Etablissements Maurel & Prom Sa · EURONEXT:MAU

Etablissements Maurel & Prom Sa — Maurel & Prom — Shareholder Meeting (June 2012)

46 slides from Etablissements Maurel & Prom Sa's shareholder meeting presentation, Jun 14, 2012

  1. Slide 1: General Shareholders' Meeting

    General Shareholders’ Meeting 14 June 2012 www.maureletprom.fr

  2. Slide 2: 2011 Activity

    2011 Activity Jean-François Hénin Chairman and CEO

  3. Slide 3: Introduction – Jean-François Hénin

    Introduction – Jean-François Hénin 130 Brent 120 ($) Asset management ► Focusing resources on production assets 110 ► Exploration partnerships 111,22 ► Asset sales 100 90 Sustained activity in 2011 79,44 80 ► Increase in average production and reserves ► Strong cash flow generation 70 2010 2011 2012

  4. Slide 4: Maurel & Prom activity in 2011

    Maurel & Prom activity in 2011 Operations on Group assets Strategic alliance in Colombia and Peru Sale of MP Venezuela Distribution of MP Nigeria Exit from the country Disengagement from exploration or part of it Merger-absorption of Caroil with Tuscany Entry into the country (2012) Exercise of righ

  5. Slide 5: Group certified reserves

    Group certified reserves Additional resources in Mboe P1+P2 reserves net of royalties in Mboe 2011 production revision acquisition 2012 P1 P2 98 OMOUEYI 173.2 -5.3 8.5 176.4 56.5 119.9 103 BANIO 0.4 -0.1 0.2 0.5 0.3 0.1 GABON 173.6 -5.4 8.7 176.8 56.8 120.0 76 47 SABANERO 0.0 0.0 7.8 7.8 2.9 4.9 85

  6. Slide 6: Production profile in Gabon (at 100%)

    Production profile in Gabon (at 100%) bopd 60 000 DeGolyer and MacNaughton - 2P reserves at 1 January 2012 Maurel & Prom* estimates for 2012 and 2013 before 3D seismic study results on 14 June 2012 50 000 40 000 30 000 20 000 10 000 0 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

  7. Slide 7: Sound financial structure

    Sound financial structure Group net debt (in €M) 125 Reduction in net debt 152 95 61 Major capacity to raise additional funds -62 -118 SB -213 AFREXIM Elimination of financial risk in Colombia BGFI -368 Convertible bonds Strong cash flow in Gabon enabling -368 RBL Group and head office activities to

  8. Slide 8: 2011 Finance

    2011 Finance Michel Hochard Chief Financial Officer

  9. Slide 9: 2011 production and sale prices

    2011 production and sale prices boepd 20 000 2011 2010 18 000 Production sold bopd 14,269 11,768 16 000 Sale price US$/bbl 110.9 78.5 Gabon sales €m 414.9 253.9 14 000 Other €m 0.9 0.6 12 000 Impact of hedges €m -42.3 -37.9 Consolidated sales €m 373.6 216.6 10 000 8 000 6 000 Increase in production

  10. Slide 10: Operating margins

    Operating margins Operating income In €M 2011 2010 Sales 373.6 217.0 Improved profitability Expenses -63.6 -57.8 ► Increase in gross margin linked to increase in Other 0.8 0.3 production and in sale prices ► Increased Gross Operating Surplus, stabilisation of Gross margin 310.8 159.5 personnel expen

  11. Slide 11: Financial income and debt

    Financial income and debt Group debt: summary and changes Reserve Based Loan Date put in place: 30 January 2009 Term: 4 years Financial income Initial drawdown capacity: US$255 million Modified drawdown capacity, 21 October 2010: US$330 million Drawdown capacity in H1 2012: US$264 million (depending

  12. Slide 12: Net income

    Net income Net income Sale of Caroil In €M 2011 2010 • US$120 million in cash = €87 million; Pre-tax income 241.3 -119.8 • 81.5 million Tuscany shares, listed on the Toronto Stock Exchange Tax -98.2 -44.7 (TSX); Associates -1.3 4.5 • and 27.5 million stock options on a parity of 1:1 exercisable Net

  13. Slide 13: Cash flow and asset structure

    Cash flow and asset structure Cash flow 2011 (in €M) Balance sheet at 31 Dec. 2011 (in €M) 179 90 765 Shareholders’ equity 239 124 29 Non-current assets 1250 125 Other non-current 191 95 25 liabilities 60 TRESORERIE D'OUVERTURE INVESTISSEMENTS DIVIDENDE FLUX GENERES PAR L'ACTIVITE OPERATIONS DE CESS

  14. Slide 14: Exploration & Production

    Exploration & Production Philippe Corlay Director of Production Jean Bié Director of Exploration

  15. Slide 15: Gabon: location of producing fields

    Gabon: location of producing fields OMGW Omoueyi: 4,179 km² OMBG OMKO ONAL OMOC-N OMOC* * Exclusive exploitation authorisation applied for 14 June 2012 15

  16. Slide 16: Omoc-N: update on incident

    Omoc-N: update on incident Findings • End January: production higher than projections • Collapse at PF Omoc-N-100 during drilling of Omoc-N-104 well Consequences • Production halted on two producing wells • Impossibility of putting Omoc-N-103 well already drilled into production • Impossibility of d

  17. Slide 17: Omoc-N: focus on reasons behind the collapse

    Omoc-N: focus on reasons behind the collapse 14 June 2012 17

  18. Slide 18: Omoc-N: focus on the drilling postponement

    Omoc-N: focus on the drilling postponement Weeks - 2012 52 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 w 1 2 3 4 5 6 7 8 9 inj inj inj Caroil-4 Omoc-N-103 Omoc-N-104 Omoc-N-105 Omoc-N-503 Omoc-N-106 Omoc-N-107 Omoc-

  19. Slide 19: Omoc and Omoc-N: Kissenda development

    Omoc and Omoc-N: Kissenda development boepd 12 000 DeGolyer and MacNaughton - 2P reserves at 1 January 2012 Omoc-Nord 10 000 Maurel & Prom estimates for 2012 and 2013 A+C before 3D seismic study results on 14 June 2012 8 000 6 000 4 000 2 000 0 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

  20. Slide 20: Onal (Grès de base): optimisation of water injection

    Onal (Grès de base): optimisation of water injection Findings • Pilot water injection project put in place in 2010 • Evidence of a more heterogeneous reservoir than predicted by initial static data • Evidence of fast water flows at some producing wells • Pressure not sustained to some other wells Co

  21. Slide 21: Onal (GdB): production profile

    Onal (GdB): production profile boepd 40 000 Pilot injection Development after 3D seismic 2010-2012 35 000 30 000 DeGolyer and MacNaughton - 2P reserves at 1 January 2012 Maurel & Prom estimates for 2012 and 2013 before 3D seismic study results on 14 June 2012 25 000 20 000 15 000 10 000 5 000 0 2012

  22. Slide 22: Omko: effectiveness of water injection

    Omko: effectiveness of water injection Start water injection boepd Findings • Water injection effective • Increase in production Action plan • Acquire 3D seismic data • Postpone North field development boepd 5 000 4 500 4 000 3 500 3 000 DeGolyer and MacNaughton - 2P reserves at 1 January 2012 2 500

  23. Slide 23: Omgw: successful water injection program

    Omgw: successfull water injection program Start of water injection boepd Findings •Water injection seems effective •Increase in production Action plan •Acquire 3D seismic data •Postpone North field development 4 500 Consequences 4 000 •In line with projections 3 500 Production profile 3 000 boepd bo

  24. Slide 24: Ombg: production profile

    Ombg: production profile Findings • One well in production • Decline in production boepd DeGolyer and MacNaughton – 2P reserves at 1 January 2012 2 500 Action plan Maurel & Prom estimates for 2012 and 2013 before 3D seismic study results on 14 June 2012 • Acquire 3D seismic data 2 000 Consequences •

  25. Slide 25: Omoueyi: Acquisition of 3D seismic

    Omoueyi: Acquisition of 3D seismic Area being acquired: 337 km² Complete coverage of all Omoueyi fields Onal, Omko, Ombg, Omgw, Omoc and Omoc-N South part of the basin Omal exploration zone North basin west of Omko Acquisition cost: US$27 million 14 June 2012 25

  26. Slide 26: Gabon: regions to explore

    Gabon: regions to explore Omoueyi – 100% GABON • 2D seismic acquisition under way • 3D seismic acquisition under way Kari – 100% • 2D seismic acquisition under way Omoueyi • Recording under way 4,178 km² • HRAM recording Kari Etekamba 2,659 km² Nyanga Mayombe – 100% 580 km² • Two topics researched:

  27. Slide 27: Gabon: 2D seismic campaign

    Gabon: 2D seismic campaign Gamba Sandstones Mélania Sandstones Nyanga Kissenda Sandstones Mayombe Basal Sandstones 2D seismic 2012 (500km) Kari Gamba Sandstones Banio Carbonates 2D seismic 2012 (300km) 14 June 2012 27

  28. Slide 28: Congo

    Congo La Noumbi 2,827 km² Forages prévus : M&P 49% operator - Kola 1 : Chela - Kola 2 : Chela + Vandji Eni 37% Afren 14% Lead ADoungou NW Vandji 35.8 km² Djeno 9.1 km² Lead E Chela 31 km² 14 June 2012 28

  29. Slide 29: Namibia

    Namibia Block 0044 M&P 37% operator 5,122 km² PGS 48% Other 15% Block 0045 17,133 km² 2012 2D seismic campaign: 5,000 km 14 June 2012 29

  30. Slide 30: Colombia: strategic alliance

    Colombia: strategic alliance Sale to Pacific Rubiales Energy of 49.999% of MP Colombia COR-15 MP Colombia 100% 1- Payment of PRE to M&P of US$63 million Muisca 2- PRE bears the exploration risks: MP Colombia 100% carries exploration on the following permits: • Sabanero and COR-15, unlimited; • SSJN-

  31. Slide 31: Colombia: start of Sabanero production

    Colombia: start of Sabanero production 2500 Sabanero field 2000 • Discovered in 2010 by MP Colombia • Located 250 km east of Bogota • 40 km as the crow flies from the Rubiales field 1500 BOPD 1000 Development characteristics • Heavy oil: 12°API • High water production 500 • Thin reservoir • 6% of ro

  32. Slide 32: COR-15 and Muisca (Colombia)

    COR-15 and Muisca (Colombia) Oil discovered Gas discovered Area 1,194 Km² COR-15 1,194 km² COR 15 Muisca 2,320km² Muisca 14 June 2012 32

  33. Slide 33: CPO-17 (Colombia)

    CPO-17 (Colombia) CPO-17 2,104 km² Dorcas-1 Merlin-1 and Merlin-2ST Test with ESP 725 bbl of oil at 8.2°API, Viscosity 5,000 cP. Injection of thinner at base. 8.5°API 3,456 bbl of water. Viscosity 3,000 cP in reservoir condition Decision to repeat test as cold production with a more powerful pump. T

  34. Slide 34: SSJN-9

    SSJN-9 SSJN-9 2,647 km² COR 15 1 194 km² 3D SEISMIC : 380 Km² 2D REPROCESSED LINES: 560 km Prospect SANTA-FE 14 June 2012 34

  35. Slide 35: Peru

    Peru Surface facilities: • Location of the first prospect • 2.5 ha platform. • Camps set up on the military base Drilling rig and equipment • Equipment transported by helicopter, plane and river Duration of project: 18 months (2 wells) • Civil engineering: 4 months • Rig Move/Rig up: 2 months • Dril

  36. Slide 36: East Africa

    East Africa Gas discovered Gas fields in production M&P option MKuranga Mafia Deep Block 4 BG/Ophir Songo Songo Bigwa-Rufiji-Mafia M&P 60% operator Block 2 Statoil/Exxon 12,025 km² Block 1 Mnazi Bay BG/Ophir Tanzania M&P 48% operator Area 4 Mnazi Bay Eni 756 km² Rovuma offshore Rovuma Onshore Anadar

  37. Slide 37: Tanzanie

    Tanzanie Bigwa-Rufiji-Mafia M’Kuranga gas field - 2D seismic - Selection of a new well to drill Mnazi Bay Production - 3 workovers in progress Ziwani-1 well drilling confirmed - The quality of Oligocène reservoir - The gas upsides (Pliocène) - The trap Next step - review of existing seimsic data - i

  38. Slide 38: Mozambique

    Mozambique M&P 27,71% Anadarko operator 13,315 km² 2D seismic campaign in progress (900 km) in North-East part Close to recent big discoveries 15 km Source: Anadarko - Eni 14 June 2012 38

  39. Slide 39: 2012 Outlook

    2012 Outlook Jean-François Hénin Chairman and CEO

  40. Slide 40: 2012 Strategy

    2012 Strategy 2012 Priority Increase production Acquire know-how in development of different deposits (heavy oil, water injection) Renew reserves 2012 Action plan Develop the Sabanero field and acquire experience in heavy oil Consolidate the development plans for the Omoueyi fields Discover new fiel

  41. Slide 41: Key figures 2012

    Key figures 2012 Production at 100% 2012 investments in US$M 25 000 22,000 20 000 18,140 125 +7% 14,618 15 000 +24% Exploration In bopd Colombie Développement Gabon 10 000 269 5 000 0 2010 2011 2012e 14 June 2012 41

  42. Slide 42: Shareholders

    Shareholders Jean-François Hénin Chairman and CEO

  43. Slide 43: M&P and MP Nigeria share price since 1/1/2011

    M&P and MP Nigeria share price since 1/1/2011 20 18 16 14 12 10 8 6 4 2 0 14 June 2012 43

  44. Slide 44: Analyst coverage

    Analyst coverage 10% 10% 11% 11% 20% 20% 20% 20% 18% 18% 18% 20% Cheuvreux Exane Natixis Deutsche Bank 50% 50% 56% 56% Tudor Pickering 45% 45% 45% 50% 50% 50% 50% 50% Standard Bank Arkeon Aurel BCG CM-CIC Kepler Goldman Sachs 40% 40% 36% 36% 36% 33% 33% 30% 30% 30% 30% 30% Jun-11 Jul-11 Aug-11 Sep-1

  45. Slide 45: Shareholding structure

    Shareholding structure Employees Individuals 1% 28% Treasury shares Institutionals 5% 36% Macif 7% 0.5% 8.0% Strategic Pacifico shareholders 24% 36% 16.6% 48.5% 26.4% France Continental Europe (excl. France) North America UK & Ireland Rest of the World 14 June 2012 45

  46. Slide 46: www.maureletprom.fr

    www.maureletprom.fr

Maurel & Prom — Shareholder Meeting (June 2012) on 6ix