Turquoise Hill Resources Ltd.

Turquoise Hill Resources — Investor Presentation (December 2016)

18 slides from Turquoise Hill Resources's investor presentation, December 2016

  1. Slide 1: Oyu Tolgoi: Long-term value

    Investor Presentation DECEMBER 2016 Oyu Tolgoi: Long-term value World’s best developing copper project

  2. Slide 2: Turquoise Hill's investment thesis

    Turquoise Hill’s investment thesis  Oyu Tolgoi will be the world’s third-largest copper mine with underground  Hugo North Lift 1 financing in place1  Timing of underground benefits from expected drop in copper supply (~2020)  Oyu Tolgoi’s resources provide long-term development optionality 1. Fi

  3. Slide 3: Analysis of potential full production upside

    Analysis of potential full production upside1 Indicative valuation (US$B) EV/Reserves EV/M+I Resources5 Price/NAV TRQ EV/Reserves ($/lb.) TRQ EV/M+I Resources ($/lb.) TRQ P/NAV $0.156 $0.061 0.825x Trading comps2 Average EV/Reserves ($/lb.) Average EV/M+I Resources ($/lb.) Average P/NAV $0.321 $0.12

  4. Slide 4: Long-term copper fundamentals strong

    Long-term copper fundamentals strong Copper supply/demand outlook  Copper market likely to be in Base Highly Probable Primary Demand Annual avg cu price balance in 2017 30 Forecast $4  Ongoing attrition at existing mines driven by declining Annual average LME copper price (US$/lb) 25 grade $3 Copp

  5. Slide 5: 2016 Reserves Case mining areas

    2016 Reserves Case mining areas Underground Open Pit Plant  Ramp-up (2020-2027), full production (~33mtpa)  Open-pit mine tops-up concentrator  Highest grade ore mined first – copper ~2.5%  After 2039, open-pit head grades average ~ 0.45% copper  Opportunities to reduce construction time, faste

  6. Slide 6: Complete ramp-up expected by 2027

    Complete ramp-up expected by 2027 Sustainable underground production Complete convey to surface Project 1st draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Excav

  7. Slide 7: Key underground components

    Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre

  8. Slide 8: Approved underground CAPEX

    Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3  Underground expansion capital, VAT and escalation of $5.3 billion  Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 8

  9. Slide 9: 2016 Resources Case

    2016 Resources Case Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.31 g/t gold Hugo North Lift 1 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Plant Hugo North Lift 2 ~700Mt (reso

  10. Slide 10: Alternative Production Cases

    Alternative Production Cases Resources 120 Case • Assumes ~Year 20, concentrator expanded to 120mtpa • NPV8% $8.80 billion1 • Expansion capital costs of $14.86 billion3 Resources 100 Case • Assumes ~Year 20, concentrator expanded to 100mtpa • NPV8% $8.88 billion1 Resources 50 Case • Expansion capita

  11. Slide 11: Production highlights

    Production highlights All injury frequency rate (AIFR) Concentrator throughput (per 200,000 hours worked) ('000 tonnes) ↑70% 0.47 2015 vs. 2013 34,537 0.43 27,872 28,333 0.33 20,317 ↓72% 2016 YTD vs. 2013 0.12 2013 2014 2015 Q3'16 YTD 2013 2014 2015 Q3'16 YTD Industry-leading safety performance Mult

  12. Slide 12: Financial highlights

    Financial highlights Cash position Operating cash flow ($'000,000) ($'000,000) $1,437 $719 $1,344 $651 $381 $863 Cu:$3.10 Cu:$2.49 Cu:$2.15 Au:$1,266 Au:$1,160 Au:$1,259 2013 2014 2015 Q3'16 YTD Cu:$3.33* Au:$1,411* $78 ($631) 2013 2014 2015 Q3'16 Strong cash position Consecutive periods of positive

  13. Slide 13: Open Pit - managing ore grade challenges

    Open Pit - managing ore grade challenges  Phase 2 finished and Phase 3 nearly complete (2017)  Phase 6 and lower-grade stockpile ore processed mid-2016 to mid-2018  Phase 4 waste mining critical, uncovers 2017 medium-grade ore, then 2018 high-grade ore Primary Crusher 2017-18 Ore (Phase 4a & 6, s

  14. Slide 14: Oyu Tolgoi's impact in Mongolia

    Oyu Tolgoi’s impact in Mongolia Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $5.9B At the end of Q3’16, ~94% Between 2010 and 1H’16, Between 2010 and Q3’16, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $5.9B in Mongolia1

  15. Slide 15: Oyu Tolgoi – a long-term growth opportunity

    Oyu Tolgoi– a long-term growth opportunity  Open pit performing as expected in low gold areas  Demonstrated productivity and cost improvements  Underground development progressing  Long-term development optionality and plant expansion opportunities  Oyu Tolgoi is the best copper asset in develo

  16. Slide 16: Appendix

    Appendix

  17. Slide 17: Project financing – flow of funds

    Project financing – flow of funds At September 30, 20161 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $2.9 billion Shareholder loan: $2.9 billion Payable to Turquoise Hill* Receivable from Oyu

  18. Slide 18: Oyu Tolgoi at China's doorstep

    Oyu Tolgoi at China’s doorstep 18