Kinross Gold Corporation · TSX:K

Kinross Gold — Denver Gold Forum 2008

15 slides from Kinross Gold's conference presentation, Sep 10, 2008

  1. Slide 1: Denver Gold Forum

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Denver Gold Forum September 7-10th, 2008 DELIVERING DISCIPLINED GROWTH 1 Cautionary Statements All statements, other than statements of historical fact, contained or incorporated by reference in this presentation, including any inform

  2. Slide 2: Kinross Today

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Kinross Today ƒ Pure gold and silver producer – Policy of no gold hedging – No base metals credits in financial results ƒ US$9.6 bn market cap. (“K” TSX, “KGC” NYSE)* ƒ 1.8 to 1.9 mm oz. of production in ’08(1) – Growing to 2.4mm oz.

  3. Slide 3: Superior Production Growth Profile

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Superior Production Growth Profile Mineral Production(1) (mm oz. gold equivalent) 2.4 – 2.5 1.8 – 1.9 1.6 2007 2008E 2009E (1) Refer to final slide endnote #1. 5 Kupol(3) ƒ Started up on time in May 2008, commissioning in progress ƒ F

  4. Slide 4: Paracatu Expansion Project

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Paracatu Expansion Project(4) ƒ Commissioning began on schedule in July ƒ First s p oduc o e production pec ed in late expected a e Sep e be September ƒ Full production expected by year-end ƒ ’08e gold production: ~245k – 265k oz.(4)

  5. Slide 5: Paracatu – overland conveyor

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Paracatu – overland conveyor 9 Ore stockpile 10 5

  6. Slide 6: Kettle River – Buckhorn

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Milling facilities 11 Kettle River – Buckhorn(5) ƒ Construction of surface facilities complete ƒ Mine access road ~90% complete p ƒ Mine development work continues – Focus divided between upper and main portals ƒ Start-up is on schedu

  7. Slide 7: Fort Knox Expansion

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Fort Knox Expansion(6) ƒ Approximately 57% complete ƒ Construction on schedule and on budget ƒ Start-up of leaching operations in Q3’09 ƒ Expansion extends Fort Knox mine life to 2018 (from 2013)(6) ƒ Increases production to avg. 370k

  8. Slide 8: The FDN deposit: a major recent discovery

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 The FDN deposit: a major recent discovery(8) ƒ Part of 95,000 hectares of exploration concessions ƒ FDN discovery hole drilled in 2006 ƒ NI 43-101 compliant Inferred resource in ‘07 ƒ Advanced work on scoping study and updating resour

  9. Slide 9: Kinross pro-forma reserves and resources

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Kinross pro-forma reserves and resources ƒ FDN adds to Kinross’ Inferred resource base(1,8) ƒ Opportunity to upgrade and expand upon current inferred resources Gold Silver 47 77 55* ((mm oz) ((mm oz) 20.7* 22 11 13 7 13.7 17 9 17.9 23

  10. Slide 10: Cerro Casale

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Cerro Casale(10) ƒ One of the largest undeveloped gold-copper deposits in the world ƒ Kinross share: 49% - 2P Reserves(2) 11.2 mm oz. Au 2.8 bn lbs. Cu ƒ Next steps: i) Finalize JV agreement with Barrick ii) Updating, drilling in prog

  11. Slide 11: Proven and Probable Reserves

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Proven and Probable Reserves(2) Gold (mm oz.) Silver (mm oz.) Copper (bn lbs.) +88% 47 +221% 2.8 77 28 25 28 24 2005 2006 2007 2005 2006 2007 2005 2006 2007 Gold Silver Copper (mm oz.) (mm oz.) (bn lb.) Proven & Probable 47 77 2.8 Res

  12. Slide 12: The Kinross difference

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 The Kinross difference Industry Challenge Kinross • Building new mines will increase ’09e production by ~55% from ’07(1) Declining global production • Aggressive portfolio upgrades • Adding to pipeline of projects • Margins have grown

  13. Slide 13: Cautionary Note to Shareholders in the United States

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Cautionary Note to Shareholders in the United States Information in this presentation, including the documents incorporated by reference herein, has been prepared in accordance with the requirements of securities laws in effect in Can

  14. Slide 14: Q2 Operating results

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 Q2 Operating results Mine Ounces Produced Ounces Sold Cost of Sales Cost of Sales (Au eq) (Au eq) (US$ mm) (US$/oz) Fort Knox 85,609 75,720 $34.4 $454 Round Mountain 65,570 67,538 $30.9 $458 Paracatu 47,338 52,150 $23.8 $456 La Coipa

  15. Slide 15: 2008 Outlook

    Kinross Gold Corporation Denver Gold Forum September 7-10th, 2008 2008 Outlook(1) Revised guidance Previous 2008e Revised 2008e Production 1.9 – 2.0 mm oz. Au eq 1.8 – 1.9 mm oz. Au eq C t off Sales Cost S l ($/oz) ($/ ) $385 – $395 //oz $425 - $445/oz $445/ Key sensitivities Sensitivity Approximate

Kinross Gold — Denver Gold Forum 2008 on 6ix