Iondrive Limited · ASX:ION

Iondrive — Investor Presentation (November 2026)

19 slides from Iondrive's investor presentation, Nov 24, 2026

  1. Slide 1: Recovering America's rare earths from magnet waste

    Slide 1: Recovering America's rare earths from magnet waste

    Recovering America's rare earths from magnet waste Recovering rare earths from end-of-life magnets and manufacturing scrap for the US supply chain End-of-life NdFeB magnet feedstock CORPORATE PRESENTATION · NOVEMBER 2026 IONDRIVE LIMITED · ASX:ION

  2. Slide 2: The five-tonne trial is in commissioning; FEED follows technical validation

    Slide 2: The five-tonne trial is in commissioning; FEED follows technical validation

    HIGHLIGHTS The five-tonne trial is in commissioning; FEED follows technical validation, subject to board approval THE FIVE-TONNE TRIAL THE PATH FROM HERE Five-tonne trial being commissioned; one tonne on site, four in transit Target ~1.4 t of mixed rare earth oxide for customer qualification. The tr

  3. Slide 3: America is building magnet factories without enough domestic material supply

    Slide 3: America is building magnet factories without enough domestic material supply

    THE US SUPPLY CHAIN America is building magnet factories without enough domestic material supply FEEDSTOCK AVAILABLE AND GROWING RECOVERY, SEPARATION AND CONVERSION US MANUFACTURING, BUILT AND BUILDING Magnets Domestic mines Motors Constrained US capacity Recycled magnets Defence equipment a modular

  4. Slide 4: Where Iondrive fits as US rare earth capacity comes online

    Slide 4: Where Iondrive fits as US rare earth capacity comes online

    THE US SUPPLY CHAIN IS BUILDING AT DIFFERENT SPEEDS Where Iondrive fits as US rare earth capacity comes online Different products, different capital requirements and different commercialisation timelines. RESOURCE AND PRIMARY PROCESSING 2026 2027 2028 2029 2030 2031 MP Materials Mountain Pass · NdPr

  5. Slide 5: A capital-efficient route to heavy rare earth supply

    Slide 5: A capital-efficient route to heavy rare earth supply

    WHY IONDRIVE IS DIFFERENT A capital-efficient route to heavy rare earth supply Recycled magnet feedstock. Modular processing. High-value rare earths. A focused path to commercial production. FEED INTERMEDIATE MIXED OXIDE SEPARATION SEPARATED OXIDES METAL AND ALLOY MAGNETS AND END USE MREC can feed s

  6. Slide 6: IONSolv recovers rare earths from domestic magnet waste

    Slide 6: IONSolv recovers rare earths from domestic magnet waste

    THE IONDRIVE APPROACH IONSolv recovers rare earths from domestic magnet waste Magnet scrap Preparation IONSolv Mixed rare earth US downstream › › recovery from iron › oxide › customers Independent testwork 96.5% 93.5% 99.9% on US commercial feedstock Nd and Pr leach efficiency, each dysprosium leach

  7. Slide 7: US magnets retire at ~13 kt a year today and ~37 kt by 2050

    Slide 7: US magnets retire at ~13 kt a year today and ~37 kt by 2050

    FEEDSTOCK: THE END-OF-LIFE MAGNET POOL US magnets retire at ~13 kt a year today and ~37 kt by 2050; aggregators are the way in NdFeB magnet mass in products sold into US demand, by application, kt a year1 Today's scrap is yesterday's sales Magnets last 5 to 25 years in the product. The 16 kt sold in

  8. Slide 8: Today's estimated pool could support Module 1; multiple channels beyond it

    Slide 8: Today's estimated pool could support Module 1; multiple channels beyond it

    FEEDSTOCK: THE PATH FROM ONE MODULE TO TEN Today's estimated pool could support Module 1; multiple channels underpin the pathway beyond it Estimated US NdFeB magnet scrap generated per year versus IONSolv module feed, tpa1 MODULES · WHEN · FEED · COUNTERPARTIES Module feed 1 now End-of-life magnets

  9. Slide 9: Three feedstock channels, one reaching material the scrap market does not recover

    Slide 9: Three feedstock channels, one reaching material the scrap market does not recover

    FEEDSTOCK STRATEGY Three feedstock channels, one of which reaches material the scrap market does not recover Three ways in, not one; channel 02 is the one the merchant scrap market leaves behind. 01 Recycling and PRODUCT PATHWAYS aggregation networks Mixed rare earth oxide Binding evaluation term sh

  10. Slide 10: US$243M post-tax NPV from one modelled module

    Slide 10: US$243M post-tax NPV from one modelled module

    MODELLED ECONOMICS US$243M post-tax NPV from one modelled module POST-TAX NPV US$62.1M US$11.9M US$243M Annual EBITDA Plant capital ~630 tpa 51% 10% real discount rate · pre-tax US$348M Mixed rare earth oxide (MREO) EBITDA margin 2,402 tpa ~630 tpa magnet feed into one module › One IONSolv module ›

  11. Slide 11: Seven prospective feedstock and offtake counterparties in the US

    Slide 11: Seven prospective feedstock and offtake counterparties in the US

    COMMERCIAL PROGRESS Seven prospective feedstock and offtake counterparties in the US Four prospective feed suppliers, three prospective oxide buyers and an Oklahoma site, as at November 2026 FEEDSTOCK OFFTAKE SITE 4 prospective magnet feed suppliers 3 prospective buyers for the oxide 1 Oklahoma site

  12. Slide 12: Feedstock and customer qualification progress through the five-tonne trial

    Slide 12: Feedstock and customer qualification progress through the five-tonne trial

    QUALIFICATION Feedstock and customer qualification progress together through the five-tonne trial now in commissioning COMPLETE FRACTION ASSAYED IN PROGRESS NEXT NEXT NEXT Trial feedstock 53–75 µm fraction Five-tonne trial Product Customer Definitive sourced specification qualification commercial te

  13. Slide 13: Module 1 site lease in Oklahoma is nearing finalisation

    Slide 13: Module 1 site lease in Oklahoma is nearing finalisation

    DEPLOYMENT AND FUNDING Module 1 site lease in Oklahoma is nearing finalisation Central US position Three Class I railroads, Gulf port access and low-cost industrial power Oklahoma incentives identified Up to ~US$5.2M for Module 1 and more than US$15M across three modules; conditional, not awarded (A

  14. Slide 14: Module 1 needs US$11.9M of plant capital plus working capital

    Slide 14: Module 1 needs US$11.9M of plant capital plus working capital

    MODULE 1 FUNDING Module 1 needs US$11.9M of plant capital plus working capital, further defined at FEED Module 1 funding · where each component stands Component Status Basis Plant capital US$11.9M Announced 7 Sep 2026. Installed cost of one module Technical validation sets the design basis; FEED can

  15. Slide 15: One module first, up to five in the medium term, up to ten by 2050

    Slide 15: One module first, up to five in the medium term, up to ten by 2050

    EXECUTION PLAN One module planned first, with potential for up to five in the medium term, up to ten by 2050 Illustrative pathway and target milestones, not achievements or forecasts. Module 1 first production is a 2028 planning assumption. 01 02 03 CY 2027 CY 2028 CY 2030 CY 2033 CY 2050 PHASE 01 P

  16. Slide 16: Six catalysts, each testing an assumption in the study

    Slide 16: Six catalysts, each testing an assumption in the study

    NEXT STEPS Six catalysts, each testing an assumption in the study The near-term programme. Material developments will be announced to ASX. 01 02 03 Prove the product Define the project Secure site and funding Trial in commissioning FEED follows technical validation Site lease nearing finalisation Fi

  17. Slide 17: Global experience in mining, technology, and commercialisation

    Slide 17: Global experience in mining, technology, and commercialisation

    IONDRIVE TEAM Global experience in mining, technology, and commercialisation Michael Dr Duncan Andrew Hugo Adam Slater McNeilly Turner Sissian Schumann NED · PhD NED · CPA, MAcc, NED · CFA, MBA Chair · BA Econ NED · BA (Electrometallurgy) BCom (INSEAD) CEO of Strata Investments Process and technolog

  18. Slide 18: The principal risks to commercialising IONSolv

    Slide 18: The principal risks to commercialising IONSolv

    KEY RISKS The principal risks to commercialising IONSolv Not exhaustive. Investors should read this slide with the Important notice and the risks in the Company’s periodic disclosures. Technology and scale-up Feedstock Product and customers IONSolv has not been demonstrated at commercial Only the ev

  19. Slide 19: Important Notice

    Slide 19: Important Notice

    IMPORTANT NOTICE Technical results The following notices and disclaimers apply to this presentation and you are therefore advised to read this carefully before Rare earth extraction and iron rejection percentages referred to in this presentation are unaudited single-pass laboratory leach reading or

Source: company website