcrop
Zone 1 Outcrop 15
Slide 16: Zone 1 Assay Results / Metallurgical Results
Zone 1 Assay Results Zone 1 Metallurgical Results The mineral abundance by weight (wt%) is 50.7 % talc, 27.1% dolomite, and 12.8% serpentine. For the nickel distribution, 97.8% of the nickel composites are in pentlandite and 2.15% of nickel composites are in pyrrhotite. The core sample measured 0.3%
Slide 17: Zone 1 Metallurgical Test Results
Zone 1 Metallurgical Test Results Drill core samples were sent to Base Metallurgical Laboratories Ltd., Kamloops, British Columbia. This program determined the mineral composition and nickel distribution in the core sample. The analytical results indicate that: Pentlandite was the main nickel minera
Slide 18: Talc Potential
Talc Potential Finding significant amounts of Nickel along with a large quantity of Talc is rare although not unheard of. The potential economics of the combined commodities could prove to be robust. Normally, mining a relatively low-grade Nickel deposit even at surface involves removing and treatin
Slide 19: Zone 2 Assay Results
Zone 2 Assay Results Nickel Chromium Cobalt | Magnesium Hole Number | Meters Drilled | Average % | Average% | Avreage % | Average % FCD-22-01 From 0 to 5.9 0.174 0.174 0.011 20.50 FCD-22-02 From 0 to 2.0 0.191 0.252 0.011 21.80 FCD-22-03 From 0 to3.0 0.177 0.196 0.010 21.40 FCD-22-04 From 0 to 5.3 0
Slide 20: Assay Results from the Alteration Zone of Drill Hole WK-23-01
Assay Results from the Alteration Zone of Drill Hole WK-23-01 A semi-massive sulphide alteration zone was encountered between 47.4m and 50.8m with the following assay results: 7583 Grams per Tonne Zinc 4340 Grams per Tonne Lead 5.3 Grams per Tonne Silver 0.158 Grams per Tonne Gold 20
Slide 21: 2023 Drill Program
2023 Drill Program To Expand Along Strike Between Zone 1 and Zone 2 and to Depth Initially, 5 drill holes are planned with a target depth of 300 meters each spaced along the anomaly to determine the depth and extent of the mineralized area. An additional 5 drill holes are planned with a target depth
Slide 22: Conceptual Structure
Conceptual Structure 22
Slide 23: Zone 1 Thrust Fault
Zone 1 Thrust Fault 23
Slide 24: Geological and drilling map
Geological and drilling map Nickel on the property is hosted in ultramafic rocks, mainly black phaneritic peridotite, belonging to the Slide Mountain Terrane (Crooked Amphibolite). The peridotite exhibits intense serpentine alteration and strong brecciation. Talc alteration occurs along quartz-calci
Slide 25: Milestones 2023/2024
Milestones 2023/2024 Q1/Q2 Q3 Q4/Q1 (2024) Mineralogy and Complete NI-43-101 Long hole permit Recovery results Compliant Resources approval expected expected Estimate for Zone 1 Q1/Q2 Q3/Q4 Q4/Q1 (2024) Complete Zone 1 Complete long hole drill Complete Preliminary drilling program program Economic A
Slide 26: Kymar Silver Project
Kymar Silver Project Kymar Silver property consists of 1625 hectares located approximately 28 kilometers west of Invermere, BC. Majority of this property is 100% owned by Green River Gold Corp. Eight previous mineral exploration and production records in the property could be traced from BC Minfile.
Slide 27: KaLi Pegmatite Project
KaLi Pegmatite Project The KaLi Pegmatite Project is located approximately 30 km North-West of Clearwater, BC. in the South Cariboo region of central British Columbia, Canada. The property is made up of one mineral tenure totaling 1059.53 hectares. This property is owned 100% by Green River Gold Cor
Slide 28: Capital Structure
Capital Structure Description Value Share Price & Share Volume Performance - Previous 5 Years Ticker Symbol: CCR 52 Week high/low: $0.85/$0.040 Basic Shares Outstanding: 111.5 Million 7.1 Million Options: At $0.07 42.1 Million Warrants: Avg. $0.11 Unsecured Convertible $0.1 Million Maturing Sept. 20
Slide 29: Technical Team
Technical Team PERRY LITTLE – PRESIDENT, CEO AND DIRECTOR SHAWN STOCKDALE – CFO, SECRETARY AND DIRECTOR KYLE TOWNSEND Project Manager Mr. Kyle Townsend's background in the mining and exploration industry started with his personal prospecting projects and evolved to consulting for various mining orga
Slide 30: Board of Directors
Board of Directors PERRY LITTLE President, CEO & Director Mr. Perry Little, B.A. (Econ), CIM, has extensive experience with junior resource company financing and with the public markets in general. His experience was gained over the course of a 28-year career in the investment industry. During his c
Slide 31: Investor Relations Inquiries
Investor Relations Inquiries CSE: CCR Perry Little President, CEO & Director OTC Pink: CCRRF 1-780-993-2193 perry.little@greenrivergold.ca Website: www.greenrivergold.com