Volta Resources — Investor Presentation (April 2010)
27 slides from Volta Resources's investor presentation, April 2010

Slide 1: Aggressive West African Gold Exploration
Aggressive West African Gold Exploration -Fast-tracking Toward a Development Decision at Kiaka- April - 2010 Kevin Bullock – President & CEO www.voltaresources.com

Slide 2: Cautionary Notes
2 Cautionary Notes This presentation contains “forward-looking statements” within the meaning of applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold, copper and other minerals and metals, the esti

Slide 3: Short Term Resource Growth, Medium Term Development, Long Term Value
3 Short Term - Resource Growth Medium Term - Development & Production Long Term - Value Production path and huge exploration upside Significant leverage to West African gold Large West African land/project portfolio 9 projects: j t 3 3,649 649 ttotal t l square kil kilometres t Acquired advanced Kia

Slide 4: Market Facts (as at April 1, 2010)
4 Market Facts (as at April 1, 2010) Symbol VTR - TSX Shares Outstanding 104,933,982 Options 6,727,056 (~$5.1MM) Warrants 4 707 692 (~$3 4,707,692 (~$3.9MM) 9MM) Shares Fully Diluted 116,368,730 52 week high/low $0.12/1.46 Current price $1 36 $1.36 Market Capitalization $142.7 MM Cash $11.0MM (~$20.

Slide 5: Management
5 Management Kevin Bullock, President & CEO and Director Professional Mining Engineer. Goldcrest's founding President and CEO since inception. Previously, Iamgold’s Iamgold s General Manager Manager. Until recently was VP VP, Operations for Kirkland Lake Gold Ltd Ltd. where he was instrumental in th

Slide 6: West Africa – a major global gold region still in early days
6 West Africa – a major global gold region still in early y days y Home to numerous world- class gold deposits Stable countries; multi-party democracies Supportive mining codes, informed regulatory regimes Established miningg infrastructure & experienced labour Several new gold d development l t pro

Slide 7: Hidden Value
7 Hidden Value Over 1,300,000 ounces of gold and 724,000,000 lbs of copper in i allll NI 43 43-101 101 categories and growing New Kiaka gold project to add significant ounces by end of June 2010 Market cap of <$150 million! >$11.0 million in cash Enterprise value of ~US$40/oz (incl. Au EQ Cu(1)) off

Slide 8: Current Drilling Projects in Burkina Faso
8 3 Current Drilling Projects in Burkina 3 Main Properties B i Drilled Being D ill d Country Property Metal Target Area Burkina Faso Kiaka Gold KMZ & KHZ Gaoua Copper/ Gongondy, Gold Boussera, Dienemera, Mt. Biri Gold Nassara Kampti Gold Maména-Fofora Gaoua Cu-Au porphyry core

Slide 9: Volta Projects in Burkina Faso
9 Volta Projects in Burkina Faso

Slide 10: Kiaka Gold Project – The Opportunity
10 Kiaka Gold Project– The Opportunity Randgold previously defined a “Geological Resource” of 81.58Mt at 1.01g/t 0 g/ for 2.65Moz 65 ((Non NI 43-101 3 0 compliant)* p ) Volta is currently able to define higher grade portions of the resource Randgold s metallurgical test work suggests recoveries betw

Slide 11: Kiaka Geology and Targets
11 Kiaka Geology and Targets 6 Regional targets identified during regional soil geochemistry – 600m x 200m Targets infilled to 200m x 50m Followed up with selected RAB RAB, pitting and trenching

Slide 12: Kiaka – Nearby Upside Targets
12 Kiaka – Nearby Upside Targets Randgold Wireframes

Slide 13: KMZ – Central Area (with model wireframe)
13 KMZ – Central Area(with model wireframe)

Slide 14: KMZ – Hanging Wall Developing
14 KMZ – Hanging Wall Developing (outside ( model wireframe)) Hanging wall zone is wide on this section and grades > 1.3g/t Au Foot wall zone has 21m intersection Main body is over 150 metres wide on this section

Slide 15: Kiaka – Randgold Wireframe Outlines
15 Kiaka – Randgold Wireframe Outlines KMZ KHZ Plan View 3D View

Slide 16: Kiaka – Positive Development Aspects
16 Kiaka – Positive Development Aspects Positive metallurgy – 194 samples were sent to Loulo by Randgold for CIL/bottle roll metallurgical testing – encouraging gold recovery resultslt rangingi ffrom 80% tto 98% with ith mostt > 90% Higher grade zones - Volta’s closer drill spacing has better define

Slide 17: Kiaka – Proposed Drill Program
17 Kiaka – Proposed Drill Program

Slide 18: Kiaka – Budget & Timeline to June 2010
18 Kiaka – Budget & Timeline to June 2010 $5,000,000 – 6 month Kiaka ‐ Budget Breakdown budget Overhead Costs Personnel Capital Items Exploration Costs 2 diamond drill rigs 1% 9% 1% currently drilling NI 43-101 43 101 resource reportt (to 200 m depth due prior to end of June Pre-feasibility P f ibil

Slide 19: Volta Projects in Burkina Faso
19 Volta Projects in Burkina Faso

Slide 20: Gaoua Copper-Gold Project
20 Gaoua Copper-Gold Project Large land area with 3 contiguous concessions 692.5 km2, with over 35km of strike of mineralized corridor 3 kknown porphyry h d deposits it tto d date, t fourth prospect (Boussera discovered by recent auger drilling) Volta completed a 43-101 resource calculation on Gongo

Slide 21: Gaoua Copper-Gold Project
21 Gaoua Copper-Gold Project Control of Major j Copper-Gold pp Porphyry p y y Corridor Three copper-gold targets identified and drilled to date: over 23,000m of diamond drilling completed Gongondy G d hi highlights: hli ht – 106m @ 0.66% Cu, 0.49 g/t Au – 131m @ 0.38% Cu, 0.80 g/t Au – 129m @ 0.50%

Slide 22: Nassara – A New Gold Discovery
22 Nassara – A New Gold Discovery Southern Boromo Belt shaping up as potentially significant new Birimian gold camp Significant exploration success by Ampella Mining’s Mining s (ASX:AMX) at Konkera on the Batie West project Major artisanal gold rush (+ , 10,000)) at the Tionor prospect p p on Mali G

Slide 23: Nassara – A New Gold Discovery
23 Nassara – A New Gold Discovery New 4 kilometer long gold in soil anomaly Single trench completed prior to rainy season start (in July) Further trenching carried out extending mineralization for a strike of >400 metres Geochemical soil sampling and auger drilling to y magnetic cover full 10km stri

Slide 24: Volta Projects in Burkina Faso
24 Volta Projects in Burkina Faso

Slide 25: Kampti Gold Project
25 Kampti Gold Project Extensive artisanal mining at Maména – >5,000 artisanal miners moved onto Maména since discovery. A further 5,000 within concession Over 65 gold-bearing quartz veins and mineralized systems covered by over 1 000 artisanal pits 1,000 pits, trenches and shafts Initial RC drill p

Slide 26: Kampti Reverse Circulation Drill Program – June 2009
26 Kampti Reverse Circulation Drill Program – June 2009 20 holes (1,500m RC drilling) confirm mineralization in all 3 Target Zones tested Significant grades over widths ranging between 5 and 41m have been returned by 4 of the 5 holes drilled in Target Zone B Drill highlights from June program are: –

Slide 27: What to Look For
27 What to Look For Kiaka - Drill, Drill, Drill....! 22 000 m program began end of 22,000 November Establish resource at Kiaka by June Drilling at Gaoua between Dienemera and Gongondy (Boussera) and Gongondy West jjust completed p – results awaited Further soil sampling and trenching at Nassara, fol
Source: Internet Archive copy of voltaresources.com