  1. Slide 1: Moving Towards Production: Building a Premier Australian Copper-Gold Producer

    For personal use only Moving Towards Production: Building a Premier Australian Copper-Gold Producer International Investor Roadshow November 2010

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer Competent Person’s Statement The information in this public presentation that relates to Exploration Results and Mineral Resources is based on information compiled by Mr John For personal use only Evans who is a Fellow of the Australasian Institute of Mining and

  3. Slide 3: Snapshot

    Snapshot World-class DeGrussa Copper-Gold Project, Western Australia For personal use only JORC resource: 600,000t of copper, 660,000oz of gold Discovery cost ~$0.02/lb Project development commencing 2011: PFS Q4 2010, DFS Q1 2011, Open pit pre-strip Q2 2011 Initial open cut to extract high-grade ne

  4. Slide 4: DeGrussa Copper-Gold Project

    DeGrussa Copper-Gold Project For personal use only One of Australia’s most significant new mineral discoveries Located 900km NE of Perth in a well- established mining area Dominant 400km2 tenement package in emerging Bryah Basin copper district 4

  5. Slide 5: DeGrussa Project – Location & Infrastructure

    DeGrussa Project – Location & Infrastructure Established mining For personal use only district with excellent infrastructure: Great Northern Highway transects the tenement package Goldfields Gas Transmission Pipeline nearby Abundant fresh groundwater 5

  6. Slide 6: DeGrussa Project – Overview

    DeGrussa Project – Overview Substantial high-grade For personal use only copper-gold resource inventory established within 18 months Development studies well advanced in parallel with resource development Pre-Feasibility Study nearing completion – seamless transition to Feasibility Study Mine develo

  7. Slide 7: Four Deposits, 150,000m of Drilling, Months…

    Four Deposits, 150,000m of Drilling, 18 Months… For personal use only 7

  8. Slide 8: DeGrussa Project – Phase III Mineral Resource

    DeGrussa Project – Phase III Mineral Resource JORC compliant Mineral Resource estimate for DeGrussa, Conductor 1, Conductor 4 and Conductor 5 deposits: 10.67Mt at 5.6% copper, 1.9g/t gold and 15g/t silver For personal use only Reported above 1.0% Cu lower cut-off grade Tonnes Cu Au Ag Cu Au Ag (Mt)

  9. Slide 9: DeGrussa Project – Development Overview

    DeGrussa Project – Development Overview Open pit and underground mining operation For personal use only On-site 1.5Mtpa concentrator: Expected to support annual production in the order of 60-70,000tpa of copper and 50-60,000oz of gold in concentrate Concentrate to be trucked to either Port Hedland o

  10. Slide 10: Pre-Feasibility Study – Key Highlights

    Pre-Feasibility Study – Key Highlights Targeted throughput rate for processing plant increased from 1.0Mtpa to For personal use only 1.5Mtpa following Phase III resource update (September 2010): 10.67Mt @ 5.6% Cu, 1.9g/t Au, 15g/t silver 600,000t Cu metal, 660,000oz gold, 5.1Moz silver Plant upgrade

  11. Slide 11: Pre-Feasibility Study – Key Highlights

    Pre-Feasibility Study – Key Highlights Completion of open pit and underground mine designs and scheduling For personal use only Favourable geotechnical and hydrological results Excellent results from ongoing metallurgical testwork: demonstrating good recoveries and the ability to produce concentrate

  12. Slide 12: DeGrussa Project – Direct Shipping Operation

    DeGrussa Project – Direct Shipping Operation Open pit optimisation and design scheduling For personal use only defines direct shipping material within the DeGrussa chalcocite resource: 151,000t @ 25.6% Cu, 2.6g/t Au, 21g/t Ag This material, containing ~39,000 tonnes of copper, to be extracted in ear

  13. Slide 13: DeGrussa Project – Development

    DeGrussa Project – Development For personal use only

  14. Slide 14: The Corridor of Riches

    The Corridor of Riches Four deposits For personal use only discovered to date within 1.5km strike: 10.67Mt @ 5.6% Cu, 1.9g/t Au, 15g/t Ag 600,000t Cu metal, 660,000oz gold, 5.1Moz silver Major exploration campaign underway across 6km priority corridor at DeGrussa: A$20-30M exploration budget

  15. Slide 15: An Unprecedented Exploration Push

    An Unprecedented Exploration Push Intensive exploration For personal use only campaign underway on the remaining 4.5km Programs include Systematic deep drilling Down-hole EM 30amp surface EM in- fill survey Extensive 200amp surface EM survey over 10km strike length – underway Deep drilling 1,600- 2,

  16. Slide 16: DeGrussa Mineral Field – Regional Exploration

    DeGrussa Mineral Field – Regional Exploration For personal use only Dominant 400km2 tenement package in emerging VMS field Multiple conductive features identified from ground-based EM surveys to follow up airborne VTEM targets completed in 2009 Priorities include coincident TEM and gravity targets W

  17. Slide 17: Copper Market Outlook

    Copper Market Outlook 34% increase in copper prices over For personal use only past 12 months driven by strong Chinese demand and tight supply Market deficit of up to 400,000 tonnes forecast for 2011 as supply falls short of demand Declining mine head grades on existing mines and long lead-times on

  18. Slide 18: Copper Market Outlook

    Copper Market Outlook For personal use only Source: Rio Tinto 18

  19. Slide 19: Copper Companies – Market Capitalisation

    Copper Companies – Market Capitalisation For personal use only 19

  20. Slide 20: McArthur Basin – A World-Class Mineral Province

    McArthur Basin – A World-Class Mineral Province For personal use only 20

  21. Slide 21: Borroloola Project

    Borroloola Project +14,000sq km tenement position in For personal use only world-class NT mineral province Prospective for zinc-lead-silver deposits (McArthur River), manganese (Groote Eylandt), iron ore and uranium Recent agreement with Mineral Resources (ASX: MIN) to fund exploration and developme

  22. Slide 22: Corporate Summary

    Corporate Summary For personal use only Issued Capital 131.7M ordinary shares Board 10.2M options DEREK LA FERLA – Non-executive Chairman Cash (September 2010) A$40.9 million KARL SIMICH – Managing Director/CEO Major Shareholders W. JOHN EVANS – Executive Technical Director - Oz Minerals 19.6% JONGH

  23. Slide 23: Summary and Outlook

    Summary and Outlook S&P ASX 200 Australian mining company For personal use only Rapidly growing VMS copper-gold project in WA Development activities well advanced On track to produce first copper next year: Open cut operations commencing 2011 Underground operations commencing 2012 Unprecedented expl

  24. Slide 24: Moving Towards Production: Building a Premier Australian Copper-Gold Producer

    For personal use only Moving Towards Production: Building a Premier Australian Copper-Gold Producer International Investor Roadshow November 2010

Sandfire Resources NL — Non-Deal Roadshow (November 2010) on 6ix