Slide 1: Early Production Systems
Early Production Systems Presented by: Zak Stoianovici Sr. Strategic Business Manager Halliburton Testing & Subsea
Slide 2: Agenda
Agenda ▌ Value Moment ▌ PSL Presentation ▌ EPS value proposition ▌ EPS types and specifics ▌ Key Success Factors ▌ Examples of EPS from Present and Past ▌ Business models ▌ Questions © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2
Slide 3: Safety Alignment
Safety Alignment © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3
Slide 4: Halliburton Organization
Halliburton Organization Division Drilling & Evaluation Completion & Production Landmark Software & Sperry Drill Bits Wireline Testing & Product Service Line (PSL) Baroid Services Drilling & Services & Perforating Subsea © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4
Slide 5: Testing and Subsea Sub-PSLs
Testing and Subsea Sub-PSLs Well Testing Testing Subseaand Safety Subsea Early Production Systems Systems Downhole Test Tools Data Acquisition Fluid Sampling Surface Well Test © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5
Slide 6: EPS scope of work and value proposition
EPS scope of work: Bridge the exploration and field development phases EPS value proposition : ▌ Provide revenue, while offering large volumes of information collected on reservoir extent, size, complexity and production behavior ( further exploration/ appraisal development plans assessment and opti
Slide 7: EPS type Halliburton will handle
EPS type Halliburton will handle ▌ Extended Well Test packages Recent Examples: ▌ Low Pressure Systems ▌ Early Production Facilities East Zeitco Egypt ▌ Complex Temporary Facilities Quarun Egypt Geopark Colombia Installed onshore or offshore : Ecopetrol Colombia ▌ Land /Arctic/Desert/Jungle/ Cairn I
Slide 8: EPS complexity: from basic SWT to EWT to basic EPF
EPS complexity: from basic SWT to EWT to basic EPF Complex EPFs and increasing additional capacity Gas Gas Conditioning Compression “SWT” Temporary Pump 1sep stage Oil Store Transfer/Export Adding Capacity +1sep 2sep stage Oil Conditioning Adding Capacity +1sep Water Treatment PLC/ Steam Power Air E
Slide 9: EPS specifics
EPS specifics ▌ Modular design ▌ Plug and Play capability ▌ Heliportable option ▌ Fast Track approach (existing designs, modules/units) ▌ Exceeding requirements through specifications ▌ Stand alone production system or integrated into existing facilities ▌ Flexible volume processing, adding units in
Slide 10: Design Specifications Typically used
Design Specifications Typically used ASME B31.3 (ANSI Power Piping Code ANSI B31.3) ASME Boiler and Pressure Vessel Code ASMEVIII Div1&2 API 6A (API Specification for Wellhead and Xmas Tree Equipment API 6A and Fire Safe Rating 6F where applicable) API Recommend Practice for Design and Insta
Slide 11: Projects Delivery Contingencies, Key Success Factors
Projects Delivery Contingencies, Key Success Factors ▌ Key Project Personnel identified and nominated in early stages of the project ▌ Early Stages Design, FEED Studies, Hazops, Risk Assessments ▌ Global Engineering and Technical Support Team Involvement ▌ Equipment qualification on processes specif
Slide 12: EPS typical organogram
EPS typical organogram SBM/Project Sponsor Zak Stoianovici Project Mng / Technical Sales Engineering Mng Procurement Lead Ops Mng Commercial Rod Gravette Sunil P Instrumentation Project Procurement Process Eng Installation Mng Commissioning and PLC Engineer Lead Umesh Nair Ashish Sawant Tharma Kapil
Slide 13: Examples of EPSs
Examples of EPSs © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 13
Slide 14: EPFs India, Rajasthan Blocks, 2x
EPFs India, Rajasthan Blocks, 2 x ▌ 2x EPF to cover from 16 to38 API, and 5%-to 30% wax, heavy oils, heavy emulsions, large water cut (over 60%), low temp, high WAT. ▌ Marginal fields, 1000-3500bbls fluid/day, ▌ 3 stage of separation, oil conditioning, transfer to road tankers, ▌ Remote location, sp
Slide 15: GeoPark – Colombia
GeoPark – Colombia ▌ Field : TUA 1, added production further from 2,3,4 ▌ Start : Sept 2012 ▌ Type : EPF/ Heavy oil separation, temporary storage /export ▌ Achieved: Fast track delivery, upgraded to 2nd train Oct 2012, upgrading to 3rd train April 2013 © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 15
Slide 16: Ecopetrol - Colombia
Ecopetrol - Colombia ▌ Field: Pozo Aullador- 1 ▌ Start: Feb 2013 ▌ Type: EPF/ Heavy oil separation, conditioning, temporary storage /export ▌ Achieved: Fast track delivery © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 16
Slide 17: Noble EG EWT
Noble EG EWT ▌ API – 29.7, waxy oils ▌ CO2 – 32% ▌ Oil rate – 7,500 bopd ▌ Gas rate – 20MMscf/d ▌ Services provided include: 7” DST string c/w Armada samplers 6 3/8” Subsea Test Tree landing string Surface well test package capable of exporting crude oil to a nearby tanker via a 3rd party hose
Slide 18: Business Models
Business Models Delivery Service Quality assurance : ▌ Safety Health and Environment KPI ▌ System capability and flexibility as volumes, types of processes ▌ Product output quality (BSW%, RVP, Pressure, Temp, ppm) ▌ Custody Transfer Metering accuracy. ▌ Production Uptime % Flexible Commercial propos
Slide 19: THANK YOU!
THANK YOU! For direct contact please use the following details: Sunil Premchandani Global Technical Sales Manager (EWT/EPF) Direct Tel : +9714 3036887 Mobile Dubai : + 971 55 2246887 Desk Cisco VOIP : 88 530 6887 Sunil.Premchandani@Halliburton.com Zak Stoianovici SBM Production Systems Direct Tel :