  1. Slide 1: Cordero - A World-Leading Silver Development Project

    Cordero - A World-Leading Silver Development Project Feasibility Study Results February 20, 2024 TSX: DSV | OTCQX: DSVSF | DISCOVERYSILVER.COM DSV

  2. Slide 2: Forward Looking Statement & NI 43-101 Disclosure

    Forward Looking Statement & NI 43-101 Disclosure DSV This presentation may include forward-looking statements that are subject to inherent risks and uncertainties. All statements within uncertainties. Discovery does not assume any obligation to update any forward-looking statements except as require

  3. Slide 3: Feasibility Study Highlights

    Feasibility Study Highlights DSV

  4. Slide 4: The Next Major Silver Producer

    The Next Major Silver Producer DSV Large-scale, low-cost, capital-efficient project that generates excellent returns Large-scale Excellent Exceptional production profitability economics 37Moz AgEq produced annually Average AISC <$12.50/oz After-tax NPV(5%) of $1.2 billion (Years 1 – 8) (Years 1 – 8)

  5. Slide 5: Operating & Production Metrics

    Operating & Production Metrics DSV Poised to become a top 3 global silver producer Unit PFS FS Mine Life (years) 18 19 Ore Tonnes (Mt) 302 327 Strip Ratio (w:o) 2.1 2.0 Silver Produced – Life of Mine (Moz) 229 259 Lead Produced – Life of Mine (Blb) 2.5 2.6 Zinc Produced – Life of Mine (Blb) 4.3 4.4

  6. Slide 6: Financial Metrics

    Financial Metrics DSV Cordero is a large-scale, capital-efficient project with low costs that is expected to generate substantial free cash flow Unit PFS FS Silver Price (US$/oz) $22.00 $22.00 NPV(5%) – After-tax (US$M) $1,153 $1,177 IRR – After-tax (%) 28.0% 22.0% Payback – After-tax (years) 4.2 5.

  7. Slide 7: Socio-Economic Contribution

    Socio-Economic Contribution DSV Cordero will have a major positive socio-economic impact locally in Parral and Chihuahua and nationally within Mexico Cordero will be one of the Substantial economic An exemplary track record most significant employers contributions locally and to date: in the region:

  8. Slide 8: Environmental Management

    Environmental Management DSV We are committed to meeting the highest industry standards for environmental protection Project Site Water Management Highest Industry Standards • Cordero is located on private land in • Significant capital investment to • Third-party reviews of environmental a sparsely

  9. Slide 9: After-tax NPV Accretion

    After-tax NPV Accretion DSV Rolling After-tax NPV(5%) of Cordero expands to over $2 billion Phase2 Development $2.2 B $2.0 B • After-tax NPV(5%) post 2.0 Phase 1 development of Phase 1 US$2.0 billion Development • After-tax NPV(5%) post NPV(5%) - US$ billion 1.5 Phase 2 development of US$2.2 billion

  10. Slide 10: Silver Reserves

    Silver Reserves DSV Cordero ranks as the world’s largest undeveloped silver deposit by reserves Source: S&P Capital IQ 10 Cordero Feasibility Study – February 2024

  11. Slide 11: Silver Reserves vs. Producer Peers

    Silver Reserves vs. Producer Peers DSV Second highest reserve base among North American listed silver producers 500 400 Ag Reserves (Moz) 300 200 100 0 Pan American Discovery Coeur Hecla Aya First Majestic Endeavour Silvercrest Fortuna Market Cap (C$B) $6.4 $0.3 $1.4 $3.0 $1.3 $1.8 $0.5 $1.0 $1.2 So

  12. Slide 12: Large Scale & Low Cost

    Large Scale & Low Cost DSV Cordero is uniquely positioned in the silver space based on its volume of production, low costs and resource size AgEq Production & AISC & Ag Resource (M&I)1 40 Bubble size = M&I silver resource, inclusive of reserves 35 La Colorada La Encantada Huaron 2024 AISC (US$/oz Ag

  13. Slide 13: Next Steps

    Next Steps DSV Our path to becoming the next major silver producer Permit/Financing Construction Operations • Project finance discussions • Commence project construction • Process plant commissioning • Receipt of construction permit/ • ~2-year development period • First metal production construction

  14. Slide 14: Construction

    o@e@000 Construction ‘ silver

  15. Slide 15: Capex Summary

    Capex Summary DSV Highly capital efficient project with an NPV to Capex ratio of 2x INITIAL EXPANSION SUSTAINING TOTAL LOM Capital efficiency driven by: CAPITAL EXPENDITURES (US$ M) • Staged expansion of process plant Mining $117 $2 $110 $229 • Simple and conventional process design On-site Infrastr

  16. Slide 16: Initial CAPEX FS vs. PFS

    Initial CAPEX FS vs. PFS DSV Capex increase driven by scope expansion, scope de-risking and cost inflation Changes in Initial Capital estimate vs. PFS caused by: • Mining – increased pre-strip and additional equipment & infrastructure • Power station – upgrade to Camargo substation • Water treatment

  17. Slide 17: Established Infrastructure

    Established Infrastructure DSV Cordero is ideally located in a prolific mining region in northern Mexico with established infrastructure Chihuahua (population 1,100,000) • International airport • Major industrial hub for mining and manufacturing Parral (population 120,000) • Mining town dating back

  18. Slide 18: Site Layout

    Site Layout DSV Site layout benefits from: • Gentle topography • Competent bedrock • Non-acid generating waste rock • Ample availability of borrow material • No major relocation of infrastructure, lakes or waterways required 18 Cordero Feasibility Study – February 2024

  19. Slide 19: Process Design

    Process Design DSV Low execution and operating risk from a simple conventional flowsheet Phase 1 • Initial throughput rate of ~26,000 tpd Phase 2 • Expanded throughput rate of ~51,000 tpd • Flexibility on timing of Phase 2 expansion; currently assumed to be built in Y3 and operational in Y4 • Coarse

  20. Slide 20: Process Site Layout

    Process Site Layout DSV 20 Cordero Feasibility Study – February 2024

  21. Slide 21: Operations

    ooe0o Operations Discoverysilver

  22. Slide 22: Mine Plan

    Mine Plan DSV Simple open pit with a low strip ratio • Starter pit (Phase 1A) contains highest grade material in deposit • 88% of mill feed in Proven category in Y1 – Y4 • Mine plan is based on a detailed mine design incorporating dilution, ore loss, safety berms & haul roads 22 Cordero Feasibility

  23. Slide 23: Mine Plan

    Mine Plan DSV Straight-forward executable mine plan with steady mining rate 80 4.0 • Average strip ratio of 2.0:1 over 70 3.5 life of mine • Stockpiling of low-grade 60 3.0 material allows higher grade Strip Ratio (w:o) material to be fed to mill earlier Tonnes (Mt) 50 2.5 • Steady mining rate of ~7

  24. Slide 24: Mine Plan Upside

    Mine Plan Upside DSV Exceptional silver price leverage; substantial mine life extension potential at modestly higher metal prices Reserves • Ag – 302 Moz • Pb – 3.0 Blb • Zn – 5.2 Blb Reserve prices • Ag - $22/oz, Pb - $1.00/lb, Zn - $1.20/lb Resource* • Ag – 493 Moz • Pb – 4.8 Blb • Zn – 9.1 Blb Re

  25. Slide 25: Process Throughput

    Process Throughput DSV High head grades in initial years drive early cash flow 20.0 120 • Average head grade +100 g/t AgEq in Y1 – Y3 • Mill expansion complete by Y4; 15.0 90 expansion can be accelerated or Head Grade (AgEq g/t) deferred as required Tonnes Processed (Mt) • Slight throughput variatio

  26. Slide 26: Metallurgical Performance

    Metallurgical Performance DSV High recoveries achieved through conventional flotation at a coarse grind size • Positive relationship between head grade Y1 – Y4 Life of Mine and recoveries Ag recovery – Total 91% 87% • ~90% of recovered Ag is recovered to Precious Metals concentrate where highest Ag

  27. Slide 27: Metal Production

    Metal Production DSV At 33Moz AgEq of average annual production, Cordero will be one of the world’s largest silver mines 60 • 33Moz AgEq average annual production 50 • 64Moz AgEq peak annual production AgEq Produced (Moz) 40 • 635Moz AgEq life of mine production 30 • Silver represents +50% of net sm

  28. Slide 28: Concentrate Marketing

    Concentrate Marketing DSV High demand expected for clean saleable concentrates • Significant volumes of clean Ag-Pb and Zn Ag Au Pb Zn concentrates expected to have significant Precious Metals Concentrate demand from local buyers and offshore Concentrate grades 3,062 g/t 2.05 g/t 50% — smelters/trad

  29. Slide 29: Concentrate Logistics

    Concentrate Logistics DSV Both onshore and offshore options to be pursued for concentrate delivery • In-country smelters include Torreon lead-zinc smelter owned by Penoles and the San Luis Potosi zinc smelter (central Mexico) owned by Grupo Mexico • Concentrate for offshore to be trucked to either G

  30. Slide 30: Project Economics

    Project Economics

  31. Slide 31: Operating Costs

    Operating Costs DSV Costs benefit from a large-scale operation with a low strip ratio and excellent metallurgy ITEM UNIT COST LOM COST Mining cost • Generated from first principles Mining Cost $2.35 ($/t mined) $2,406M • Assumes owner-operated mining with $7.35 ($/t processed) lease financing Proces

  32. Slide 32: Project Economics

    Project Economics DSV Attractive project economics with after-tax NPV(5%) of $1.2 billion and IRR of 22% Unit FS NPV(5%) – After-tax (US$B) $1.2 IRR – After-tax (%) 22.0% • Financial metrics based on Ag - $22/oz, Pb - $1.00/lb and Zn - $1.20/lb Payback – After-tax (years) 5.2 • Payback period curren

  33. Slide 33: Commodity Price Leverage

    Commodity Price Leverage DSV Unparalleled leverage to rising silver prices NPV/IRR/Payback sensitivity to Ag/Zn prices: (Fixed prices for Au = $1,600/oz & Pb = $1.00/lb) Ag ($/oz) NPV(5%) upside $18.00 $20.00 $22.00 $25.00 $30.00 estimates do NOT include the mine life NPV (5%) IRR Payback NPV (5%) I

  34. Slide 34: Financial Sensitivities

    Financial Sensitivities DSV After-tax NPV(5%) sensitivities to changes to key inputs $1,800 $1,600 Baseline NPV $1,177M $1,400 $1,200 $1,000 $800 $600 $400 $200 $- Metal Prices (+/- 10%) AISC (+/- 10%) Discount Rate (+/- 1%) Recoveries (+/- 2%) Capex (+/- 10%) 34 Cordero Feasibility Study – February

  35. Slide 35: After-tax Free Cash Flow

    After-tax Free Cash Flow DSV Total after-tax free cash flow of US$2.3 billion over the life of mine $500 $400 $300 $200 Cash Flow (US$M) $100 -- ($100) ($200) ($300) ($400) ($500) Y-2 Y-1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 Y18 Y19 Capital Expenditures Operating Cash Flow (Pos

  36. Slide 36: Do you have any questions?

    Do you have any questions? info@discoverysilver.com 416 613 9410 TSX: DSV | OTCQX: DSVSF | DISCOVERYSILVER.COM DSV

  37. Slide 37: Resources & Reserves

    oo000e Resources & Reserves Discoverysilver

  38. Slide 38: Resource Statement

    Resource Statement DSV GRADE CONTAINED METAL TONNES MATERIAL CLASS Ag Au Pb Zn AgEq Ag Au Pb Zn AgEq (Mt) (g/t) (g/t) (%) (%) (g/t) (Moz) (koz) (Mlb) (Mlb) (Moz) Measured 29 29 0.07 0.23 0.27 49 27 67 148 171 45 Indicated 37 24 0.06 0.25 0.29 44 28 74 207 241 53 OXIDE M&I 66 26 0.07 0.24 0.28 46 55

  39. Slide 39: Reserves Statement

    Reserves Statement DSV GRADE CONTAINED METAL TONNES MATERIAL CLASS Ag Au Pb Zn Ag Au Pb Zn (Mt) (g/t) (g/t) (%) (%) (Moz) (koz) (Mlb) (Mlb) Proven 10 46 0.08 0.35 0.38 15 0.03 0.08 0.09 OXIDE Probable 10 40 0.09 0.40 0.42 13 0.03 0.09 0.09 Total P&P 20 43 0.08 0.37 0.40 28 0.05 0.17 0.18 Proven 212