Osisko Metals Incorporated · TSX:OM

Osisko Metals — Investor Presentation (January 2022)

32 slides from Osisko Metals's investor presentation, January 2022

  1. Slide 1: Pine Point: Canada's Leading Zinc-Lead Project

    Pine Point: Canada’s Leading Zinc-Lead Project January 2022 TSXV: OM TSXV: OTCQX: OM OMZNF FRANKFURT: 0B51

  2. Slide 2: Forward-Looking Statements & Cautionary Notes Regarding Technical Information

    Forward-Looking Statements & Cautionary Notes Regarding TechnicalInformation This presentation (the "Presentation") contains ""forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this Present

  3. Slide 3: Key Take-Aways

    Key Take-Aways • Decades-long divestment from resource sector has led to global base metal reserve depletion. • Shift toward a green, sustainable economy coupled with post-COVID infrastructure stimulus will dramatically increase global base metal demand. • Zinc is particularly exposed to medium-term

  4. Slide 4: Zinc And Lead Are Quietly Building Momentum

    Zinc And Lead Are Quietly Building Momentum… Zinc prices have remained robust since the start of 2021 Zinc Lead The last 6 months have seen the strongest zinc and lead prices since the zinc bull market of 2017. Major disconnect between equity and commodity pricing… 4

  5. Slide 5: Metal commodity valuations at 100-year lows

    Metal commodity valuations at 100-year lows 100-year historical lows Historical low reached in late 2015 and repeated in March 2020 5

  6. Slide 6: ....and demand is forecasted to rapidly grow

    ….and demand is forecasted to rapidly grow 6

  7. Slide 7: No Savior for the Zinc market

    No Savior for the Zinc market… Lack of investment in Zinc markets both in China and ROW will result in long-term supply issues 7 Source: Wood Mackenzie and BMO Capital Markets

  8. Slide 8: Recycling won't be the answer for Zinc

    Recycling won’t be the answer for Zinc 8

  9. Slide 9: Construction and infrastructure stimulus will further drive the demand for zinc

    Construction and infrastructure stimulus will further drive the demand for zinc Constructio n And Source: Wood Mackenzie 9

  10. Slide 10: Galvanization = Sustainability

    Galvanization = Sustainability 10

  11. Slide 11: Looking to the future: Zinc-Air and Zinc-Hybrid Flow Batteries for energy storage

    Looking to the future: Zinc-Air and Zinc- Hybrid Flow Batteries for energy storage Renewable Energy Sources Face Storage and Distribution Issues Lithium Batteries too Costly for Grid Storage Lithium Supply Will Be Absorbed by Transportation Zinc Battery Grid Storage is Low Cost and Efficient Potenti

  12. Slide 12: Looking to the future: Zinc-Air and Zinc-Hybrid Flow Batteries for energy storage

    Looking to the future: Zinc-Air and Zinc- Hybrid Flow Batteries for energy storage Low Cost And Safe Durable With No Power Fade Over Extensive Lifetime Well Established Technology 12

  13. Slide 13: North American zinc supply deficit is coming

    North American zinc supply deficit is coming 1400 35% Drop in NA Zinc 1200 Production Zn in Concentrate (kT) 1000 800 600 400 200 0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Red Dog Pend Oreille Middle Tennessee Greens Creek Empire State (Balmat) East Tennessee Doe Run Bracemac McLeod Caribo

  14. Slide 14: The Pine Point mining camp

    The Pine Point mining camp Cominco 1964-1988 64 Mt @ 10% Zn+Pb OPEN PIT Osisko Metals Projects Head Office 14

  15. Slide 15: Support infrastructure already in place

    Support infrastructure already in place • CN Rail Head, Highway and Flights • Paved Highway from Hay River to Site. from Edmonton to Hay River • Low-Cost Hydro-Electric Power Available • Property within 60 km of Hay River 15 On Site From Taltson Dam.

  16. Slide 16: Access to international concentrate markets via rail from Hay River

    Access to international concentrate markets via rail from Hay River Rail Distances: • Edmonton to Hay River 970km • Edmonton to Prince Rupert 1,300km • Edmonton to Vancouver 1,245km 16

  17. Slide 17: Global cost curve for zinc producers

    Global cost curve for zinc producers Approx. 10% of the cost curve is unprofitable in this price environment US$1.25/lb Zinc Pine Point Source: SNL Pine Point PEA : Expected C1 cost of US$0.67/lb Potential to be within the second cost quartile on a cash cost/lb basis Well positioned on the cost curv

  18. Slide 18: Annual production of zinc: potential to be top-ten global producer

    Annual production of zinc: potential to be top-ten global producer 250,000 500 200,000 400 Contained Tonnes Contained Mlbs 150,000 300 100,000 200 50,000 100 0 0 1 2 3 4 5 6 7 8 9 10 Year Zinc (Metric) Lead (Metric) Zinc (Imperial) Lead (Imperial) Sourced from 39 open pits and 8 high grade deposits

  19. Slide 19: Pine Point could produce one of the cleanest concentrates globally

    Pine Point could produce one of the cleanest concentrates globally 18.00% 6,000 P: Above Penalty Level P: Above Penalty Level Minor Element Penalties (ppm) 16.00% 5,000 P Major Element Penalties 14.00% P Mn SiO2 P Hg 12.00% Fe 4,000 P P 10.00% Cd Pb 3,000 As 8.00% P Cu 6.00% 2,000 P P 4.00% P 1,000

  20. Slide 20: Positive PEA outlines potential for significant zinc and lead production at Pine Point

    Positive PEA outlines potential for significant zinc and lead production at Pine Point • NPV of C$500M and IRR of 29.6% (After-Tax) • Potential To Be Top-10 Global Zinc Mine On Production Basis • Potential to produce Premium High Grade Zinc Concentrate • Infrastructure In Place: • Hydroelectric Powe

  21. Slide 21: Pine Point Leading North American Zinc Development project

    Pine Point Leading North American Zinc Development project Pine Point Premium High-grade Concentrate 21

  22. Slide 22: MRE confirms potential for further resource expansion

    MRE confirms potential for further resource expansion • MRE within a total of 47 deposits of which 11 remain open along strike. Key focus of 2021-2022 drilling campaigns. • Drilling in the East Mill Zone successfully pushed pit boundaries, demonstrating an opportunity to connect neighboring pit and

  23. Slide 23: Project boundary location

    Project boundary location Large Near Surface 65 km-long Mineralized Resource Base Trend R190 23

  24. Slide 24: Deposit styles at Pine Point (MVT type)

    Deposit styles at Pine Point (MVT type) W-85 A-70 Subtle Surface Watt Mountain Shale Depressions Collapse Collapse Tabular Sulfur Point Fm (Dolomitized) Prismatic Prismatic Pine Point Fm. Pine Point Fm Poorly Investigated Carbonates X-15 30m “B Spongy” Unit (Base of Pine Point) N-204 0m 200m 41% Zn+

  25. Slide 25: New hydrogeological model is significant de-risking milestone

    New hydrogeological model is significant de-risking milestone C1 Cluster 25

  26. Slide 26: Leveraging the hydrogeological model

    Leveraging the hydrogeological model A first for Pine Point – Providing unparallel insight into dewatering requirements • Water inflow reduced by 46% when using new hydrogeological model in C1 cluster. • Combined with high efficiency cluster mining technique, aggregate reduction of 63% of inflow rat

  27. Slide 27: Pine Point Agreements Provide Community Support

    Pine Point Agreements Provide Community Support • In 2019, Osisko Metals announced two separate Collaboration Agreements with indigenous communities located near the Pine Point Project: • Deninu K’ue First Nation • Northwest Territory Metis Nation • In 2017, Exploration Agreement signed with K’atl’o

  28. Slide 28: Share Structure and BOD

    Share Structure and BOD Significant Shareholders As at January 3, 2021 Osisko Group. . . . . . . . . . . . . . . . . . . . 20.3% Closing price . . . . . . . . . . . . . . . $0.40 CDPQ . . . . . . . . . . . . . . . . . . . . . . . . . . 3.4% 52 week low/high . . . . . . .$0.35-$0.52 Management & Insi

  29. Slide 29: Wrap-up

    Wrap-up • Base metal markets are at relative 100-year lows. • Shift toward a green, sustainable economy coupled with post- COVID infrastructure stimulus will dramatically increase global base metal demand. • Zinc production deficit looming as mines close and only handful of zinc development projects

  30. Slide 30: Metal Resource Investment is Coming Back!

    Metal Resource Investment is Coming Back! “Our global industry will need to SIGNIFICANTLY INCREASE THE SUPPLY OF VARIOUS RAW MATERIALS Ivan Glasenberg, CEO of Glencore, February 2021 “By 2030, more than half of passenger cars will be electric. To meet this demand, global battery manufacturing capaci

  31. Slide 31: Contacts

    Contacts 1100, av. des Canadiens-de-Montréal Investors and General Inquiries: Suite 300 info@osiskometals.com Montreal, Qc, H3B 2S2 Tel: 514-940-0670 Fax: 514-861-1333 31

  32. Slide 32: Appendix - PEA Financial Overview

    Appendix - PEA Financial Overview Internal Rate of Return ("IRR") After Taxes 29.6% After-tax Net Present Value ("NPV") (Discount Rate 8%) $500M After-Tax Payback Period (Years) 2.8 Pre-Production CAPEX (including $71.2M Contingency) $555M Average Annual LOM Production Zinc 327Mlb Average Annual LOM