  1. Slide 1: Increasing our focus on organic growth

    Increasing our focus on organic growth Noosa Mining Investor Conference July 2024 ASX:CYL catalystmetals.com.au

  2. Slide 2: Catalyst’s Asset Portfolio

    Catalyst’s Asset Portfolio CATALYST METALS LIMITED Controls three Australian gold belts, driving an attractive organic growth pipeline Group Production Group AISC Group Reserves Group Resources 110koz pa1 $2,352oz 793koz @ 3.3g/t2 3.3Moz @ 3.0g/t2 (JORC) (JORC) 0.8Moz @ 2.8g/t3 (NI 43-101) OPERATING

  3. Slide 3: Plutonic Gold Mine

    WESTERN AUSTRALIA Plutonic Gold Mine

  4. Slide 4: Plutonic Gold Mine

    Plutonic Gold Belt 40km Haul Road PLUTONIC GOLD MINE 12 months of ownership under Catalyst PHB K2 Hub & Spoke Strategy Production increasing, Trident 508koz @ 3.7g/t High Grade Resource 107koz @ 8.9g/t Consolidation allows regional development projects to be processed at costs falling Trident Cinnam

  5. Slide 5: What we have been doing since taking ownership of Plutonic

    What we have been doing since taking ownership of Plutonic in July 2023 PLUTONIC GOLD MINE Step change in Plutonic operations Focus on execution Re-investment and balance sheet repair • New management team • $28m debt repaid; $13m working capital improvement • Focus on small set of key KPI’s • 10 ne

  6. Slide 6: Gold production up 46%; stoped tonnes mined up 47%

    Gold production up 46%; stoped tonnes mined up 47% PLUTONIC GOLD MINE Step change in Plutonic operating performance under Catalyst Catalyst took control of Gold produced +46% Plutonic on 1 July 2023 Average 21koz Since then, there has been a deliberate step change in performance Average 14koz Stope

  7. Slide 7: Processing up 47%; Development metres up 26%

    Processing up 47%; PLUTONIC GOLD MINE Development metres up 26% Step change in Plutonic operating performance under Catalyst Underground Mine Development Metres Average • Plutonic mill capacity 1.8Mtpa +26% 2,208m • Current run rate 1.25Mtpa Average 1,754m • +0.5Mtpa capacity available for growth pr

  8. Slide 8: Production drilling up 79%; Total material movement up 45%

    Production drilling up 79%; PLUTONIC GOLD MINE Total material movement up 45% Step change in Plutonic operating performance under Catalyst Total Material Moved +45% Average 415kt Production drilling has increased due to: Average 286kt • Drilling larger stopes • Lower rig movement/repositioning Q1 22

  9. Slide 9: Consequences of the step change in Plutonic’s performance

    Consequences of the step change in Plutonic’s performance

  10. Slide 10: A$54m generated from group operations over twelve months

    A$54m generated from group operations over twelve months CATALYST METALS LIMITED Operational cash flows expected to continue, building future cash reserves A$54m operational cashflows generated after capex Used to clean up legacy items and reduce debt and corporate costs such as A$41m debt and credi

  11. Slide 11: Plutonic Gold Belt Project Pipeline

    WESTERN AUSTRALIA Plutonic Gold Belt Project Pipeline

  12. Slide 12: Growing in-mine exploration areas at Plutonic

    Growing in-mine exploration areas at Plutonic CATALYST METALS LIMITED 7.2Moz1 gold mineral endowment to date and growing • 35-year operating history, further extensions likely • Ongoing review of in-mine exploration areas beginning to yield results Zone C Historical drill intercepts in virgin areas

  13. Slide 13: Baltic Extension

    CATALYST METALS LIMITED Baltic Extension Infill drilling Stage 1 planned Drill Program Baltic Extension MRE is currently 105koz at 2.7g/t Au Infill drill program requires only 50m of development Stage 2 Drill Program - 300 600 900 1,200 ASX:CYL Untested 13 Au ounce per vertical metre 13 (10m increme

  14. Slide 14: Trident gold project – targeting first production in 2025

    Trident gold project – targeting first production in 2025 PLUTONIC PROJECT DEVELOPMENT Low capital intensity project development Annual production profile Base Case# Spot case (A$2,700/oz) (A$3,400/oz) 60,000 6.0 50,000 5.0 Gold produced (oz) NPV7 $Am 100 198 40,000 4.0 Grade (g/t) 30,000 3.0 20,000

  15. Slide 15: Catalyst Metals Limited

    16 15 ASX:CYL CATALYST METALS LIMITED 15

  16. Slide 16: Plutonic East – first ore from 2025

    Plutonic East – first ore from 2025 CATALYST METALS LIMITED All approvals in place to recommence mining, dewatering underway, drilling program commenced Surface grade control drilling already underway ASX:CYL Plutonic East historical production 137koz at 5.3g/t1 16 Average production 30koz pa 16 (1)

  17. Slide 17: Plutonic East

    Plutonic East CATALYST METALS LIMITED Dewatering rapidly advancing – four months of rehabilitation commencing August 2024 ASX:CYL 17 17

  18. Slide 18: Plutonic East Decline

    Plutonic East Decline PLUTONIC PROJECT DEVELOPMENT Dewatering progressing ASX:CYL 18 18

  19. Slide 19: Corporate Overview

    Corporate Overview CATALYST METALS LIMITED Capital Structure Board of Directors Share Price (16 July 2024) $1.62 David Jones AM Robin Scrimgeour Shares on Issue 225m Non-Executive Chairman Non-Executive Director Market Capitalisation A$364m James Champion de Crespigny Bruce Kay Managing Director & C

  20. Slide 20: Contact

    Contact Craig Dingley Catalyst Metals E: admin@catalystmetals.com.au T: +61 8 6107 5878 Fiona Marshall Strategic Communications White Noise Communications E: fiona@whitenoisecomms.com T: +61 400 512 109

  21. Slide 21: Appendix 1: Group Reserves and Resources

    Appendix 1: Group Reserves and Resources APPENDICES Reserves Proven Probable Total Ore Reserve Tonnes (Mt) Grade (g/t Au) Ounces (koz) Tonnes (Mt) Grade (g/t Au) Ounces (koz) Tonnes (Mt) Grade (g/t Au) Ounces (koz) Henty1 - - - 1.0 3.6 115 1.0 3.6 115 Plutonic 3 - - - 5.2 2.9 490 5.2 2.9 490 Trident

  22. Slide 22: Important Notices

    Important Notices IMPORTANT NOTICE AND DISCLAIMER This investor presentation (the Presentation) is dated 17 July 2024. It has been prepared by Catalyst Metals Limited (ASX: CYL) (Catalyst or the Company). SUMMARY INFORMATION This Presentation contains summary information about Catalyst its respectiv

  23. Slide 23: Disclaimers

    Disclaimers FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS Some statements in this Presentation regarding estimates or future events are forward-looking statements. They include indications of, and guidance on, future matters. Forward-looking statements include, but are not limited to, statements