Winsome Resources Limited · ASX:WR1
Winsome Resources — Shareholder Meeting (November 2023)
12 slides from Winsome Resources's shareholder meeting presentation, Nov 30, 2023
Slide 1: 2023 AGM Presentation
2023 AGM PRESENTATION ASX: OTCQB: FSE: Corporate Presentation 30 November 2023 WR1 WRSLF 4XJ
Slide 2: Important & Cautionary Notes
IMPORTANT & CAUTIONARY NOTES All statements, other than statements of historical fact, included in historical fact and actual events and results may differ materially This presentation has been prepared and issued by Winsome the presentation, including without limitation, statements regarding from t
Slide 3: Major Investment Highlights
MAJOR INVESTMENT HIGHLIGHTS SIZE, SCALABILITY, GRADE, JURISDICTION, INFRASTRUCTURE AND QUALITY • Maiden Resource expected in 2023 after receiving significant new drill results1 • High grade deposit, mineralised at surface, open in all directions and +3km strike • Quality infrastructure including 50k
Slide 4: Key Milestones & Indicative Outlook
KEY MILESTONES & INDICATIVE OUTLOOK ADINA PATHWAY TO PRODUCTION NOV 2021 DEC 2022 JAN 2023 JUN 2023 Q3 2023 December 2023 H1 2024 2024 2024 IPO with Power Metals 107m at 1.34% Over 3km Continued Publish Maiden Metallurgical Adina Study Preliminary prospective investment incl. Li2O at Adina strike an
Slide 5: Adina – Maiden Resource Expected December 2023
ADINA – MAIDEN RESOURCE EXPECTED DECEMBER 2023 PUBLICATION OF MAIDEN RESOURCE Main Zone High grade assays in 2023 include: 1.34% Li2O over 107.6m from 2.3m 1 1.64% Li2O over 47.4m from 32.7m 1 1.78% Li2O over 23.0m from 55.1m 1 1.92% Li2O over 18.0m from 48.0m 1 Adina Main Zone is mineralise
Slide 6: Adina – Maiden Resource Expected December 2023
ADINA – MAIDEN RESOURCE EXPECTED DECEMBER 2023 TARGETING A MAIDEN RESOURCE DECEMBER 2023 Footwall Zone Discovery Adjacent Main Zone High Grade drill results in H2 2023 including: 1.37% Li2O over 61.2m from 8.9m (MZ) 1 1.98% Li2O over 35.4m from 251.2m (FWZ) 1 1.62% Li2O over 20.4m from 345.2m
Slide 7: Infrastructure Advantages – Pathway to Production
INFRASTRUCTURE ADVANTAGES – PATHWAY TO PRODUCTION CORE PROJECTS ARE LOCATED ADJACENT TO KEY ROADS, TRANSPORT AND LOGISTIC HUBS Established operations facility – located on the Trans-Taiga Road, accommodates up to 20 people with expansions planned (100% WR1 owned) – runs on hydropower All-weather
Slide 8: Adina – Pathway to Production
ADINA – PATHWAY TO PRODUCTION METALLURGICAL TEST WORK POINTS TO SIMPLE DENSE MEDIA SEPARATION (DMS) Consistent mineralogy observed in logging and assay between Footwall and Main Zone Large spodumene crystals Coarse grained spodumene generally liberates effectively using Dense Media Separation (D
Slide 9: Experienced Team
EXPERIENCED TEAM BOARD Stephen Biggins Chris Evans Dr Qingtao Zeng Justin Boylson NON-EXECUTIVE CHAIRMAN MANAGING DIRECTOR NON-EXECUTIVE DIRECTOR NON-EXECUTIVE DIRECTOR Mr Biggins was until recently Managing Director of Core Mr Evans has a strong Lithium background with close Dr Zeng completed a PhD
Slide 10: Environment, Social & Governance Roadmap
ENVIRONMENT, SOCIAL & GOVERNANCE ROADMAP ESG FRAMEWORK CURRENT INITIATIVES & PERFORMANCE While Winsome has seen a meteoric rise in its share price since listing in November 2021, the Company’s focus is on steady and sustainable growth. Winsome operations have access to Quebec’s extensive hydropowe
Slide 11: Outlook & Investment Highlights
OUTLOOK & INVESTMENT HIGHLIGHTS NEAR TERM CATALYSTS ESG & STAKEHOLDER FOCUS Maiden Resource Estimate expected in December 2023 Disciplined approach to capital management, Resource upgrade H1 2024 maintaining a strong balance sheet Preliminary Economic Analysis (PEA) / Preliminary Advance a
Slide 12: WR1 4XJ WRSLF
ASX: FSE: OTCQB: WR1 4XJ WRSLF PERTH OFFICE Level 1, 16 Ord Street West Perth WA 6005 Chris Evans M +61 419 853 904 E cevans @wins om eres ources .com .au
Winsome Resources — Shareholder Meeting (November 2023) on 6ix