Aguia Resources Limited · ASX:AGR

Aguia Resources — Investor Presentation (November 2018)

34 slides from Aguia Resources's investor presentation, Nov 7, 2018

  1. Slide 1: November 2018 Investor Presentation

    November 2018 AGUIA Resources Limited ASX: AGR | TSXV: AGRL

  2. Slide 2: Disclaimer

    DISCLAIMER This document has been prepared as a summary only, and does not contain all information about Aguia Resources Limited (the “Company”) assets and liabilities, financial position and performance, profits and losses, prospects and the rights and liabilities attaching to the Company’s securit

  3. Slide 3: AGUIA: A Brazilian Resource Company

    AGUIA: A Brazilian Resource Company Derisked phosphate project advancing towards production  Simple open pit with infrastructure in place; rail, road, Manaus Sao Luis power, town, regional fertiliser blenders  Approval of Environmental Impact Assessment and granting of Preliminary License (LP) is

  4. Slide 4: Phosphates Forecast More Optimistic

    Phosphate Phosphates Forecast More Optimistic  Strong, less volatile demand for phosphate globally, a slowdown in new Fertilizer – MAP* CFR Brazil (USD/tonne) capacity into 2022 and supply 550 adjustments (i.e. idling of Mosaic’s Plant City in Dec. 2017) are creating tighter market conditions 500 

  5. Slide 5: Brazil Outpaces Global Demand Growth

    Brazil Outpaces Global Demand Growth Brazilian Phosphate Demand 7  Brazil is a key driver for global phosphate growth 6 CAGR: 5.7%  Demand up >2x since 5 2000 4  Due to increased; 3  Harvested land area  Fertilizer application 2 rates 1 0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2

  6. Slide 6: Brazil Phosphate Demand by Region

    Brazil Phosphate Demand by Region 7 6.5 Million Tonnes North & 6 Northeast 13% 5 4.6 Imports 4 Mt Midwest 39% Midwest Brazil has been the 3 engine of agricultural growth in recent years, but is >1,000 km from major ports Southeast 18% 2 so logistic costs and delays complicate the fertilizer supply c

  7. Slide 7: Domestic Producer Cost Advantage

    Domestic Producer Cost Advantage  Southern Brazil is 100% reliant on phosphate imports with no new mines planned or under development  Aguia has a sustained cost advantage  Southern Brazil currently consumes 1.8 Mt of 45 days phosphate imports annually1 from Morocco to  Aguia’s production of 300

  8. Slide 8: Brazil's Soil Requires lots of Nutrients

    Brazil’s Soil Requires lots of Nutrients Soybean Case Study - 2017/2018 Statistics  Increased soybean production driving phosphate demand – since 2000 CAGR 7% with yields up 31% and harvested area up 69%  In 2018/19, Brazil expected to overtake US as biggest soybean producer  Record harvests remo

  9. Slide 9: Três Estradas Phosphate Project

    Why) tt Ay RE DR ESTRADA PHOSPHATE PROJECT

  10. Slide 10: Três Estradas Summary

    Três Estradas Summary  Located in southern Brazil in the State of Rio Grande Du Sol  Open pit phosphate project, BFS completed March 2018, now awaiting permitting  Phosphate present in rock as P2O5 and will be concentrated for sale as “rock phosphate” to fertiliser plants.  Low CAPEX, existing i

  11. Slide 11: On the Pathway to Production

    On the Pathway to Production 1 2 3 Exploration Engineering & Permitting Construction  Drilled 28,300 metres increasing  BFS complete March 2018  LI allows construction to geologic assurance and commence resource classification  Pilot plant tests confirm premium recoveries and concentrate  Expec

  12. Slide 12: Três Estradas Phosphate Resource

    Três Estradas Phosphate Resource  JORC/43-101 compliant resource  36 Mt Measured @ 4.01% P2O5  47 Mt Indicated @ 4.18% P2O5  21.8 Mt Inferred @ 3.67% P2O51  28,300 meters of drilling now complete  Pilot plant scale flotation test results confirm excellent recoveries and concentrate grades for

  13. Slide 13: High-Grade Oxide Ore At Surface

    High-Grade Oxide Ore At Surface  First 4-5 years of production will focus on shallow high-grade oxide (saprolite) in the first 25 to 30 meters from surface  Measured and Indicated resource of oxidized material occurring of 5.3 million tonnes grading 8.8% P2O5 with a cut-off grade of 3% P2O5 13

  14. Slide 14: BFS Confirms Robust Economics

    BFS Confirms Robust Economics  Bankable Feasibility Study for the Três Estradas Project demonstrates the technical and economic viability of the project as a low cost producer of phosrock and calcite  Existing infrastructure and proximity to market decrease construction costs and provide a competi

  15. Slide 15: Sensitivity Analysis

    Sensitivity Analysis Sensitivity for Pre-tax, Unlevered NPV@5% 400 Nov 2018 BRL:USD exchange rate 360 320 NPV (M USD, Pre-tax) 280 240 200 P2O5 PRICE 160 OPEX CAPEX Saprolite 120 CAPEX Carbonatite Exchange Rate 80 30% 25% 20% 15% 10% 5% 0% -5% -10% -15% -20% -25% -30%  Três Estradas BFS released in

  16. Slide 16: Community and Government Outreach

    Community and Government Outreach  Named a priority development project by the Secretary of Economic Development of the Rio Grande do Sul State  Local outreach website launched for Três Estradas project providing information on development plans and positive impact on community – www.projetofosfat

  17. Slide 17: Rio Grande Do Sul Belt Consolidation

    Rio Grande Do Sul Belt Consolidation Regional geological map highlighting the Três Estradas and Joca Tavares Satellite Image of the Mato Grande Carbonatite highlighting the auger carbonatites and the exploration targets: Santa Clara, Mato Grande, Porteira drilling program that is currently in progre

  18. Slide 18: Timeline and Key Milestones

    Timeline and Key Milestones Três Estradas Project 2016 2017 2018 2019 2020 Future Resource Exploration & Development Drilling to Complete 43-101 Resource Reports Q3 2017 Permitting EIA-RIMA for industrial project Q3 2017 Environmental Permitting1 LP LI LO Q1 2019 Q1 2020 Q4 2020 Engineering Prelimin

  19. Slide 19: Rio Grande Copper Belt

    ER BELT

  20. Slide 20: New Zone of Copper Mineralization

    New Zone of Copper Mineralization1 BIG RANCH TARGET  Aguia has staked 23 tenements, totalling COPPER SOIL 340km2 (34,000 hectares), within the prolific Rio ANOMALY GOSSANS Grande Copper Belt  Mineralization is hosted in a 100km long x 60km wide belt with historical production from Iron ANDRADE DEP

  21. Slide 21: Big Ranch: Drilling Underway

    Big Ranch: Drilling Underway Chargeability map with anomalies on the northern side of the target, Dipole-Dipole grid lines and planned drill holes.  Located along northern edge of Caçapava Granite – The target extends over approximately 6 km and is characterized by significant copper- and-gold-in-s

  22. Slide 22: Exploration advancing at Canhada

    Exploration advancing at Canhada Example of copper mineralization at surface on the Canhada Target. Hydrothermally altered volcanic rock with malachite filling fractures in stockwork pattern. Sample grading 4.09% Cu. Copper in soil geochemical grid of the Canhada Target.  Located 20km south of Lavr

  23. Slide 23: Experienced Board & Management

    Experienced Board & Management Paul Pint, Executive Chairman Ryan Ptolemy, Chief Financial Officer Mr. Pint, is a capital markets professional with over 20 years of Mr. Ptolemy is a Chartered Professional Accountant, Certified General Accountant, experience in senior positions at various financial i

  24. Slide 24: Capital Structure & Financing Activities

    Capital Structure & Financing Activities AGR Performance YTD Fully Diluted Equity Ordinary Shares issued 131.5 m Options 9.5 m Warrants 20.3 m Fully Diluted 161.3 m Undiluted Market Cap at A$0.20 $26 m (31 October 2018) Fully Diluted Market Cap at A$0.20 $32 m 52 week range $0.12 - $0.41 Register –

  25. Slide 25: Competent Persons Statement

    Competent Persons Statement The Três Estradas Phosphate Project has a current JORC/43-101 compliant mineral resource which includes Measured Resources of 36 Mt grading 4.01% P2O5. Indicated Resources of 47 Mt @ 4.18% P2O5 and Inferred Resources of 21.8 Mt @ 3.67% P2O5. The Lucena Phosphate Project h

  26. Slide 26: Appendix

    APPENDIX

  27. Slide 27: Bankable Feasibility Study (BFS)

    Bankable Feasibility Study (BFS) 27 SAP – soft ore (saprolite)

  28. Slide 28: Três Estradas Mineral Resource

    Três Estradas Mineral Resource Resource Volume Tonnage Density P2O5 as Domain P2O5% Classification (m X 1,000) (T X 1,000 (T/m3) 3 Apatite (%) AMSAP 36 55 1.54 6.63 15.70 CBTSAP 491 796 1.63 10.18 24.11 Measured WMCBT 602 1,686 2.81 4.24 10.03 MCBT 11,619 33,004 2.85 3.85 9.12 MAMP 227 655 2.89 3.72

  29. Slide 29: Key Brazil Mining Permits

    Key Brazil Mining Permits • Most challenging permit milestone to obtain License (LP) Preliminary • Entails location, social and environmental approval of the project based on field studies and public hearings • Awarded by the Environmental Protection Agency of the State of Rio Grande do Sul (FEPAM)

  30. Slide 30: Principle Assumptions

    Principle Assumptions PhosRock Price Forecast (USD/t - FOB Morocco) 187 172 142 131 131 129 131 132 133 124 127 122 120 116 115 109 96 97 98 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 The Bankable Feasibility Study (BFS) referred to in this present

  31. Slide 31: Três Estradas Phosphate Permits

    Três Estradas Phosphate Permits 31

  32. Slide 32: Rio Grande Copper Permits

    Rio Grande Copper Permits g Sao Gabriel = | = a * RGP - Copper by Status Application Extension Submited Permit Permit Extension Big Ranch Target 31°S- a. = aa 32

  33. Slide 33: Copper – Supply Deficit Looms

    Copper – Supply Deficit Looms 30 Highly Probable Projects 25 Base Case Production Capability 10 million tonne deficit 20 Primary Demand by 2028 Mt 15 10 5 0 1992 1997 2002 2007 2012 2017 2022 2027 Source: Wood Mackenzie, Q4 2014 33

  34. Slide 34: Thank You

    A AGUIA THANK YOU